Neutron Star Interior Composition ExploreR (NICER) Status: Yesterday’s planned NICER deployment was not completed due to a problem with releasing all four of the NICER launch locks. Following several attempts, the NICER team successfully released three of the four launch locks. The team continues attempts to release the fourth lock.
NanoRacks Module-52: The crew performed a status check of subexperiments inside NanoRacks Module-52. Photographs were taken of the petri dishes and video was downlinked. NanoRacks Module-52 is a collection of 6 student-led biological experiments photo-documenting the life-cycle of various molds and bacteria on petri plates in microgravity.
Cardiac Stem Cells: In support of the ongoing Cardiac Stem Cell investigation, the crew changed out media in one of the BioCell Habitats and fixated cells from the other two Habitats. They placed the fixated cells into a MELFI for return on SpX-11. Cardiac Stem Cells investigates how microgravity affects stem cells and the factors that govern their activity to clarify the role of stem cells in cardiac biology and tissue regeneration. This investigation also supports research into the possible acceleration of the aging process in microgravity.
Rodent Research-5 (RR-5) Systemic Therapy of NELL-1 for Osteoporosis: Two of the four Animal Habitats wiere restocked by the crew today. The other two were restocked yesterday. The habitats were emptied, cleaned, and new food bars were installed. The rodents were transferred back to the habitats and returned to their individual stowage locations.
Node 3 (N3) Common Cabin Air Assembly (CCAA) Water Separator: Water carryover had been previously noted in the N3 CCAA on May 3 and 4. The Low Temperature Loop (LTL) set point was raised, reducing the condensation rate in N3 and the carryover stopped. In the last few days, the N3 Water Separator Liquid Sensor Wet indication has been received multiple times, therefore, ground teams have declared the N3 CCAA Water Separator failed and are requesting to Remove & Replace the unit. Ground teams moved condensation collection to the Lab to account for the failed N3 unit. Condensation collection can remain in the Lab for approximately 28 days prior to requiring a dryout of the Lab unit.
Advanced Resistive Exercise Devise (ARED) Crank Handle Remove & Replace (R&R): The crew completed installing a new design of ARED crank handle. The new design will eliminate torqueing the crank handle center cap screw and inspecting witness marks which results in crew time savings.
Today’s Planned Activities
All activities were completed unless otherwise noted.
- ISS HAM Radio and Video Power Down
- XF305 Camcorder Setup
- JEM Camera Robot Activation
- JEM Camera Robot Photo
- SPHERES Battery Swap
- Glacier 4 Sample Remove
- FAGEN. Activation of ТБУ-В No.4 at +4 deg С
- Columbus Video Camera Assembly 1 Adjustment
- IMS Tagup
- Preparing For Upcoming MagVector Science Run
- Combustion Integrated Rack Hardware Return
- Verification of ИП-1 Flow Sensor Position
- Foam Bag Relocate
- Measuring Partial CO Pressure in RS using US portable CSA-CP device
- JEM Camera Robot Deactivation
- Crew Support LAN Client Power On
- JEM Camera Robot Target Marker Relocate
- NanoRacks Module-52 Status 1
- SPHERES Battery Swap
- Rodent Research Node 2 Camcorder Video Setup
- Rodent Research Habitat 3 & 4 Restock
- Installation of Progress 435 (DC1) docking mechanism
- Conference on specifics of Progress 436 docking
- SPHERES Battery Swap
- Cardiac Stem Cells SABL Insertion
- Cardiac Stem Cells Media Change and Fixation
- SPHERES Battery Swap
- LMM MELFI Sample Retrieve
- Cardiac Stem Cells MELFI Sample Insertion
- Fluids Integrated Rack Doors Open
- LMM Biophysics Plate Installation [Aborted]
- Fluids Integrated Rack Doors Close
- Rodent Research Habitat 2 Water Check
- Flight Director/ISS CREW CONFERENCE
- METOX Regeneration Termination
- METOX Regeneration Initiation
- SPHERES Battery Swap
Completed Task List Items
- Controller Panel Assembly Protective Cap Installation
Ground Activities
All activities were completed unless otherwise noted.
- Rodent Research Habitat restock
Three-Day Look Ahead:
- Friday, 06/16: 67P dock, JEM Small Satellite Orbital Deployer (SSOD) Install
- Saturday, 06/17: Crew off duty, housekeeping
- Sunday, 06/18: Crew off duty