ISS Daily Summary Report – 04/23/14

Extravehicular Activity (EVA) #26: Today, Mastracchio (EV1) and Swanson (EV2) successfully performed an EVA to remove and replace External (EXT)-2 Multiplexer/Demultiplexer (MDM). Once the MDM was installed, ground teams powered on the new MDM, loaded software, and configured it as a viable backup. The MDM had previously failed on April 11,2014. The EV crew also performed a get ahead task to remove SPDA door lanyards and Push In Pull (PIP) pins from both doors then characterized the type of force (impulse vs. steady) required to open and close the doors. The characterization will help with possible Special Purpose Dexterous Manipulator (SPDM) operations in the future. Today’s EVA commenced with hatch opening at 8:56am CDT and ended with a Phase Elapsed Time (PET) of 1 hour 36 minutes.

53 Progress (53P) Undocking: Progress 53P vehicle undocked from the Russian Segment Service Module at 3:58am CDT.  The Progress will remain in orbit then perform a test to re-rendezvous and dock with ISS later this week on April 25th.  The test will demonstrate its ability to automatically complete a full rendezvous and docking with the Kurs-NA System. 53P is the second Progress to test the Kurs-NA system, an improvement to Kurs-A, which will be part of the upgraded Progress-MS vehicles.

SpaceX-3 (SpX-3) Dragon Status: Dragon systems are healthy and operating nominally. Trunk camera checkouts were completed in preparation for Optical PAyload for Lasercomm Science (OPALS) and High Density Earth View (HDEV) extraction scheduled to occur next week.

Today’s Planned Tasks

  • SM ПСС (Caution & Warning Panel) Test [Complete]
  • Laptop RS1(2) Reboot / Onboard Computer System [Complete]
  • RSS1,2 Reboot / r/g 1009 [Complete]
  • Daily Planning Conference (S-band) [Complete]
  • EVA Comm Config [Complete]
  • Atmosphere Control and Supply (ACS) –  High Pressure Oxygen Bypass Configuration [Complete]
  • EVA CUCU Deactivation  [Complete]
  • USOS Window Shutter Close [Complete]
  • СРВ-К2М Sediment Trap Insert Inspection  [Complete]
  • Closing Shutters on windows 6,8,9,12,13,14 / r/g 5451 [Complete]
  • Fungistat Treatment of FGB structural surface problem areas / r/g 5450 [Complete]
  • USOS camera configuration [Complete]
  • EVA In-Suit Light Exercise (ISLE) Preparation [Complete]
  • EVA In-Suit Light Exercise (ISLE) Preparation [Complete]
  • Audit of space behind ISS RS panels / r/g 5443 [Complete]
  • ИП-1 Flow Sensor Position Check  r/g 5452 [Complete]
  • On MCC Go Switch ПрК-ТК PEV to CLOSED position [Complete]
  • Maintenance activation of Atmosphere Purification System Emergency Vacuum Valves  [Complete]
  • СОЖ Maintenance [Deferred]
  • OBSTANOVKA. Preparing for replacement of Telemetry Storage Unit (БХТИ) r/g 5453 [Complete]
  • Atmosphere Control and Supply (ACS) High Pressure Nominal Configuration [Complete]
  • EMU Prep for EVA [Complete]
  • IDENTIFICATION. Copy ИМУ-Ц micro-accelerometer data to laptop / r/g 5186 [Complete]
  • Prebreathe in EMU [Complete]
  • OBSTANOVKA.  r/g 5453 [Complete]
  • OBSTANOVKA. Closeout Ops / r/g 5453 [Complete]
  • Crew Lock Depress [Complete]
  • Post Depress and A/L Egress [Complete]
  • Crew Lock Egress [Complete]
  • Replacement of Urine Receptacle (МП) and Filter-Insert [Complete]
  • Fungistat Treatment of FGB structural surface problem areas / r/g 5450 [Complete]
  • EXT2-MDM – Procedure steps [Complete]
  • Kulonovskiy Kristall Experiment Run.  r/g 5454 [Complete]
  • ТКГ 427 (DC1) Transfers and IMS Ops / ТКГ 427 Cargo Transfers (РПР) + r/g 5317  [Complete]
  • Crew Lock Ingress [Complete]
  • KULONOVSKIY KRISTALL. Copy and Downlink Data via РСПИ / r/g 5454 [Complete]
  • Configuration for EMU Glove Photography [Complete]
  • KULONOVSKIY KRISTALL. Hardware Removal. Tagup with specialists / r/g 5454 [Complete]
  • Crew Lock Pre-Repress [Complete]
  • Crew Lock Repress [Complete]
  • Post-EVA Activities [Complete]
  • Audit of space behind ISS RS panels / r/g 5443 [Complete]
  • IMS Update [Complete]
  • EVA Glove Photo Downlink [Complete]
  • EVA Camera Reconfig [Complete]
  • Post-EVA Pille Dosimeter Reading / r/g 5438 [Complete]
  • Comm reconfig for nominal ops [Complete]

Task List

  • ARED Cylinder Evac
  • IFM Sabatier purge
  • WHC KTO Replace
  • WHC EDV R&R
  • Roscosmos Report
  • Uragan Photo
  • Ekon Photo
  • Airlock deconfig
  • HMS-OHA test
  • WHC UR/IF R&R
  • No skid tape audit
  • 37S US prepack
  • ARED SSCV5 pre-gather
  • Data prep return
  • CSA-CP C/O P2
  • EVA tool stow
  • KTO EDV audit
  • ST-ISS read
  • XFER Dragon Cargo Ops

Ground

  • Commanding in support of 53P Undock and EVA #26 [Complete]
  • EXT-2 MDM Activation, Software Load, and Configuration [Complete]

Three-Day Look Ahead:

  • Thursday, 04/24: Post EVA 26 cleanup, crew half day off
  • Friday, 04/25: 53P redock, MICRO-7, Sprint Ultrasound, Hybrid Training, Skin B
  • Saturday, 04/26: Crew off duty

QUICK ISS Status – Environmental Control Group:

                              Component Status
Elektron Off
Vozdukh Manual
[СКВ] 1 – SM Air Conditioner System (“SKV1”) On
[СКВ] 2 – SM Air Conditioner System (“SKV2”) Off
Carbon Dioxide Removal Assembly (CDRA) Lab Standby
Carbon Dioxide Removal Assembly (CDRA) Node 3 Operate
Major Constituent Analyzer (MCA) Lab Stop
Major Constituent Analyzer (MCA) Node 3 Operate
Oxygen Generation Assembly (OGA) Standby
Urine Processing Assembly (UPA) Standby
Trace Contaminant Control System (TCCS) Lab Off
Trace Contaminant Control System (TCCS) Node 3 Full up