NASA, Boeing and United Launch Alliance (ULA) have scrubbed the Aug. 3 launch attempt of the agency’s Orbital Flight Test-2 to the International Space Station due to unexpected valve position indications in the Starliner propulsion system. ULA will begin removing propellant from the Atlas V rocket.
Pending resolution of the forward work, our next available launch opportunity would be 12:57 p.m. EDT on Wednesday, Aug. 4.
For more information on the technical issue, click here.
This morning, Aug. 2, Boeing’s CST-100 Starliner spacecraft and the United Launch Alliance (ULA) Atlas V rocket rolled out of the ULA Vertical Integration Facility (VIF) to return to the launch pad at Space Launch Complex-41 on Cape Canaveral Space Force Station in Florida ahead of NASA’s Boeing Orbital Flight Test-2 mission to the International Space Station. Liftoff is scheduled for 1:20 p.m. EDT on Tuesday, Aug. 3.
Starliner and the Atlas V rocket made the first trip to the launch pad on July 29, but rolled back to the VIF on July 30 to avoid potential inclement weather.
For a launch Tuesday, meteorologists with the U.S. Space Force 45th Weather Squadron are predicting a 60% chance of favorable weather. The primary weather concerns for launch day are the cumulus cloud rule, lightning rule, and thick cloud rule violations during the instantaneous launch window.
NASA TV will cover the upcoming prelaunch, launch, and docking activities. Mission coverage is as follows (all times Eastern):
Tuesday, Aug. 3
12:30 p.m. – NASA TV launch coverage begins for a targeted 1:20 p.m. liftoff. NASA TV will have continuous coverage through Starliner orbital insertion.
3:30 p.m. (approximately) – Postlaunch news conference on NASA TV.
Wednesday, Aug. 4
10:30 a.m. – NASA TV rendezvous and docking coverage begins.
Boeing’s Starliner spacecraft on the United Launch Alliance (ULA) Atlas V rocket was rolled back from the launch pad at Cape Canaveral Space Force Station in Florida to ULA’s nearby Vertical Integration Facility on July 30 to avoid potential inclement weather in advance of Orbital Flight Test-2’s (OFT-2) launch to the International Space Station.
NASA and Boeing agreed to stand down from the July 30 attempt to allow the space station team time to continue working checkouts of the newly arrived Roscosmos’ Nauka module and to ensure the station will be ready for Starliner’s arrival. The earliest possible launch opportunity to the space station is no earlier than 1:20 p.m. EDT Tuesday, Aug. 3, from Space Launch Complex-41.
The U.S. Space Force 45th Weather Squadron predicts a 60% chance of favorable conditions for the Aug. 3 launch opportunity with the cumulous cloud rule, surface electric fields rule, and the lighting rule as the primary weather concerns.
The OFT-2 mission for NASA’s Commercial Crew Program will test the end-to-end capabilities of Starliner from launch to docking to a return to Earth in the desert of the western United States.
The rollout of the Starliner spacecraft and Atlas V launch vehicle is now targeted for Thursday, July 29 at 8 a.m. EDT.
The delay is due to an internet service provider outage that could not be resolved before the onset of predicted weather exceeding operational constraints. The OFT-2 launch, planned for Friday, July 30, at 2:53 p.m. EDT, remains on track.
Teams from NASA, Boeing and United Launch Alliance completed a launch readiness review on July 27 ahead of NASA’s Boeing Orbital Flight Test-2 mission to the International Space Station. The launch teams still are “go” for launch of Boeing’s CST-100 Starliner spacecraft on a mission to the microgravity laboratory on the company’s second uncrewed flight test.
Launch is scheduled at 2:53 p.m. EDT on Friday, July 30, on a United Launch Alliance Atlas V rocket from Space Launch Complex-41 at Cape Canaveral Space Force Station in Florida.
At 1 p.m., NASA will host a prelaunch news briefing at the agency’s Kennedy Space Center in Florida. Participants are:
Steve Stich, manager, NASA’s Commercial Crew Program
Joel Montalbano, manager, NASA’s International Space Station Program
John Vollmer, vice president and program manager, Boeing Commercial Crew Program
Gary Wentz, vice president, Government and Commercial Programs, ULA
Jennifer Buchli, deputy chief scientist, NASA’s International Space Station Program
Will Ulrich, launch weather officer, U.S. Space Force, 45th Weather Squadron
For a launch Friday, meteorologists with the U.S. Space Force 45th Weather Squadron are predicting a 40% chance of favorable weather. The primary weather concerns for launch day are the cumulus cloud rule, surface electric rule and lightning rule violations during the instantaneous launch window.
NASA and Boeing are taking another major step on the path to regular human spaceflight launches to the International Space Station on American rockets and spacecraft from American soil with the second uncrewed flight test of Boeing’s CST-100 Starliner as part of the agency’s Commercial Crew Program.
NASA’s Boeing Orbital Flight Test-2 (OFT-2) is targeting launch of the Starliner spacecraft on a United Launch Alliance Atlas V rocket at 2:53 p.m. EDT Friday, July 30, from Space Launch Complex-41 on Cape Canaveral Space Force Station in Florida. Starliner is expected to arrive at the space station for docking about 24 hours later with more than 400 pounds of NASA cargo and crew supplies.
The mission will test the end-to-end capabilities of Starliner from launch to docking, atmospheric re-entry, and a desert landing in the western United States. OFT-2 will provide valuable data that will help NASA certify Boeing’s crew transportation system to carry astronauts to and from the space station.
NASA and Boeing are proceeding with plans for the uncrewed Orbital Flight Test-2 (OFT-2) mission to the International Space Station following a full day of briefings and discussion during a Flight Readiness Review that took place at the agency’s Kennedy Space Center in Florida.
Launch of the CST-100 Starliner spacecraft on a United Launch Alliance Atlas V rocket is scheduled for 2:53 p.m. EDT Friday, July 30, from Space Launch Complex-41 on Cape Canaveral Space Force Station as part of NASA’s Commercial Crew Program.
OFT-2 will test the end-to-end capabilities of Starliner from launch to docking, atmospheric re-entry, and a desert landing in the western United States. OFT-2 will provide valuable data that will help NASA certify Boeing’s crew transportation system to carry astronauts to and from the space station.
At 6 p.m., NASA and Boeing will hold a flight readiness review media teleconference at Kennedy with the following representatives:
Kathryn Lueders, associate administrator, Human Exploration and Operations Mission Directorate at NASA
Steve Stich, manager, NASA’s Commercial Crew Program
Joel Montalbano, manager, NASA’s International Space Station Program
John Vollmer, vice president and program manager, Boeing Commercial Crew Program
NASA and Boeing are holding a Flight Readiness Review (FRR) today at the agency’s Kennedy Space Center in Florida in preparation for the Orbital Flight Test-2 (OFT-2) mission to the International Space Station as part of the agency’s Commercial Crew Program.
Teams have gathered to hear presentations from key mission managers as part of an in-depth assessment on the readiness of flight for Boeing’s CST-100 Starliner spacecraft and systems, mission operations, support functions and readiness of the space station program to support Starliner’s mission to the microgravity laboratory.
Kathryn Lueders, associate administrator for NASA’s human exploration and operations, is leading the meeting. The senior Boeing official at the review is John Vollmer, vice president and program manager for Boeing’s Commercial Crew Program. The meeting will conclude with a poll of all members of the review board.
At 6 p.m. or one hour after the readiness review, NASA and Boeing will hold a media teleconference to discuss the review and status to flight with the following participants:
Kathryn Lueders, associate administrator, Human Exploration and Operations Mission Directorate at NASA
Steve Stich, manager, NASA’s Commercial Crew Program
Joel Montalbano, manager, NASA’s International Space Station Program
John Vollmer, vice president and program manager, Boeing Commercial Crew Program
Launch of Starliner is targeted at 2:53 p.m. EDT Friday, July 30, on a United Launch Alliance Atlas V rocket from Space Launch Complex-41 on Cape Canaveral Space Force Station in Florida; the spacecraft will rendezvous and dock with the orbiting laboratory about a day later.
The flight test will provide valuable data NASA will review as part of the process to certify Boeing’s crew transportation system is as safe as possible for carrying astronauts to and from the space station.
NASA will provide coverage of the upcoming prelaunch, launch, and docking activities for the agency’s Boeing Orbital Flight Test-2 (OFT-2) mission to the International Space Station. Scheduled to launch at 2:53 p.m. EDT Friday, July 30, OFT-2 is the second uncrewed flight for Boeing’s CST-100 Starliner spacecraft as part of the agency’s Commercial Crew Program.
Starliner will launch on a United Launch Alliance (ULA) Atlas V rocket from Space Launch Complex-41 at Cape Canaveral Space Force Station in Florida. About 31 minutes after launch, Starliner will reach its preliminary orbit. It is scheduled to dock to the space station at 3:06 p.m. Saturday, July 31. Prelaunch activities, launch, and docking will air live on NASA Television, the NASA app, and the agency’s website.
The spacecraft will carry more than 400 pounds of NASA cargo and crew supplies to the space station and return to Earth with more than 550 pounds of cargo, including reusable Nitrogen Oxygen Recharge System (NORS) tanks that provide breathable air to station crew members.
OFT-2 will demonstrate the end-to-end capabilities of the Starliner spacecraft and Atlas V rocket from launch to docking to a return to Earth in the desert of the western United States. The uncrewed mission will provide valuable data toward NASA certifying Boeing’s crew transportation system for regular flights with astronauts to and from the space station.
For a complete list of NASA’s Boeing OFT-2 briefings, events, and participants, read the full media advisory.
Boeing’s CST-100 Starliner spacecraft is fully assembled on its ride to space, the United Launch Alliance (ULA) Atlas V rocket, in preparation for the 2:53 p.m. Friday, July 30, launch of its second Orbital Flight Test (OFT-2) in collaboration with NASA’s Commercial Crew Program.
The joining of Atlas V and Starliner is a major milestone ahead of the second uncrewed flight test to demonstrate the system’s human transportation capabilities to the International Space Station. The test is the last flight before the Starliner system launches American astronauts on the Crew Flight Test to the microgravity laboratory – the first flight test with crew on board.
Early Saturday, the capsule traveled from Boeing’s Commercial Crew and Cargo Processing Facility (C3PF) at NASA’s Kennedy Space Center to ULA’s Vertical Integration Facility (VIF) at Cape Canaveral Space Force Station for hoisting on top of the Atlas V.
ULA’s motorized payload transporter, adapted to carry Starliner, moved at a top speed of 5 mph, heading from the C3PF, a former space shuttle hangar, eastward to the beach and then southward to Space Launch Complex-41. During the transport, Starliner was provided environmental controls also on the transporter deck.
Approaching the VIF, the transporter maneuvered up to the 30-story-tall building’s doorway and parked. A four-point lifting sling, called the Handling Fixture Hoist Tool, was connected to the Starliner for the overhead crane to carefully raise the capsule onto the Atlas V waiting inside the VIF aboard its mobile launch platform.
Starliner was positioned for mating to the launch vehicle adapter that serves as the spacecraft’s cradle on the rocket during ascent. The adapter also features the aeroskirt structure that smooths the air over the combined payload and Atlas V for aerodynamic stability.
Accommodations for Starliner in the VIF include a clean enclosure to enter the capsule’s crew module through the hatchway, access stands for technicians to detach the lift sling and complete preflight work to the spacecraft’s exterior, as well as power and data transmission umbilicals and purge and cooling lines.
Next up is the integrated systems test, a tip-to-tail electrical check of the 172-foot-tall Atlas V and Starliner stack.
OFT-2 will launch Starliner on a mission to rendezvous and dock to the International Space Station and then return about five to 10 days later to land in the western United States. The mission is an end-to-end test flight to prove the system is ready to fly astronauts.