ISS Daily Summary Report – 09/16/14

FLame Extinguishment Experiment (FLEX)-2 Operations:  Gerst removed the Combustion Integration Rack (CIR) alignment guides, isolating the rack and allowing ground teams to conduct another FLEX-2 test point via ground commanding. This week’s samples are 100% toluene and a bi-component fuel mixture of 50% heptane and 50% toluene. FLEX-2 uses small droplets of fuel to study the special burning characteristics of fire in space. The FLEX-2 experiment studies the rate and manner in which fuel is burned, the conditions that are necessary for soot to form, and the way in which a mixture of fuels evaporate before burning. The results from these experiments will give scientists a better understanding how fires behave in space and will provide important information that will be useful in increasing the fuel efficiency of engines using liquid fuels

Rodent Research-1 Preparation:  Wiseman configured and activated the Microgravity Science Glovebox (MSG) in preparation for the Rodents Research-1 experiment arriving on SpaceX-4.  The Rodent Research Hardware provides a platform aboard the ISS for long-duration rodent experiments in space. Such experiments will examine how microgravity affects the animals, providing information relevant to human spaceflight, discoveries in basic biology, and knowledge that will have direct impact toward human health on Earth. Rodent Research-1 is a test of the operational capabilities of the new hardware system, including the Transporter, Rodent Habitat, and Access Unit.

Pro K:   Wiseman unstowed the Pro K diet kit in preparation for use during the 4 day diet logging session.  Pro-K investigates dietary countermeasures to lessen bone loss of astronauts. Pro K proposes that a flight diet with a decreased ratio of animal protein to potassium will lead to decreased loss of bone mineral. Pro K has impacts on the definition of nutritional requirements and development of food systems for future exploration missions, and could yield a method of counteracting bone loss that would have virtually no risk of side effects.

NanoRack Cubesat Deployer (NRCSD) Operations:  Ground teams utilized the Japanese Experiment Module (JEM) Remote Manipulator System(JEMRMS) to return the Multi-Purpose Experiment Platform (MPEP) containing the Nanorack Cubesat Deployer #3 (NRCSD #3) to the JEM Airlock slide table.  The slide table was then retracted, bringing the MPEP inside the JEM Airlock. Gerst configured the JEM Airlock and monitored NRCSD’s during retrieval activity.

General Laboratory Active Cryogenic ISS Experiment Refrigerator (GLACIER):  Gerst performed desiccant pack swap on GLACIER #1 and #3 in preparation for SpaceX-4 cold stowage utilization.

IVA Clothing:  Suraev continued his IVA clothing study. Sufficient cotton clothes for a crew of six adds more than 900 pounds of freight to the ISS. Replacing crew uniforms with non-cotton apparel could reduce weight for cargo launches and trash removal, and provide crewmembers with more comfortable, longer-lasting clothes. The IVA Clothing investigation assessed these different types of clothing for long duration wear.

SpaceX-4 Dragon Prepack:  Gerst spent several hours gathering and prepacking items for return to earth on the Dragon Spacecraft.  SpaceX-4 Dragon is scheduled to launch on September 20th at 1:14 am CDT from Cape Canaveral Air Force Station Space Launch Complex 40.  Rendezvous and berth to ISS is set to occur on Monday September 22nd.

Centerline Berthing Camera System (CBCS) Installation and Checkout:  In preparation for the Dragon berthing, Wiseman installed the CBCS System onto the Node 2 Nadir Hatch. Following the installation Wiseman worked with ground teams in order to successfully checkout the system.  The checkout involved routing the video from the camera to the Cupola Robotics Work Station (RWS) monitors and the ground.  Video from the CBCS is used to aid the crew during Visiting Vehicle mating operations.

US Extravehicular Activity (EVA) Tether Inspection:  Wiseman inspected all Retractable Equipment Tethers (RET) and Cam Buckles on required tools for US EVA 27 and 28.  All observations were photo documented and downlinked to the ground for analysis. The pair of US EVAs are scheduled to occur on October 7th and 15th.

Urine Processing Assembly (UPA) Loss of Communication:  Today, during a process cycle, the UPA experienced a loss of communication with the Hub Control Zone (HCZ) multiplexer/demultiplexer (MDM) and subsequently shutdown. Flight Controllers successfully restarted UPA and commanded it to standby mode.  The Crew was given permission to use UPA as necessary overnight. The loss off communication signature has been seen in the past. Ground teams are monitoring the system and expecting to initiate a process cycle overnight.

Today’s Planned Activities

All activities were completed unless otherwise noted below.

  • Urine PH Test –  Subject
  • SM ПСС (Caution & Warning Panel) Test
  • JEM Airlock Pressurization prior to Leak Check
  • JEM Airlock – Leak check
  • JEM – Securing Hatch Window Cover Assembly
  • ISS Crew Medical Officer (CMO) Computer Based Training (CBT)
  • OTKLIK. Hardware Check / r/g 6649
  • SM Ventilation System Preventive Maintenance. Group В2
  • CIR – Hardware Setup
  • JEM Airlock Depressurization
  • Equipment pre-pack for return on Dragon
  • BCAT – Transfer of images from the camera
  • MSG – Visual inspection and activation
  • Hardware Setup for Rodent Research Operations
  • JEM Airlock – Leak Check
  • Screw Clamp Tightening on MRM1 side
  • JEM – Airlock Vent Confirmation
  • MSG – Hardware Powerdown
  • JEM Airlock Slide Table extension to JEF side, Part 2
  • WRS – Recycle Tank Fill from EDV
  • Crew prepares a diet log and then logs food and beverages consumed while on controlled diet
  • Centerline Berthing Camera System (CBCS) Installation and Checkout
  • Cleaning vent screens on FGB interior panels
  • US EVA Tool Preparation
  • Preparing for БИТС2-12 ЛКА1А Replacement (search for ЛКА1А, r/g review) r/g 6648
  • JEMRMS – Closing SAM Capture Mechanism to Softdock position
  • Equipment pre-pack for return on Dragon
  • JEM Airlock Retraction from JEF side and Outer Hatch Closure. Part 2
  • JEM – JEM Airlock Retraction and Outer Hatch Closure (Part 1)
  • IVA – Exercise Clothes Survey / USOS procedures
  • JEM Airlock Slide Table Retraction Viewing Support
  • IFM-OGS – ACTEX Cartridge Remove and Replace
  • JEM – JEM Airlock Retraction and Outer Hatch Closure (Part 1)
  • JEMRMS RLT Laptop Deactivation
  • GLACIER1 – Desiccant Replacement
  • GLACIER3 – Desiccant Replacement
  • IVA – Everyday Clothes Survey / USOS procedures
  • Dried Clothes Stowage / USOS procedures

Completed Task List Items

  • CTB 1226 unpack  [In Work]
  • ISS Guided Tour [In Work]
  • EVA Tool Gather  [Complete]
  • Nanoracks Plate Reader troubleshooting Pt 2 [Complete]  (Part 1 was completed last Friday)
  • Nanoracks Plate Reader troubleshooting Pt 3 [Complete]

Ground

  • Ground Controlled JEMRMS Ops for MPEP installation to JEM Airlock
  • CBCS Checkout

Three-Day Look Ahead:

  • Wednesday, 09/17: Ocular Health tonometry and Blood pressure; JEMAL ingress & secure NRCSD; CGBA6 & CGBA4 unit activate, Dragon Offset Grapple #1
  • Thursday, 09/18: OH Fundoscope, MDCA Hardware Replacement
  • Friday, 09/19: OH Ultrasound & Cardio Ops; Dragon OBT, EVA Airlock Unstow

QUICK ISS Status – Environmental Control Group:

                              Component

Status

Elektron

On

Vozdukh

Off

[СКВ] 1 – SM Air Conditioner System (“SKV1”)

On

[СКВ] 2 – SM Air Conditioner System (“SKV2”)

Off

Carbon Dioxide Removal Assembly (CDRA) Lab

Standby

Carbon Dioxide Removal Assembly (CDRA) Node 3

Operate

Major Constituent Analyzer (MCA) Lab

Stop

Major Constituent Analyzer (MCA) Node 3

Operate

Oxygen Generation Assembly (OGA)

Standby

Urine Processing Assembly (UPA)

Standby

Trace Contaminant Control System (TCCS) Lab

Off

Trace Contaminant Control System (TCCS) Node 3

Full up