Human Research Facility (HRF)-2 Resupply: Kopra restocked the HRF supply kits in the HRF2 rack in the Columbus module and removed expired limited life items. He then took photographs of the kits for downlink.
Fine Motor Skills: Newly arrived ISS crewmembers Kopra and Peake each completed a session of the Fine Motor Skills experiment today. During the experiment they performed a series of interactive tasks on a touchscreen tablet. This investigation is the first fine motor skills study to measure long-term microgravity exposure, different phases of microgravity adaptation, and sensorimotor recovery after returning to Earth gravity.
Space Headaches: Peake completed another Daily Space Headaches questionnaires as part of his week-long series. The daily questionnaires are only scheduled immediately after arrival of a new crewmember to the ISS. Weekly questionnaires will be completed in subsequent weeks. Headaches can be a common complaint during spaceflight. The Space Headaches experiment will provide information that may help in the development of methods to alleviate associated symptoms and improvement in the well-being and performance of crew members in space.
NanoRacks Module Installations: Installation of the NanoRacks modules that arrived on the Orbital ATK-4 in a NanoRacks Platform-2 locker in the JEM Pressurized Module (JPM) has been postponed due to issues experienced overnight with responses received from ground commands sent to the hardware.
Emergency Roles and Responsibilities Review: With the arrival of the 45S crew, all 6 crew members discussed priorities in the event of an emergency response and how to achieve safety of the crew as well as safe configuration of the ISS. Topics covered included crew actions during emergency retreat in the Soyuz, ISS Commander responsibilities, and communication and coordination among crew members and with ground teams.
Cygnus Cargo Operations: Today, Kopra unpacked cargo that arrived on the Cygnus vehicle. Additional cargo operations with all three USOS crewmembers are scheduled for tomorrow.
Today’s Planned Activities
All activities were completed unless otherwise noted.
- ОСТ – Hardware setup
- WRS – recycling system tank fill
- FINEMOTR- experiment test
- On MCC Go Progress 428 (DC1) СрПК Section 2 fill with N2
- ISS crew adaptation
- ОСТ – eye scan
- IDENTIFIKATSYA. ИМУ-Ц linear acceleration meter measurements data copy to laptop
- BIOSIGNAL. CRYOGEM-03 thermostat activation to +29 deg С
- ОСТ – hardware stow
- Elektron БЖ liquid tank repress
- Crew adaptation and familiarization
- Exercise Hardware familiarization
- EVA – toothbrush state photography and stowage
- ER6-DVD- SW install
- Review of crew roles and responsibilities in contingencies
- СОЖ Maintenance
- CMS – Т2 – Glenn harness configuration
- ОВТ – CMO – onboard computer training
- WRS – recycling system tank fill
- NANO – modules install [Aborted]
- WRS – water samples analysis
- Crew prep for PAO
- REGENERATSYA-1. Hardware relocation and placement
- HRF2- hardware setup for experiment
- REGENERATSYA -1. Photography at hardware location
- ОВТ – CMO – onboard computer training
- BIOSIGNAL. Hardware transfer from Soyuz
- POIC – camcorder setup and video shooting
- BIOSIGNAL. Photography
- BIOSIGNAL. Hardware placement in CRYOGEM -03 at +29 deg. C.
- CSA-CP check out
- Video hardware stow post ARED Exercise video
- On MCC Go Local temperature commutator (ТА251М1Б) #1417726325 and ROM #1417726934 (СМ1РО_3_314_1, bag 353-8 (00037141R) install in Soyuz 719 orbital module
- ER6- SW install
- Fundoscope examination prep (eye drops for pupil dilation)
- HMS – food questionnaire entry
- Crew adaptation and familiarization
- Hardware setup for Fundoscope examination
- Crew adaptation and familiarization
- Fundoscope – eye test
- Hardware stow post Fundoscope examination
- SHD- questionnaire entry
- ER6- experiment close-out ops
- TOCA – data recording
- POIC – video recording d/l
- Soyuz 719 transfers with IMS update
- ECON-M. Observation and Photography
- Preparation of Reports for Roscosmos Web Site and Social Media
- Installation of inserts to ease opening of SM interior panel latches (Unstow Элементы конструкции (Structural Elements) kit (004890R), ФГБ1ПГО_4_427_1, СТВ No.1112 (004106J)
Completed Task List Items
- None
Ground Activities
All activities were competed unless otherwise noted.
- Nominal Commanding
Three-Day Look Ahead:
Thursday, 12/17: Cygnus Cargo Ops, ISS Crew Handover
Friday, 12/18: VEG-01, CIR Ops
Saturday, 12/19: Crew Off Duty, Weekly Cleaning
QUICK ISS Status – Environmental Control Group:
Component | Status |
Elektron | On |
Vozdukh | Manual |
[СКВ] 1 – SM Air Conditioner System (“SKV1”) | On |
[СКВ] 2 – SM Air Conditioner System (“SKV2”) | Off |
Carbon Dioxide Removal Assembly (CDRA) Lab | Standby |
Carbon Dioxide Removal Assembly (CDRA) Node 3 | Operate |
Major Constituent Analyzer (MCA) Lab | Idle |
Major Constituent Analyzer (MCA) Node 3 | Operate |
Oxygen Generation Assembly (OGA) | Process |
Urine Processing Assembly (UPA) | Norm |
Trace Contaminant Control System (TCCS) Lab | Full Up |
Trace Contaminant Control System (TCCS) Node 3 | Off |