Rodent Research 3 (RR-3) Operations: The RR-3 access units were inspected with no issues and restocked with food bars. RR-3 studies molecular and physical changes in the musculoskeletal system that happen in space. Results expand scientists’ understanding of muscle atrophy and bone loss in space, while testing an antibody that has been known to prevent muscle wasting in mice on Earth.

 

Fluid Shifts Baseline Imaging Preparation: In preparation for this week’s Fluid Shifts exercises, the crew configured hardware and the Cerebral and Cochlear Fluid Pressure (CCFP) analyzer device which will be used to conduct measurement tests. Fluids Shift is divided into three one-week segments: Dilution Measures, Baseline Imaging, and Baseline Imaging using the Russian Chibis Lower Body Negative Pressure (LBNP) device. The experiment measures how much fluid shifts from the lower body to the upper body, in or out of cells and blood vessels, and determines the impact these shifts have on fluid pressure in the head, changes in vision and eye structures.

 

Habitability Human Factors Directed Observations: The crew recorded and submitted a walk-through video documenting observations of an area or activity providing insight related to human factors and habitability. The Habitability investigation collects observations about the relationship between crew members and their environment on the International Space Station. Observations can help spacecraft designers understand how much habitable volume is required, and whether a mission’s duration impacts how much space crew members need.

 

Wet Lab Ribonucleic Acid (RNA) SmartCycler Session: The crew completed the third of four Wet Lab RNA SmartCycler sessions by processing a quality control sample to verify that the SmartCycler operates as expected in microgravity. The Wet Lab RNA SmartCycler is a research platform for conducting real-time quantitative gene expression analysis aboard the ISS. The system enables spaceflight genomic studies involving a wide variety of biospecimen types in the unique microgravity environment of space.

 

Common Communications for Visiting Vehicles (C2V2) Radio Frequency (RF) Checkout: The C2V2 Comm Units are two fully redundant radios (C2V2 A and C2V2 B) that are planned for use with future visiting vehicles. The units were installed on March 11 in MSS-2 rack in the LAB. Initial activation was performed on April 1. The following tests have been completed.

  • Monday: A Radio Frequency (RF) pass lasting approximately 8 minutes was completed successfully with appropriate “fill frames” transmitted to the ground. This test provided confirmation that the C2V2 A’s forward and aft antennas are functioning as planned.
  • Tuesday: Two tests were performed. In the first test, C2V2-A successfully sent a command and GPS Auxiliary Data (GAD) to Electronic System Test Laboratory (ESTL) on the forward link. In the second test, C2V2-A successfully sent GAD, Broadcast Auxiliary Data (BAD) and Audio to ESTL on the forward link and successful performed a comm check on S/G 4 between CAPCOM and ESTL.

Checkout tests are planned daily until May 6.

 

Recycle Fill Tank Assembly (RFTA): On Sunday the RFTA stopped short of empty when draining to a Russian [EDV]. The ball bearing level indication stopped short of full by ½” to ¾”.  The crew proceeded with troubleshooting and completed the RFTA drain to a Temporary Urine and Brine Storage System (TUBSS).  The likely cause was the EDV initially used had some residue brine that caused the RFTA to not drain completely. Ground teams will continue to track the performance of the tanks.

 

Mobile Servicing System (MSS) Operations/HTV-6 Get-ahead Tasks: Yesterday, Special Purpose Dexterous Manipulator (SPDM) operations began fully retracting the secondary bolts (H1), breaking torque on the primary bolts (H2), and re-torquing the primary bolts to a lower setting on the S4 batteries. Ground teams operations were successful for 6 bolts, unsuccessful for 2 bolts, and have 4 bolts that remain to be attempted. Later today, re-attempts on bolts 3A2-1 H1, 3A2-2 H1 and initial attempts on the 4 remaining H2 bolts will resume. Order of operation and status is as follows:

  • 3A Battery 3A2-1, Bolt H1 – Not successful
  • 3A Battery 3A2-2, Bolt H1 – Not successful
  • 3A Battery 3A2-1, Bolt H2 – Forward work (Can’t be attempted until H1 released)
  • 3A Battery 3A2-2, Bolt H2 – Forward work (Can’t be attempted until H1 released)
  • 3A Battery 3A1-1, Bolt H1 – Successful
  • 3A Battery 3A1-2, Bolt H1 – Successful
  • 3A Battery 3A1-2, Bolt H2 – Successful
  • 3A Battery 3A1-1, Bolt H2 – Successful
  • 3A Battery 3A3-1, Bolt H1 – Successful
  • 3A Battery 3A3-2, Bolt H1 – Successful
  • 3A Battery 3A3-1, Bolt H2 – Forward work (Ran out of time on 4/25/16)
  • 3A Battery 3A3-2, Bolt H2 – Forward work (Ran out of time on 4/25/16)

 

London Marathon: On Sunday, Peake ran the 26.2-mile London Marathon on the Treadmill 2 (T2) in an estimated time of 3:35:21. He was the official starter of the race and watched BBC coverage of the event while running. He is the second astronaut to run a marathon on the ISS. In 2007, Sunita Williams ran the Boston Marathon on T2.

 

Today’s Planned Activities
All activities were completed unless otherwise noted.

  • ENERGY Diet Log of Breakfast
  • On MCC Go Micropurification Unit (БМП) Ф2 Absorption Cartridge Regeneration (Start)
  • CORRECTSIA. Logging Liquid and Food (Medicine) Intake / r/g 2047
  • Transfer from EDV to TUBSS
  • Greetings Video Recording / r/g 2075
  • EDV swap
  • WRS – Water Sample Analysis
  • Soyuz 720 Samsung Tablet Recharge – Start
  • VIZIR. Hardware Installation, Software Update and Hardware Calibration r/g 2079 + New SW version
  • SCYC. Sample retrieval from MERLIN-3 for Session 2
  • Soyuz 719 Samsung Tablet Recharge – Start
  • MDE. Sample Retrieval and Temporary Stowage
  • Tear down EDV to TUBBS transfer setup
  • SEISMOPROGNOZ. Data Transfer from МКСД HDD (Start) r/g 1595
  • КОХ1 Technical Specifications Check.  р/г 2057
  • In Flight Maintenance (IFM) Waste and Hygiene Compartment (WHC) Full Fill
  • Fluids Integrated Rack (FIR) Rack Doors Open
  • Photo TV Camera Set Up
  • LMM- Plate Change out
  • Photo/TV
  • RR- Camcorder Video Setup
  • In Flight Maintenance (IFM) Waste and Hygiene Compartment (WHC) Full Fill
  • Fluids Integrated Rack (FIR) Rack Doors Close
  • СОЖ Maintenance
  • HABIT Questionnaires
  • Fungistat Treatment of FGB Structural and Shell Elements / r/g 2046
  • RR-MELFI – equipment gather
  • LS1 and Station Support Computer (SSC) NAS Vent Cleaning
  • RR- Restock 2
  • Formaldehyde Monitoring Kit (FMK) Deployment Operations
  • Grab Sample Container (GSC) Sampling Operations
  • Soyuz 719 Samsung Tablet Recharge – End
  • Installation of Six Laser Eye Protection Disks in a Cupola Window for testing
  • PE at crew discretion
  • SEISMOPROGNOZ. Data Transfer from Control and Data Acquisition Module (МКСД) HDD (End) r/g 1595
  • CORRECTSIA. Logging Liquid and Food (Medicine) Intake / r/g 2047
  • SPHEROIDS. Temperature Check
  • Private Medical Conference (Ku+S-band)
  • Rodent Research Animal Access Unit Clean
  • Changeout of Replaceable Condensate Lines r/g 2056
  • Water Resource Management (WRM) Condensate Sampling Initiation
  • ALGOMETRIYA. Experiment Ops. / r/g 2073
  • NANO Experiment Ops
  • Soyuz 720 Samsung Tablet Recharge – End
  • PAO Setup
  • ENERGY Diet Log, Lunch
  • Rodent Research Animal Access Unit Stow
  • Life on the Station Photo/Video Ops / r/g 2000
  • Video Equipment Setup for БД-2 Exercise Shooting / r/g 2071
  • Fluid Shifts CCFP Setup
  • NanoRacks Pay Load: module 51 photography
  • DOSETRK Data Entry
  • PAO Crew Prep
  • Water Resource Management (WRM) Condensate Sampling Termination
  • PAO
  • Water Recovery Management (WRM) Water Balance: first payload water reservoir (PWR) fill
  • SCYC. Experiment Ops
  • DRAGON. Cargo Transfer Ops
  • БД-2 Exercise Video Equipment Teardown and File Downlink / r/g 2071
  • Water Recovery Management (WRM) Water Balance: second payload water reservoir (PWR) fill
  • Photo/TV Camcorder Setup Verification for ARED Exercise Recording
  • DRAGON. Cargo Transfer Ops
  • SCYC. Video Downlink
  • Fluid Shifts – Battery Installation
  • FS – DPOAE Settings Change
  • Photo/TV Camcorder Setup Verification for ARED Exercise Recording
  • TOCA – Sample Data Record
  • IMS Delta File Prep
  • VZAIMODEISTVIE-2. Experiment Ops / r/g 2074
  • SCYC. Preparation for Experiment Ops
  • Dragon – Cargo Operations Conference
  • Daily Planning Conference (S-band)
  • On MCC Go Micropurification Unit (БМП) Ф2 Absorption Cartridge Regeneration (End)
  • CORRECTSIA. Logging Liquid and Food (Medicine) Intake / r/g 2047
  • ENERGY Diet Log of Dinner

 

Completed Task List Items

  • None

 

Ground Activities

All activities were completed unless otherwise noted.

  • RR ops
  • Battery bolt ops
  • Nominal ground commanding

 

Three-Day Look Ahead:

Wednesday, 04/27: Nano Racks Module 9 ops, Fluid Shifts, Genes in Space MWA prep, Habitability

Thursday, 04/28: ENERGY, CMS3 closeout, HRF resupply

Friday, 04/29: SmartCycler, METERON, ENERGY

 

QUICK ISS Status – Environmental Control Group:

                              Component Status
Elektron On
Vozdukh Manual
[СКВ] 1 – SM Air Conditioner System (“SKV1”) Off
[СКВ] 2 – SM Air Conditioner System (“SKV2”) Off
Carbon Dioxide Removal Assembly (CDRA) Lab Standby
Carbon Dioxide Removal Assembly (CDRA) Node 3 Operate
Major Constituent Analyzer (MCA) Lab Idle
Major Constituent Analyzer (MCA) Node 3 Operate
Oxygen Generation Assembly (OGA) Process
Urine Processing Assembly (UPA) Standby
Trace Contaminant Control System (TCCS) Lab Off
Trace Contaminant Control System (TCCS) Node 3 Full Up