Airway Monitoring Ambient and Reduced Pressure Operations: The crew completed part of today’s session of the European Space Agency (ESA) Airway Monitoring experiment in the US Airlock.

  • The protocol was successfully performed at ambient pressure. The crew was scheduled to repeat the protocol at a low pressure (10.2 psi) during which oxygen concentration in the Airlock would be increased to 27.5% but the low pressure portion was not performed and will be rescheduled.
  • The second part of the experiment was to be performed at a pressure of 10.2 psi (700 mbar) with closed hatch. Both crew members would wear an Oxygen Finger Clip on the index finger prior to hatch closure for monitoring heart rate and oxygen saturation (SpO2) in the blood and the clip would not removed until the hatch was reopened.  This portion of the experiment was not completed and will be rescheduled.

Airway Monitoring is the first experiment to use the US Airlock as a hypobaric facility for performing science which allows unique opportunities for the study of gravity, ambient pressure interactions, and their effect on the Human Body. This investigation studies the occurrence and indicators of airway inflammation in crewmembers using ultra-sensitive gas analyzers to analyze exhaled air. This helps to highlight health impacts and to maintain crewmember well-being on future human spaceflight missions, especially longer-duration missions to the Moon and Mars, where crewmembers will have to be more self-sufficient in highlighting and avoiding such conditions.

Multi-Omics Operations:  The crew supported the Japan Aerospace Exploration Agency (JAXA) Multi-Omics investigation by collecting human samples and inserting them into a Box Module in the Minus Eighty-degree Freezer for ISS (MELFI). The investigation evaluates the impacts of space environment and prebiotics on astronauts’ immune function by combining the data obtained from the measurements of changes in the microbiological composition, metabolites profiles, and the immune system. 

Synchronized Position Hold, Engage, Reorient, Experimental Satellites (SPHERES) Zero Robotics: A USOS crewmember and a Russian crewmember participated in a conference with the SPHERES Principal Investigator and configured the SPHERES work area to activate and check out the hardware before completing test runs on the Synchronized Position Hold Engage and Reorient Experimental Satellites. The investigation establishes an opportunity for high school students to design research for the ISS. As part of a competition, students write algorithms for the SPHERES satellites to accomplish tasks relevant to future space missions. The algorithms are tested by the SPHERES team and the best designs are selected for the competition to operate the SPHERES satellites on board the ISS.

Fluid Shifts Hardware Transfer and Service Module Setup: To prepare for Ultrasound activities in the Service Module this week, the crew transferred and setup hardware that supports the Fluid Shifts investigation from the US Segment to the Russian Segment. The experiment measures how much fluid shifts from the lower body to the upper body, in or out of cells and blood vessels, and determines the impact these shifts have on fluid pressure in the head, changes in vision and eye structures.

Onboard Training (OBT) Emergency Event: All six crewmembers participated in this training covering required response during depress, ammonia, US fire and Russian Segment fire events. The crew practiced procedure management, equipment gather (what would be used and from where), hatch closures and communication with the ground. This is in preparation for tomorrow’s planned OBT ISS emergency simulation.

Water Processor Assembly (WPA) Microbial Check Valve (MCV) Intermittent Checking: On July 26th, the MCV in the WPA was Removed and Replaced (R&Rd). The WPA had been experiencing high pressure faults when in reprocess mode due to high delta-pressure (dP) values across the MCV. After the second processing run following the R&R, the newly installed MCV began experiencing intermittent checking. This is an issue that the previously installed MCV also encountered. Over the weekend, the Flight Control Team successfully implemented a workaround in which the 3-way valve upstream of the MCV was cycled to relieve enough pressure that the MCV was able to check. Since the new MCV was installed, the WPA has not experienced any high dP faults.

Urine Processor Assembly (UPA) Reconfiguration and Samples: In an attempt to understand the root cause of high conductivity observed in the distillate, the engineering team requested a series of return-to-ground samples be taken from the UPA during various times during two separate Recycle Tank concentration cycles. The first of the activities supporting these samples was performed this afternoon. The crew reconfigured the UPA back to the nominal configuration by tearing down the CWC-I setup that has been in place to collect Separator Plumbing Assembly (SPA) effluent, and reconnecting the SPA. Additionally, the 100 Micron Distillate Filter was R&Rd. Both the CWC-I and Distillate Filter will be returned on SpX-9 for analysis. 

Today’s Planned Activities
All activities were completed unless otherwise noted.

  • WHC Maintenance  – Full Fill
  • SPHERES. Payload OBT
  • CASKAD. Manual Mixing in Bioreactor / r/g 2888
  • AIRMON Unit Activation
  • Portable Fan Assembly (PFA) Setup
  • Pressurization of Elektron-VS Liquid Unit before Activation
  • SPHERES Crew conference with P/L Developer
  • AIRMON Set up and first measurement
  • VIZIR. Experiment set up and start using СКПИ P/L r/g 2948
  • In Flight Maintenance (IFM), Waste and Hygiene Compartment (WHC) Full Fill
  • On MCC GO Transfer of brine/urine from ЕДВ-У to Progress 433 (DC1) Rodnik H2O Tank 1 / r/g 2946
  • JEM System Laptop Terminal Reboot
  • AIRMON Calibration and Measurements
  • Environmental Control & Life Support System (ECLSS) Tank Drain
  • Rack 5 Locker Removal
  • PCML. MultiLab card installation and activation
  • Environmental Control & Life Support System (ECLSS) Recycle Tank Drain Part 2
  • WRS – Water samples analysis
  • Multi Omics. Fecal Sample Operations
  • AIRMON. DLNO Measurements
  • MO- Samples insertion into MELFI
  • MO – Hardware stowage
  • AIRMON. Preparations for and depressurization
  • Exercise Data Downlink via OCA
  • AIRMON – Crew health status monitoring
  • AIRMON Experiment Ops
  • AIRMON Measurement at Low Pressure [Not performed]
  • SPHERES Camera Setup and Video Recording
  • CONTROL. Switching Measuring Modes of Indicator-ISS P/L and Photography / r/g 2943
  • VIZIR. СКПИ Closeout Ops r/g 2948
  • Recharging Soyuz 720 IRIDIUM Phone, Setup, Start Charging
  • Recharging Soyuz 720 IRIDIUM Phone, Battery Status Check
  • Recharging Soyuz 720 IRIDIUM Phone, Terminate Charge
  • AIRMON. Pressure Measurement
  • СОЖ Maintenance
  • Preventive Maintenance of FS1 Laptop (Cleaning and rebooting)
  • SPHERES. Maintenance Run
  • BRI Monthly Maintenance
  • AIRMON Hardware Deactivation
  • Fluid Shifts – Hardware transfer to RS
  • FLUID SHIFTS. Ultrasound 2 Setup in SM
  • TOCA Data Recording
  • UPA reconfiguration and distillate filter replacement
  • NAPOR-mini RSA. Cleaning Onboard Memory Storage БЗУ-М vents / r/g 2949

 

  • UPA reconfiguration and distillate filter replacement
  • FLUID SHIFTS. Connecting Ultrasound Equipment to РБС / r/g 2944
  • Recharging Soyuz 731 IRIDIUM Phone, start charge
  • Recharging Soyuz 731 IRIDIUM Phone, Battery Status Check
  • Recharging Soyuz 731 IRIDIUM Phone, Terminate Charge, Tear down the Setup
  • SPHERES. Test Shutdown
  • EMU Space suit Li battery recharge end
  • CASKAD. Manual Mixing in Bioreactor / r/g 2888
  • ISS Emergency OBT Review
  • ISS Emergency OBT Review
  • FLUID SHIFTS. Chibis Measurements in SM Reminder 2 

Completed Task List Items

  • None 

Ground Activities
All activities were completed unless otherwise noted.

  • Airway Monitoring support
  • Nominal ground commanding.

Three-Day Look Ahead:

  • Tuesday, 08/02: Fluid Shifts, Mouse cage maintenance, Airway Monitoring Airlock stow, OBT Emergency simulation
  • Wednesday, 08/03: Fluid Shifts, Heart Cells, OBT CheCS drill, EVA Airlock restow
  • Thursday, 08/04: NREP hardware assembly/install to JEMAL, Fluid Shifts, EVA tool config

QUICK ISS Status – Environmental Control Group:

                              Component

Status

Elektron

On

Vozdukh

Manual

[СКВ] 1 – SM Air Conditioner System (“SKV1”)

Off

[СКВ] 2 – SM Air Conditioner System (“SKV2”)

On

Carbon Dioxide Removal Assembly (CDRA) Lab

Standby

Carbon Dioxide Removal Assembly (CDRA) Node 3

Operate

Major Constituent Analyzer (MCA) Lab

Idle

Major Constituent Analyzer (MCA) Node 3

Operate

Oxygen Generation Assembly (OGA)

Process

Urine Processing Assembly (UPA)

Standby

Trace Contaminant Control System (TCCS) Lab

Off

Trace Contaminant Control System (TCCS) Node 3

Full Up