ISS Daily Summary Report – 03/24/15

Node 3 (N3) Carbon Dioxide Removal Assembly (CDRA) Valve Remove & Replace (R&R): Virts R&Rd the N3 CDRA Air Selector Valve (ASV) 106. The R&R was scheduled due to telemetry indication that showed this valve was taking longer than normal to reach its commanded position, which is consistent with a valve operating under high torque conditions.  Following the valve replacement, the ground team attempted to restart the N3 CDRA.  During restart the CDRA bed 1 failed the leak check, ground flight controllers are currently troubleshooting.  The ppCO2 levels remain low and preliminary assessment is that CDRA is not required until after the arrival of 42S crew on Friday.    

Ocular Health (OH): With Cristoforetti assisting as the CMO, Virts collected retinal images using the fundoscope as part of the Flight Day (FD) 120 OH session. The OH protocol calls for a systematic gathering of physiological data to characterize the risk of microgravity-induced visual impairment/intracranial pressure in ISS crewmembers. Researchers believe that the measurement of visual, vascular and central nervous system changes over the course of this experiment and during the subsequent post-flight recovery will assist in the development of countermeasures, clinical monitoring strategies, and clinical practice guidelines. 

Gene, Immune and Cellular Responses to Single and Combined Space Flight Conditions-B (TripleLux-B): Cristoforetti completed the first TripleLux-B runs (0-gravity) and initiated the second run.  The next Experiment Container (EC) Handling Mechanism (HM) was placed in the BioLab (BLB) glovebox for thawing prior to initiation of the run. TripleLux compares the mechanisms of vertebrate and invertebrate cells at a cellular level which causes impairment of immune functions in microgravity through induction of gene activation, phagocytosis (ingestion of foreign material), and DNA repair in vertebrate and invertebrate immune cells. TripleLux-B examines the immune function of the blue mussel (Mytilus edulis), hemocytes (cellular component of invertebrate blood), compared to rodent macrophages (white blood cells responsible for eating foreign material) to function in microgravity.

Radiation Dosimetry Inside ISS-Neutrons 2 (RADI-N2): Shkaplerov handed over eight bubble detectors to Cristoforetti deployment around the ISS for the Radi-N2 experiment. This investigation is to better characterize the ISS neutron environment and define the risk posed to the crewmembers’ health and provide the data necessary to develop advanced protective measures for future space flight.  For each session 8 detectors are initialized and deployed in predetermined locations for measurements: a set of 6 spectrometric detectors and two control ones are placed on a wall of an ISS Segment. After 7 days the detectors are collected and read using the BUBBLE reader. 

On Board Training (OBT) Dragon Robotics Onboard Trainer (ROBoT): Following yesterday’s procedures review and conference with ground teams, Virts and Cristoforetti performed one of three planned runs of Session 1 of the SpX-6 ROBoT training. The crew could not complete the other two planned runs due to issues with the ROBoT software. Ground teams are working troubleshooting steps to recover. Additional ROBoT sessions are  scheduled prior to SpX-6 arrival. This training allows the crew to practice free drift timing, malfunction response, and nominal rate approaches. 

Today’s Planned Activities
All activities were completed unless otherwise noted.

  • COSMOCARD. Data downlink from the previous session
  • TPLXB – Set up hardware for the experiment:
  • TPLXB – Preparation of Glovebox for the Experiment
  • TPLXB – GLACIER Retrieval
  • OBSTANOVKA. Connecting УКР-50 with cable-inserts to БКС.
  • TPLXB – Insertion of EC HM into Glovebox
  • OBSTANOVKA
  • WRS Water Sample Analysis
  • Carbon Dioxide Removal Assembly (CDRA) Valve R&R
  • Search for ПТАБ-1М Device (А301)
  • MATRYOSHKA-R. Gathering and Initialization of Bubble-Dosimeter Detectors.
  • TPLXB – Recording data after the 1st session
  • MATRYOSHKA-R. Handover of BUBBLE-dosimeters to USOS
  • RADIN – Radiation Dosimetry Inside ISS-Neutrons Hardware Handover from the Russian Crew
  • MATRYOSHKA-R. BUBBLE-dosimeter initialization and deployment for exposure
  • RADIN – Dosimeter Deployment
  • PAO Event
  • NANO – Removal of modules 16, 18, 20, 21 and 22
  • Dragon Rendezvous and Berthing Procedures Review
  • СОЖ Maintenance
  • OBT Robotics Onboard Trainer (ROBoT) Debrief 
  • TOCA Data Recording
  • TPLXB – Transfer of EC HM Interface from Glovebox to TCU 2
  • Fundoscope – Ocular Health (OH) Equipment Setup
  • TPLXB – Closeout Ops
  • Eye Prep for Fundoscopic Exam
  • WRS – Recycle Tank Fill
  • VHF2D-VHF1 Relay Test via SM
  • IMS Delta File Prep
  • Fundoscope – Eye Exam (Stowage)
  • EMU SOP Check-Out Fixture SCOF Positive Pressure Relief Valve cycling

Completed Task List Items

  • SpX-6 stowage prep

Ground Activities
All activities were completed unless otherwise noted.

  • ROBoT ops for Dragon OBT
  • Ocular Health ops
  • ACE ops

Three-Day Look Ahead:

  • Wednesday, 03/25: Ocular Health, TripleLux, CubeSat deployer/MPEP/SAM remove, JEM A/L slide table retraction
  • Thursday, 03/26: JEM A/L slide table extension, RRM hardware install
  • Friday, 03/27: 42S launch/dock, Aniso Tubule sample prep/insertion, Dragon pre-pack

QUICK ISS Status – Environmental Control Group:

                              Component

Status

Elektron

Off

Vozdukh

Manual

[СКВ] 1 – SM Air Conditioner System (“SKV1”)

On

[СКВ] 2 – SM Air Conditioner System (“SKV2”)

Off

Carbon Dioxide Removal Assembly (CDRA) Lab

Standby

Carbon Dioxide Removal Assembly (CDRA) Node 3

Standby

Major Constituent Analyzer (MCA) Lab

Idle

Major Constituent Analyzer (MCA) Node 3

Shutdown

Oxygen Generation Assembly (OGA)

Process

Urine Processing Assembly (UPA)

Process

Trace Contaminant Control System (TCCS) Lab

Warmup

Trace Contaminant Control System (TCCS) Node 3

Off