ISS Daily Summary Report – 9/07/2017

MBSU I-Level Maintenance:  In early August, ground teams successfully transferred a degraded Main Bus Switching Unit (MBSU) from External Stowage Platform 2 (ESP2) site 4 to the JEM Airlock. Today, the crew removed the MBSU from the JEM A/L and performed Intermediate Level (I-Level) maintenance on the unit.  This MBSU is one of two failed units externally stowed on orbit that will be brought inside to undergo maintenance and repair. 

Lighting Effects: This morning a crewmember provided a sleep log entry for the Lighting Effects investigation. The light bulbs on the ISS are being replaced with a new system designed for improved crew health and wellness. Fluorescent bulbs are being replaced with solid-state light-emitting diodes (LEDs) that have adjustable intensity and color. Investigators will determine if the new lights improve crew circadian rhythms, sleep, and cognitive performance. Results from this investigation also have implications for people on Earth who use electric lights.

Light Microscopy Module (LMM) Camera Inspections: After completing routine inspections of the LMM Confocal Unit, LMM Confocal Camera, LMM Wide-field Camera, and the LMM Observation Camera for shattered materials, the crew reported that no damage was found to the equipment.  The Light Microscopy Module (LMM) is a modified commercial, highly flexible, state-of-the-art light imaging microscope facility that provides researchers with powerful diagnostic hardware and software onboard the International Space Station (ISS). The LMM enables novel research of microscopic phenomena in microgravity, with the capability of remotely acquiring and downloading digital images and videos across many levels of magnification. The way that matter is organized and moves on the microscopic level profoundly affects the macroscopic world and an understanding of such processes helps scientists and engineers build more efficient materials and machines both for both the earth and space environments.

MAGVECTOR: The crew configured the power supply and supporting equipment prior to initiating the 13th experiment run of the MAGVECTOR investigation, which ends Thursday of next week.  MAGVECTOR investigates how Earth’s magnetic field interacts with an electrical conductor. Using extremely sensitive magnetic sensors placed around and above a conductor, researchers can gain insight into ways that the magnetic field influences how conductors work. This research not only helps improve future International Space Station experiments and electrical experiments, but it could offer insights into how magnetic fields influence electrical conductors in general, the backbone of our technology.

Today’s Planned Activities
All activities were completed unless otherwise noted.

  • Atmosphere Control and Supply (ACS) Nitrogen Manual Valve Close
  • At Home In Space Culture Photo
  • CB/ISS CREW CONFERENCE
  • Combustion Integrated Rack Alignment Guide Install
  • ESA Weekly crew conference
  • ESA-PAO-RAI PRIX
  • Handover Feedback Questions
  • Health Maintenance System (HMS) Food Frequency Questionnaire (FFQ)
  • In Flight Maintenance Main Bus Switching Unit (MBSU) Check Out
  • In-Flight Maintenance (IFM) Main Bus Switching Unit (MBSU) Repair
  • IMS Delta file prep
  • JEM Airlock Slide Table (ST) Extension to JPM Side
  • JEM Airlock Slide Table (ST) Retraction from JPM Side
  • LMM Camera Inpsection
  • LMM Maintenance Work Area Containment System Setup
  • ACE MWA Preparation
  • Lighting Effects Sleep Log Entry – Subject
  • Preparing For Upcoming MagVector Science Run
  • Joint Station Local Area Network (LAN) (JSL) Network Information for JSL Administration (NINJA) Print
  • Recorded Greeting Request
  • Structures & Mechanisms (S&M) JEM ORU XFER I/F INSPECTION
  • Structures and Mechanisms (S&M) JEM ORU Xfer I/F (JOTI) Main Bus Switching Unit (MBSU) Install
  • Structures and Mechanisms (S&M) JEM ORU Xfer I/F (JOTI) Main Bus Switching Unit (MBSU) Remove
  • Station Support Computer (SSC) 5 Return
  • Tropical Cyclone Hardware Closeout
  • Tropical Cyclone Untended Operations
  • Tear Down of Remote RS Laptop Setup. Tagup with specialists
  • Preparation and Configuration Setup for Remote RS Laptop on USOS. Tagup with specialists
  • On MCC GO Testing RS Remote Laptop with КЦП1 and КЦП2. Tagup with specialists
  • INTERACTION-2. Experiment Ops
  • Preparation of Reports for Roscosmos web site and social media
  • Filling (separation) of ЕДВ (КОВ) for Elektron or ЕДВ-СВ
  • Measuring CO level in RS using US portable CSA-CP device
  • СОЖ maintenance
  • Adjusting position of the regulator valve [КР] in the Air Conditioning System [СКВ1]. Tagup with specialists
  • MPEG-2 TV Downlink Test via KU-band prior to Soyuz 734 Docking to the ISS. Tagup with specialists
  • Cleaning FGB panel vent screens (116, 316, 231, 431)
  • ECON-M. Observation and photography

Completed Task List Activities

  • None

Ground Activities
All activities were completed unless otherwise noted.

  • None

Three-Day Look Ahead:

  • Friday, 09/08:  Mouse TCU preparation, RR9 Habitat restock, ACME
  • Saturday, 09/09: Lung Tissue Media Fixation, Weekly Housekeeping, Off Duty
  • Sunday, 09/10:  Lung Tissue sample ops, Off Duty

QUICK ISS Status – Environmental Control Group:

  Component

Status

Elektron

On

Vozdukh

Manual

[СКВ] 1 – SM Air Conditioner System (“SKV1”)

On          

[СКВ] 2 – SM Air Conditioner System (“SKV2”)

On

Carbon Dioxide Removal Assembly (CDRA) Lab

Standby

Carbon Dioxide Removal Assembly (CDRA) Node 3

Operate

Major Constituent Analyzer (MCA) Lab

Idle

Major Constituent Analyzer (MCA) Node 3

Operate

Oxygen Generation Assembly (OGA)

Process

Urine Processing Assembly (UPA)

Standby

Trace Contaminant Control System (TCCS) Lab

Full up

Trace Contaminant Control System (TCCS) Node 3

Off