ISS Reboost: A planned reboost is scheduled at 9:54 pm CDT tonight using 58P thrusters. Delta V will be 1.22 m/s and burn duration is estimated to be 10 minutes and 57 seconds. The reboost will set up phasing for 43S docking and dynamic operations for future visiting vehicles.
NanoRack Cubesat Deployer (NRCSD) Operations: Kelly reviewed the procedures and overview and began preparations for a series of deployments of CubeSats from a NRCSD via the Japanese Experiment Module (JEM) Remote Manipulator System (JEMRMS) beginning next Monday. He then opened the JEM Airlock (AL) inner hatch, extended the slide table into the module, and installed the Cubesat Quad Deployers onto the Multi-Purpose Experiment Platform (MPEP), which is mounted on the slide table. Preparations are scheduled to be completed tomorrow.
Habitability Video Walk-through Session Postponed: This activity was postponed to allow additional time for NRCSD preparations.
On-Board Training (OBT) ISS Emergency Response: This training session was performed by both the ground and crew to practice ISS Emergency response based on information provided by a simulator. During the exercise the crew practiced required actions during a depress event, ammonia event and US and Russian segment fire events. Following the training the crew and ground teams had a conference to discuss questions and comments.
Today’s Planned Activities
All activities were completed unless otherwise noted.
- CASCAD. Manual Mixing in Bioreactor
- Crew Prep for PAO
- CUBESAT – Procedure Review
- PAO hardware setup
- TV Conference with the Participants of Science School “Space Exploration: Theory and Practice”
- JEM Airlock Slide Table (ST) Extension to JPM Side
- Checkout of Vozdukh Atmosphere Purification System [СОА] assemblies.
- Progress 428 (DC1) Transfers and IMS Ops
- Re-mating Vozdukh [СОА] TLM-connectors
- Checkout of Vozdukh Atmosphere Purification System [СОА] assemblies.
- IMS Delta File Prep
- JEM – Slide Table Retraction [Deferred]
- JEMAL – Depressurization [Deferred]
- ТК 716 Kazbek Fit Check
- Filling EDVs
- EXPOSE-R. Copy and Downlink Data
- PAO Hardware Setup
- Crew Prep for PAO
- PAO Event
- TV Greetings for Norilsk Nickel 80-anniversary
- Verification of Airlock Depressurization Completion in JEM
- ALGOMETRIA. Experiment Ops
- СОЖ Maintenance
- Rodent Research – Cold Block Retrieval
- IMS and Stowage Conference
- Verification of JEM Airlock Venting Completion [Deferred]
- Training for Emergency Response On-board ISS
- Comm reconfig for Nominal Ops after OBT Drill
- HABIT – Video Recording [Deferred]
- On-board Training (OBT) ISS Emergency Drill Conference
- CASCAD. Starting Anabioz Battery No. 1 Charge
- SM Rodnik БВ2 Water Tank Bladder Compression -Closeout ops
- Closure of outer covers on SM windows 6, 8, 9, 12, 13 and 14 for ISS Reboost
- CASCAD. Manual Mixing in Bioreactor
- Health Maintenance System (HMS) – Food Frequency Questionnaire
- Crew conference with Astronaut Office
- Flight Director / ISS Crew Tagup
- [АСН-М] Navigational Receiving Module (НПМ) Setup Configuration
- Closing USOS Window Shutters
Completed Task List Items
- None
Ground Activities
All activities were completed unless otherwise noted.
- JEMAL depress [Deferred]
- OASIS video
- Emergency OBT ops
- Lab CDRA Activation
- Lab TCCS Activation
- N3 TCCS Deactivation
- N3 CDRA Deactivation [Planned]
Three-Day Look Ahead:
- Friday, 07/10: NRCSD Prep, N3 CDRA leak check
- Saturday 07/11: Crew off duty, housekeeping
- Sunday, 07/12: Crew off duty
QUICK ISS Status – Environmental Control Group:
Component |
Status |
Elektron |
On |
Vozdukh |
Manual |
[СКВ] 1 – SM Air Conditioner System (“SKV1”) |
On |
[СКВ] 2 – SM Air Conditioner System (“SKV2”) |
Off |
Carbon Dioxide Removal Assembly (CDRA) Lab |
Operate |
Carbon Dioxide Removal Assembly (CDRA) Node 3 |
Operate |
Major Constituent Analyzer (MCA) Lab |
Shutdown |
Major Constituent Analyzer (MCA) Node 3 |
Operate |
Oxygen Generation Assembly (OGA) |
Standby |
Urine Processing Assembly (UPA) |
Standby |
Trace Contaminant Control System (TCCS) Lab |
Warmup |
Trace Contaminant Control System (TCCS) Node 3 |
Off |