ISS Daily Summary Report – 6/22/2017

Rodent Research-5 (RR-5) Systemic Therapy of NELL-1 for Osteoporosis:  The crew completed injections of the mice in the Microgravity Science Glovebox (MSG) for the RR-5 investigation. Spaceflight has significant and rapid effects on the musculoskeletal system; therefore, it is important to investigate targeted therapies that could ameliorate some of the detrimental effects of spaceflight. The NELL-1 drug being studied in the RR-5 investigation has the potential to slow or reverse bone loss during spaceflight. 

Multi Omics-Mouse:  The crew completed preparation and checkout of hardware and facilities to be used for JAXA’s Multi Omics-Mouse investigation.  Rodents for this investigation will arrive on the SpaceX-12 vehicle.  The Cell Biology Experiment Facility (CBEF) Back Up Interface was removed and the Mouse Habitat Cage Unit was installed in the CBEF Incubator Unit.  Later today the crew till take images of the Cage Unit with the Ghost camera.

Compound Specific Analyzer-Combustion Products (CSA-CP) Maintenance:  The crew completed this routine maintenance to replace the battery packs in all CSA-CPs and zero calibrate all the units. 

Today’s Planned Activities
All activities were completed unless otherwise noted.

  • SODF Replacement on iPads and Samsung Tablets
  • Preparation of Reports for Roscosmos Web Site and Social Media
  • URAGAN. Observation and Photography
  • ECON-M. Observation and Photography
  • Reminder 1 Vascular Echo Leg Cuffs Ultrasound Scan
  • Hematocrit. Hematocrit Number
  • Hematocrit Hardware Restow
  • Water Recovery and Management Condensate Pumping Init
  • Cell Biology Experiment Facility (CBEF) Back Up Interface Unit Removal
  • Compound Specific Analyzer-Combustion Products (CSA-CP) Extended Maintenance
  • R&R of Nitrogen Pressurization Control Unit (БА СПА) in the FGB
  • Mouse Habitat Unit Interface Unit Installation
  • Water Recovery and Management Condensate Pumping Term
  • Quick-disconnect screw clamps (ЗВБ) maintain
  • Total Organic Carbon Analyzer (TOCA) Calibration Check
  • AMS Hard Drive Change
  • Combustion Integrated Rack Alignment Guide Removal
  • Commercial Generic Bioprocessing Apparatus 6 Removal
  • Environmental Health System (EHS) – Rad Detector Rotate
  • NanoRacks Module-70 Removal from Glacier
  • NanoRacks Module-70 Imagery
  • Cell Biology Experiment Facility (CBEF) Mouse Habitat Cage Unit Installation
  • NanoRacks Module-70 Glacier Insert
  • TangoLab Card Cube Remove
  • Audit of Docking and Internal Transfer System (ССВП) on ISS RS
  • Microbial Tracking-2 Operations Review
  • Dose Tracker Data Entry Subject [Aborted]
  • On MCC Go ISS O2 Repress from the 2nd Section of Progress 435 (DC1) Oxygen Supply System СРПК
  • Rodent Research Node 2 Camcorder Video Setup
  • Rodent Research 5 Injection 2B
  • Rodent Research MELFI Retrieve 4
  • On MCC Go ISS O2 Repress from the 2nd Section of Progress 435 (DC1) Oxygen Supply System СРПК
  • Rodent Research MELFI Retrieve 8
  • Rodent Research MELFI Retrieve 5
  • Rodent Research 5 Injection 2A
  • Unpacking of First Priority and USOS Cargo Items from Progress 436 (SM Aft). IMS Update
  • Total Organic Carbon Analyzer (TOCA) Calibration Check Data Record
  • Total Organic Carbon Analyzer (TOCA) Waste Water Bag (WWB) Changeout
  • Regenerative Environmental Control and Life Support System (RGN) Wastewater Storage Tank Assembly (WSTA) Fill
  • Metal Oxide (METOX) Regeneration Termination
  • Long Duration Sorbent Testbed Status Check.
  • Ghost Camera Setup
  • Cell Biology Experiment Facility (CBEF) Door Open
  • Ghost Camera Real-Time Downlink Checkout
  • Cell Biology Experiment Facility (CBEF) Door Close
  • Ghost Camera Closeout
  • NEEMO/ISS Crew Conference
  • Microbial Tracking-2 Reminder for Saliva Collection

Completed Task List Items

  • Declic Data Cable Exchange

Ground Activities
All activities were completed unless otherwise noted.

  • ROSA Ops
  • Rodent Research Ops
  • Battery Capacity Test for set 3B2 

Three-Day Look Ahead:

  • Saturday, 06/24: Crew off duty, housekeeping
  • Sunday, 06/25: Crew off duty
  • Monday, 06/26: Seedling Growth ops, Surface Sampling, HRF ops

QUICK ISS Status – Environmental Control Group:

  Component

Status

Elektron

On

Vozdukh

Manual

[СКВ] 1 – SM Air Conditioner System (“SKV1”)

Off          

[СКВ] 2 – SM Air Conditioner System (“SKV2”)

On

Carbon Dioxide Removal Assembly (CDRA) Lab

Standby

Carbon Dioxide Removal Assembly (CDRA) Node 3

Operate

Major Constituent Analyzer (MCA) Lab

Idle

Major Constituent Analyzer (MCA) Node 3

Operate

Oxygen Generation Assembly (OGA)

Process

Urine Processing Assembly (UPA)

Process

Trace Contaminant Control System (TCCS) Lab

Full up

Trace Contaminant Control System (TCCS) Node 3

Off