Fueling Underway For Artemis I Launch

A view of the Interim Cryogenic Propulsion System in the Multi-Payload Processing Facility at NASA's Kennedy Space Center in Florida.
A view of the Interim Cryogenic Propulsion System inside the Multi-Payload Processing Facility at NASA’s Kennedy Space Center in Florida on Feb. 18, 2021. Photo credit: NASA/Glenn Benson

Teams with NASA’s Kennedy Space Center Exploration Ground Systems and primary contractor, Jacobs, are fueling the Orion service module ahead of the Artemis I mission. The spacecraft currently resides in Kennedy’s Multi-Payload Processing Facility alongside the Interim Cryogenic Propulsion System (ICPS), the rocket’s upper stage that will send Orion to the Moon. After servicing, these elements will be integrated with the flight components of the Space Launch System, which are being assembled in the Vehicle Assembly Building.

Technicians began loading Orion’s service module with oxidizer, which will power the Orbital Maneuvering System main engine and auxiliary thrusters on the European-built service module ahead of propellant loading. These auxiliary thrusters stabilize and control the rotation of the spacecraft after it separates from the ICPS. Once the service module is loaded, teams will fuel the crew module to support thermal control of the internal avionics and the reaction control system. These 12 thrusters steady the crew module and control its rotation after separation from the service module.

Once Orion servicing is complete, teams will fill the ICPS. This liquid oxygen/liquid hydrogen-based system will push the spacecraft beyond the Moon for the test flight under the agency’s Artemis program. In several weeks, when fueling is complete, Orion will move to the center’s Launch Abort System Facility to integrate its launch abort system, and the ICPS will move to the Vehicle Assembly Building to be stacked atop the mobile launcher.

NASA “Meatball” Insignia and ESA Logo Added to Artemis I Fairings

The NASA and ESA logos are visible on the Orion spacecraft adapter jettison fairing in the MPPF at Kennedy Space Center.
Artemis I extends NASA and ESA’s (European Space Agency) strong international partnership beyond low-Earth orbit to lunar exploration with Orion on Artemis missions, as the ESA logo joins the historic NASA “meatball” insignia on the Artemis I spacecraft adapter jettison fairing panels that protect the service module during launch. Photo credit: NASA/Glenn Benson

NASA’s Artemis I Orion spacecraft is being outfitted with additional artwork as technicians began installing the logo for ESA (European Space Agency). ESA provided the European-built service module, which provides power and propulsion for the Orion spacecraft, and will also provide water and air for astronauts on future missions.

The NASA and ESA logos are in view on Orion's spacecraft adapter jettison fairing inside the MPPF at Kennedy Space Center.
The ESA (European Space Agency) logo joins the historic NASA “meatball” insignia on the Artemis I spacecraft adapter jettison fairing panels that protect the service module during launch. Orion is currently stationed at NASA’s Kennedy Space Center in the Multi-Payload Processing Facility. Photo credit: NASA/Glenn Benson

Artemis I extends NASA and ESA’s strong international partnership beyond low-Earth orbit to lunar exploration with Orion on Artemis missions. The ESA logo joins the historic NASA “meatball” insignia on the Artemis I spacecraft adapter jettison fairing panels that protect the service module during launch.

Orion is currently stationed at NASA’s Kennedy Space Center in the Multi-Payload Processing Facility, where it will undergo fueling and servicing by NASA’s Exploration Ground Systems and Jacobs Technology teams in preparation for the upcoming flight test with the Space Launch System rocket under the agency’s Artemis program.

Artemis I Orion Moves For Fueling, Next Step in Launch Preparations

Orion is buttoned up and ready to march towards the Multi-Payload Processing Facility to begin ground processing by the Exploration Ground Systems and Jacobs teams ahead of the Artemis I launch. Shielded by a protective covering for transport, the spacecraft is depart its home at the Neil Armstrong Operations and Checkout Building at NASA's Kennedy Space Center in Florida on Jan. 16, 2021.
Orion is buttoned up and ready to march towards the Multi-Payload Processing Facility to begin ground processing by the Exploration Ground Systems and Jacobs teams ahead of the Artemis I launch. Shielded by a protective covering for transport, the spacecraft departs its home at the Neil Armstrong Operations and Checkout Building at NASA’s Kennedy Space Center in Florida on Jan. 16, 2021. Photo credit: NASA/Kim Shiflett

NASA marked another milestone on the path toward the launch of Artemis I on Saturday, as engineers moved the Orion spacecraft out of the Neil Armstrong Operations & Checkout Building on its way to the Multi-Payload Processing Facility (MPPF) at the agency’s Kennedy Space Center in Florida, where the spacecraft will be fueled for its mission around the Moon.

The milestone marked completion of years of assembly and testing operations for the spacecraft and formal transfer of the spacecraft from the Orion Program and its prime contractor Lockheed Martin to NASA’s Exploration Ground Systems (EGS) team responsible for processing the vehicle, integrating it with the Space Launch System rocket, and launching them on their inaugural mission together.

The spacecraft was moved out of the O&C aboard a transport pallet and air bearing system which sits on top of a transporter. In the MPPF, it will be moved into a service stand that provides 360-degree access, allowing engineers and technicians from EGS, its lead contractor Jacobs Technology, and other support organizations to fuel and service the spacecraft. Crane operators will remove the transportation cover and use fuel lines and several fluid ground support equipment panels to load the various gases and fluids into the crew and service modules.

After Orion is fueled and engineers perform final checks in the MPPF, they will move the spacecraft to the Launch Abort System Facility, where EGS will install the Launch Abort System tower and the ogive panels that protect the crew module and LAS and provide its aerodynamic shape.

Orion is a critical component for NASA’s deep space exploration plans. During Artemis I, the spacecraft will launch on the most powerful rocket in the world and fly farther than any spacecraft built for humans has ever flown – 280,000 miles from Earth, thousands of miles beyond the Moon over the course of about a three-week mission.