Behind the Scenes at QM-2: Getting Ready to Test the World’s Largest Solid Rocket Motor

By Beverly Perry

For two monumental minutes on June 28, the Space Launch System (SLS) solid rocket boosters — the largest ever built for flight — will fire up in an amazing display of power as engineers verify their designs in the last full-scale test before SLS’s first flight in late 2018. Each piece of hardware that’s qualified and each major test — like this one, dubbed QM-2 — puts NASA one step closer on its Journey to Mars.

The smoke and fire may last only two minutes, but engineers at NASA’s Marshall Space Flight Center in Huntsville, Alabama and Orbital ATK in Promontory, Utah have been preparing weeks — even months — in advance for the static test of Qualification Motor 2 (QM-2). Here’s a behind-the-scenes look at what goes into getting ready to fire up the largest and most powerful solid rocket motor ever built for flight.

T (for test) minus weeks and months. In the months prior to the test, propellant-filled segments began arriving at Orbital ATK’s Test Bay T-97 after being cast in nearby facilities. Many of these segments are veterans of space shuttle flights. In fact, the various metal case segments that comprise the five-segment QM-2 motor flew on 48 shuttle flights!

T minus 14 days. In the two weeks leading up to the test, Orbital ATK engineers begin dry runs that simulate the final test as closely as possible (without the smoke and fire). They put the motor and associated systems through their paces no fewer than 11 times before the big day to ensure not only that all systems are functioning as expected, but also that the test will be executed properly. “We only get one shot at firing the rocket motor,” says Dr. Janica Cheney, Orbital ATK’s director of Test Operations. “All the dry runs and other preparations that take place ahead of time are critical to ensuring we get the data we need from this test firing.”

NASA and Orbital ATK test SLS Qualification Motor-2 (QM-2) before first flight.
Are you ready? It’s time for the final full-scale test before the first flight test of the SLS solid rocket motor June 28 at 10:05 a.m. EDT (8:05 a.m. MDT). Many cameras record data during the test, such as this one which captures nozzle plug performance during the test.

T minus 24 hours. For this final full-scale static test, engineers have 82 goals, or test objectives, they need to measure and evaluate. One day before the test, it’s crunch time; caffeine’s flowing as engineers work around the clock the day before the test to ensure all systems function properly and all necessary data can be collected.

T minus 8 hours. Game day. There’s focus — and excitement. There are two more dry runs leading up to the test. Engineers, technicians and operators are “on station,” — present and accounted for at key locations such as the test bay, the instrument rooms and the control bunker. When you hear “control bunker,” think mission control — a command and control center that directs every aspect of the test, similar to what you see at mission control during a launch. Time flies during the final eight hours before the test.

Orbital ATK’s Test Bay housing rolls back to reveal Qualification Motor-2 (QM-2).
At T minus 6 hours with a “go” decision for testing QM-2, engineers at Orbital ATK will roll back the booster test bay housing so the massive motor can be fired.

T minus 6 hours. At 4:05 a.m. EDT (2:05 a.m. MDT), engineers and managers at Orbital ATK and NASA will make a “go” or “no go” decision on testing that day. Assuming the test’s a go, technicians “roll back” Orbital ATK’s specially designed moveable test bay housing and begin running final checks to make sure everything is ready. “We check the status of all the data and control systems, the test bay, the motor preparation and weather conditions,” Cheney says.

Weather is one variable that can halt the QM-2 test. “We make sure there’s no lightning in the area; no high winds; no storms,” explains Orbital ATK Fire Chief Blair Westergard. “We also establish fire breaks. Along with the Box Elder County Fire District, we’re prepared to extinguish any secondary wildfires too.”

Engineers also make sure cameras are ready to film and all data recording systems are online and functioning properly. Orbital ATK Security ensures the area around the test is clear.

T minus 3 hours. Crowds begin to gather as the public viewing area near Promontory off State Route 83 opens at 7:30 a.m. EDT (5:30 a.m. MDT). Orbital ATK Security directs traffic with the help of the Utah Highway Patrol and provides crowd control support to ensure everything remains orderly — vital when 10,000 people are in attendance.

https://www.youtube.com/watch?v=https://www.youtube.com/watch?v=c-xrhYKC0q4[/embedyt]

If you do not see the video above, please make sure the URL at the top of the page reads http, not https.

T minus 1 hour. The formal countdown commences; the public address system broadcast begins. The crew in the test bay begins final procedures to prepare the booster for testing.

T minus 9 minutes. Final system and timing checks are underway.

T minus 4 minutes. A “go for test” announcement sounds from the public address system.

T minus 1 minute. A siren begins; it will blare through T minus 20 seconds.

T minus 45 seconds. The “Safe and Arm” system sequence begins, which arms the motor. The Safe and Arm device is remotely activated from the “safe” position into the “armed” position, allowing the motor to ignite when the “fire” command is given.

T minus zero. At 10:05 a.m. EDT (8:05 MDT), two minutes of pure awesome commence as the gigantic motor burns through about five and a half tons of propellant each second during the approximately two-minute test. Inside the control bunker, there will be jubilation — and relief. “This is serious business — this is rocket science,” Cheney emphasizes. “But there’s nothing better than the smoke and fire and the data that comes with it when you’ve had a successful day. Our success is NASA’s success — we don’t do it alone.”


Join in the conversation: Visit our Facebook page to comment on the post about this blog. We’d love to hear your feedback!

Three Cool Facts About QM-2

By Beverly Perry

The countdown to the last full-scale test firing of the massive Space Launch System (SLS) solid rocket boosters has begun. Mark your calendars: June 28, 8:05 a.m. MDT.

Expect two minutes of shock and awesome as the flight-like motor burns through about six tons of propellant each second during the test. With expanding gases and flames exiting the nozzle at speeds in excess of Mach 3 and temperatures reaching 3,700 degrees Fahrenheit, say goodbye to some of the sand at Orbital ATK’s test facility in the Utah desert because after the test, the sand at the aft, or rear, end of the booster motor will be glass.

NASA and Orbital ATK are rolling back the house and rocking the Utah desert for QM-2 June 28.
NASA and Orbital ATK are rolling back the house and rocking the Utah desert for QM-2 June 28.

The 154-foot long Qualification Motor 2 (QM-2) consists of the five propellant-filled segments in the middle of the booster; the aft skirt is also part of the test, but the forward assembly (nose cap, forward skirt) won’t be. (See our Boosters 101* infographic if you need a refresher on booster parts and assemblies). The test will broadcast live on NASA TV and our Facebook page. We will also live tweet from @NASA_SLS on Twitter.

For those watching at home (or work), here are three cool things that might not be so obvious on the screen, in countdown order.

3. This motor’s chill. QM-2’s been chilling — literally, down to 40 degrees — since the first week in May in Orbital ATK’s “test bay housing,” a special building on rails that moves to enclose the booster and rolls back so the motor can be test-fired. Even though SLS will launch from the normally balmy Kennedy Space Center in Florida, temperatures can vary there and engineers need to be sure the booster will perform as expected whether the propellant inside the motor is 40 degrees or 90 degrees (the temperature of the propellant during the first full-scale test, Qualification Motor 1 or QM-1).

2. This booster’s on lockdown. If you happen to be near Promontory, Utah on June 28, you can view the test for yourself in the public viewing area off State Route 83. And don’t worry, this booster’s not going anywhere — engineers have it locked down. The motor is held securely in place by Orbital ATK’s T-97 test stand.

During the test, the motor will push against a forward thrust block with more than three million pounds of force. Holding down the rocket motor is more than 13 million pounds of concrete — most of which is underground. The test stand contains a system of load cells that enable engineers to measure the thrust the motor produces and verify their predictions.

Solid rocket booster test burns so hot it turns sand to glass.
The solid rocket motor test firing will burn so hot the sand at the aft end of the motor will turn to glass.

Putting out the fire at the end of the test is the job of the quench system, which fills the motor with carbon dioxide from both ends of the test stand. A deluge system sprays water on the motor to keep the metal case from getting too hot so the hardware can be re-used. Both the quench and deluge systems had to be upgraded to handle the heat and size of the big five-segment boosters.

1. Next time, it’s for real. These solid rocket boosters are the largest and most powerful ever built for flight. They’ve been tested and retested in both full-scale and smaller subsystem-level tests. Engineers have upgraded and revamped vital parts like the nozzle, insulation and avionics control systems. They’ve analyzed loads and thrust, run models and simulations, and are nearing the end of verifying their designs will work as expected.

Most of this work was necessary because, plainly put, SLS needs bigger boosters. Bigger boosters mean bolder missions – like around the moon during the first integrated mission of SLS and Orion. So the next time we see these solid rocket motors fire, they will be propelling SLS off the launch pad at Kennedy Space Center and on its first flight with Orion. For real.

Next time: Behind the Scenes at QM-2: Getting Ready to Test the World’s Largest Solid Rocket Motor.


Join in the conversation: Visit our Facebook page to comment on the post about this blog. We’d love to hear your feedback!