40 Soyuz (40S) Undock and Landing: 40S undocked at 5:45pm CDT today bringing Wilmore, Serova and Samokutyaev back to Earth. Landing occurred at 9:07pm in Kazakhstan. The ISS will be in 3-crew operations until 42S docking on May 28.

Biolab Troubleshooting (TripleLux-B):  Cristoforetti performed troubleshooting to recover smoke detection in the Biolab facility.  She removed & replaced (R&R) two Exchangeable Standard Electrical Module (ESEM) boards in the Biolab to verify there is no damage to board connectors and Biolab interface after removal and prior to installation. Photos were downlinked for evaluation by ground teams and it was determined that the problem is the smoke detector. An R&R is scheduled for next Monday.

Treadmill 2 (T2) Six-Month Inspection: Virts performed this regularly scheduled maintenance today. He cleaned closeout panels, inspected threadbelt slats, screws and snubber cup liner and vacuumed the rack space and filter screen. 

Node 2 Port IDA Control Panel Installation: Cristoforetti installed the International Docking Adapter (IDA) Control Panel, IDA Control Panel bracket, and cover on the NOD2P0-11 closeout panel.  The Port IDA Control Panel will control IDA1 which will be installed at N2 Forward during SpX-7. 

Today’s Planned Activities
All activities were completed unless otherwise noted.

  • HRF – Sample Collection and Prep for Stowage
  • Start BSA Battery Charge
  • ТК 714 Stowage Ops for Return.
  • CASKAD. Manual Mixing in Bioreactor
  • HRF – Blood collection assistance
  • Verification of ИП-1 Flow Sensor Position
  • HRF Blood Draw
  • CASKAD. Deactivation of TBU No.02
  • HRF – Blood collection assistance
  • T2 – 6-month inspection
  • CASKAD. Transfer of Bioreactor and Insertion into Anabioz Thermostat.
  • TPLXB. Hardware Retrieval
  • TPLXB. Preparation for EC Assembly
  • REGENERATSIYA-1. 
  • BIOPLENKA (BIOFILM). Transfer to Soyuz 714
  • CASKAD. Transfer of Anabioz hardware for return to the ground.
  • TPLXB. Retrieval of Culture Tube from GLACIER and Transfer to Glovebox
  • SALMARK – Survey Completion
  • Т2 – Unmanned Activation and Checkout (ACO)
  • Health Maintenance System (HMS) – Medical kits prepack for disposal or return
  • Photography of [СА] and cargo kits for return before ТК 714 undocking from ISS
  • ТК 714 Transfers Status Report
  • TPLXB. Transfer of Triplelux EC from incubator to TCU 2
  • WRS – Recycle Tank Fill from EDV
  • Photography of the external surface of Soyuz 714 [СА] БО hatch cover
  • Closing USOS Window Shutters
  • ISS HAM – Radio Deactivation
  • Downlink photo of external surface of Soyuz 714 [СА]-БО after completion of return cargo stowage
  • AIRMON – Hardware Reconfiguration
  • HRF Closeout Ops
  • ТПК 714 [СА] cooldown ops prior to descent
  • HRF Closeout Ops
  • Soyuz 714 Activation, Comm Check from Soyuz 714
  • Take to ТК:  r/g 8182, 8220 + r/g 8227
  • Comm config for ТК 714 Undocking and Descent
  • Setup and Activation of КСПЭ Equipment for Hatch Closure TV coverage from MRM2
  • ТК-MRM2 Hatch Closure. Hatch Closure TV Coverage
  • ТК 714- MRM2 hatch leak check
  • Biolab – board exchange [Aborted]
  • MPEG TV Downlink “Hatch Closure from MRM2”
  • SALMARK – Survey Completion
  • Node 2 – Port International Docking Adapter (IDA) – Installation of Control Panel (ICP)
  • КСПЭ hardware Deactivation and Closing Applications on ЦП SSC
  • WRS – Recycle Tank Fill from EDV [Aborted]
  • Closing window shutters 6,8,9,12,13,14
  • TEPC Transfer
  • ТК 714 Ops; Undocking and Descent Ops
  • AIRMON – Hardware Reconfiguration
  • Filling (separation) of EDV from ТКГ 424  Rodnik БВ2 tank for Rodnik system or EDV-SV
  • Switching MRM2-СУ PEV to CLOSED position
  • ISTOCHNIK-M. Activation of ТК 714 TLM Recording.
  • ТПК 714 Comm reconfig for nominal ops after landing

Completed Task List Items

  • None

Ground Activities
All activities were completed unless otherwise noted.

  • Soyuz undock commands

Three-Day Look Ahead:

  • Thursday, 03/12: Crew sleep day
  • Friday, 03/13: JEM A/L leak check, MELFI3 cold box inspect
  • Saturday, 03/14: Crew off duty

QUICK ISS Status – Environmental Control Group:

                              Component

Status

Elektron

On

Vozdukh

Manual

[СКВ] 1 – SM Air Conditioner System (“SKV1”)

Off

[СКВ] 2 – SM Air Conditioner System (“SKV2”)

Off

Carbon Dioxide Removal Assembly (CDRA) Lab

Standby

Carbon Dioxide Removal Assembly (CDRA) Node 3

Operate

Major Constituent Analyzer (MCA) Lab

Idle

Major Constituent Analyzer (MCA) Node 3

Operate

Oxygen Generation Assembly (OGA)

Process

Urine Processing Assembly (UPA)

Standby

Trace Contaminant Control System (TCCS) Lab

Off

Trace Contaminant Control System (TCCS) Node 3

Full up