Suggested Searches

This content has been archived.

ISS On-Orbit Status Report

Viewing Posts from January 5th 2016

View All Posts

    ISS Daily Summary Report – 1/5/16

    Kubik-6 Ebox Exchange:  Kelly unstowed the European Space Agency (ESA) Kubik-6 facility and exchanged the centrifuge and thermal eBoxes in preparation for the Kubik-6 commissioning.  He then performed an activation and checkout of the unit.  Kubik is a small controlled-temperature incubator / cooler used to study biological samples in a microgravity environment.  It is equipped …

    Read Full Post