ISS Daily Summary Report – 10/02/2017

External Television Camera Group (ETVCG) Light Bulb R&R: Today the crew will removed, replaced, and tested two metal halide lamps bulbs. These light assemblies are used to illuminate sections of ISS during periods of darkness and support continuous operations.  After bulb failure, these assemblies can be removed and replaced during an Extra Vehicular Activity.  

Rechargeable Extravehicular Battery Assembly (REBA) Hardware Checkout: In support of the upcoming LEE-A EVA on Thursday, crewmembers installed freshly charged REBAs and perform a series of checkouts to ensure optimum performance.  

External Robotics Operations:  Today ground controllers translated the Mobile Transporter (MT) from Worksite 6 to Worksite 5 and maneuver the Space Station Robotics Manipulator System (SSRMS) in preparation for Thursday’s LEE-A EVA. The MT is moveable platform which allows the SSRMS to operate across multiple areas of ISS.   

Today’s Planned Activities
All activities are were completed unless otherwise noted.

  • High Rate Dosimeter (HRD) Data Take
  • Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Water Recovery System (WRS) Sample Analysis
  • Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Sample Data Record
  • Extravehicular Activity (EVA) Procedure Conference
  • Extravehicular Activity (EVA) Procedure Review
  • Rechargeable EVA Battery Assembly (REBA) Powered Hardware Checkout
  • Rechargeable EVA Battery Assembly (REBA) Installation
  • Health Maintenance System (HMS) Eye Exam – Fundoscope
  • Health Maintenance System (HMS) Fundoscope Tear Down and Stow
  • Health Maintenance System (HMS) OCT Exam
  • In-flight Maintenance (IFM) External Television Camera Group (ETVCG) Light Bulb R&R and Assembly Gather
  • In-flight Maintenance (IFM) External Television Camera Group Assembly (ETVCG)
  • In-flight Maintenance (IFM) External Television Camera Group (ETVCG) Bulb Remove and Replace
  • In-flight Maintenance (IFM) External Television Camera Group (ETVCG) Light Bulb R&R and Assembly Restow
  • Reactor Health Sensor (RHS) Seal Locate
  • JEM System Laptop Terminal Reboot
  • Charging EVA Camera D4 Battery
  • Photo/TV Flash Card Audit
  • Public Affairs Office (PAO) Event in High Definition (HD) – Lab
  • Video Recording of Greetings
  • Photography of RS windows: SM No.1, No.12 and DC1 ВЛ2
  • RELAKSATSIYA. Observation.
  • RELAKSATSIYA. Parameter Settings Adjustment.
  • RELAKSATSIYA. Charging battery for Relaksatsiya experiment (initiate)
  • Preparing for Antivirus scan on Auxiliary Computer Laptops
  • Auxiliary Laptop Computer System Virus Definition File Update
  • PROFILAKTIKA-2. Operator Assistance in Preparation for the Experiment
  • PROFILAKTIKA-2. Experiment Ops on БД-2 Treadmill (MO-3 test in a passive mode).
  • PILOT-T. Experiment Ops.
  • Exercise Data Downlink via OCA
  • СОЖ maintenance
  • VIZIR. Experiment Ops. Tagup with specialists

Completed Task List Activities

  • Crew Support LAN (CSL) 1 hard drive swap and client reload
  • ESA-PAO-DARWIN
  • ESA-PAO-ECONOMIC
  • ESA-PAO-SPUTNIK
  • Extravehicular Activity (EVA) Simplified Aid for EVA Rescue (SAFER) Hand Control Module (HCM) Check
  • GALLEY RACK LOCKER INSTALL
  • Node 1 Camcorder HDSDI Cable Swap 

Ground Activities
All activities were completed unless otherwise noted.

  • MT Translation

Three-Day Look Ahead:

  • Tuesday, 10/03: DOUG Simulation, TOCA Checkout, ELF Operations, Eye Ultrasounds
  • Wednesday, 10/04: EVA Tool Config, EVA Procedure Review, HRF2 Inventory
  • Thursday, 10/05: US EVA 44: LEE-A R&R

QUICK ISS Status – Environmental Control Group:

  Component

Status

Elektron

On

Vozdukh

Manual

[СКВ] 1 – SM Air Conditioner System (“SKV1”)

Off          

[СКВ] 2 – SM Air Conditioner System (“SKV2”)

On

Carbon Dioxide Removal Assembly (CDRA) Lab

Standby

Carbon Dioxide Removal Assembly (CDRA) Node 3

Operate

Major Constituent Analyzer (MCA) Lab

Idle

Major Constituent Analyzer (MCA) Node 3

Operate

Oxygen Generation Assembly (OGA)

Process

Urine Processing Assembly (UPA)

Standby

Trace Contaminant Control System (TCCS) Lab

Full up

Trace Contaminant Control System (TCCS) Node 3

Off