Mars 2020 Rover Undergoing Processing at Florida Spaceport

Mars 2020 rover at Kennedy Space Center
The launch of the Mars 2020 rover is targeted for mid-July. Photo credit: NASA/Kim Shiflett

Soon after its arrival to NASA’s Kennedy Space Center last week, the Mars 2020 rover was moved to the Florida spaceport’s Payload Hazardous Servicing Facility, where it has been undergoing processing for its mission later this year. The spacecraft was flown to Kennedy from California aboard a C-17 aircraft on Feb. 12.

Targeted for mid-July 2020, the mission will launch aboard a United Launch Alliance Atlas V 541 rocket from Cape Canaveral Air Force Station. The launch is managed by the Launch Services Program.

The Mars 2020 rover will search for signs of past microbial life, characterize the planet’s climate and geology, collect samples for future return to Earth and pave the way for human exploration of Mars.

NASA Continues With Important Testing of Mars 2020 Rover Aeroshell

Mars 2020 rover aeroshell spin table tests
At NASA’s Kennedy Space Center, tests to measure the center of gravity and moments of inertia for the Mars 2020 rover aeroshell are performed on the spin table inside the Florida spaceport’s Payload Hazardous Servicing Facility. Photo credit: NASA/Kim Shiflett

Tests to measure the center of gravity and moments of inertia for the Mars 2020 rover aeroshell were performed on the spin table inside the Payload Hazardous Servicing Facility at NASA’s Kennedy Space Center in Florida.

The rover is being manufactured at NASA’s Jet Propulsion Laboratory in California and, once complete, will be delivered to Kennedy in mid-February. The rover’s heat shield and back shell arrived at Kennedy last month.

The mission is scheduled to launch this summer from Cape Canaveral Air Force Station aboard a United Launch Alliance Atlas V 541 rocket. NASA’s Launch Services Program based at Kennedy is managing the launch.

Carrying seven different scientific instruments, the Mars 2020 rover will land on the Red Planet on Feb. 18, 2021. More information can be found on the mission’s website.

Mars 2020 Rover Lift Activities Performed at Kennedy Space Center

Mars 2020 rover aeroshell lift activities
Lift activities for the Mars 2020 rover aeroshell are conducted inside Kennedy Space Center’s Payload Hazardous Servicing Facility on Jan. 14, 2020. Photo credit: NASA/Kim Shiflett

Lift activities for the Mars 2020 rover aeroshell were conducted inside Kennedy Space Center’s Payload Hazardous Servicing Facility. The activities included installing the inverted lift fixture and lifting the aeroshell assembly to the spin table for mass properties measurements.

The Mars 2020 rover mission will launch aboard a United Launch Alliance Atlas V 541 rocket from Cape Canaveral Air Force Station in Florida this summer. NASA’s Launch Services Program based at Kennedy will manage the launch.

About the size of a car with dimensions similar to the Curiosity rover, the Mars 2020 rover will land on the Red Planet on Feb. 18, 2021.

Visit the mission website for more information.