ISS Daily Summary Report – 2/07/2019

SlingShot: Today crewmembers installed two Slingshot deployables (SEOPS-Quantum Radar -1 and -2s) on to the outer hatch of the Cygnus Spacecraft. Also installed in a deployable slot is the UbiquityLink-1 orbit to ground communications hardware. The two passive optical reflector satellites will be released after Cygnus moves away from the ISS. SEOPS’ SlingShot is a small satellite deployment system that fits inside the Cygnus spacecraft’s Passive Common Berthing Mechanism (PCBM). SlingShot can accommodate up to eighteen satellites that are deployed post Cygnus unberth.

Cygnus Departure Preparations: Today, the crew installed the starboard and port Controller Panel Assemblies (CPAs), re-installed the Node 1 Nadir thermal cover and closed the Node 1 Nadir hatch. The crew then completed the Pressure Management Device (PMD) setup in preparation for vestibule depress. Cygnus unberth is scheduled for tomorrow morning with release at 16:10 GMT (10:10 AM CT). 

Completed Task List Activities:

  • None

Ground Activities:
All activities are complete unless otherwise noted.

  • Cygnus departure preparations

Two-Day Look Ahead:  

Friday, 02/08
Payloads:

  • Lighting Effects log (NASA)
  • Actiwatch data d/l (NASA)
  • Meteor H/D Swap (NASA)
  • MELFI 1-3 Icebrick insert (NASA)

Systems

  • Regenerative ECLSS Recycle Tank Drain and R&R
  • Node 1 CBM de-mate and Cygnus Release
  • SAFER Test Module Checkout

Saturday, 02/09
Payloads:

  • ISS Experience Node 2 Astronaut Log (NASA)

Systems:

  • None

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • Record video for CSA about physical activity in space
  • Install SlingShot hardware in Node 1/Cygnus Vestibule
  • Install SlingShot Deployer and Ubiquitylink payload.
  • Cygnus/Node 1 Vestibule Configuration for Demate – Part 2
  • N1 Deck hatch MPEV open
  • Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Calibration Check & Data Record
  • Extravehicular Activity (EVA)  Training Review
  • Health Maintenance System (HMS) ISS Food Intake Tracker (ISS FIT)
  • Delta file prep
  • Inventory Management System (IMS) Conference
  • ISS Experience Message Review
  • Lighting Effects Sleep Log Entry Subject
  • Restow Vestibule Outfitting Kit (VOK)
  • Node 1 Nadir CBM Control Panel Assembly (CPA) Installation
  • On-board Training (OBT) Cygnus Robotics Onboard Trainer (ROBoT) Release Session
  • PCS Laptop Relocate
  • Pressure Management Device (PMD) Equipment Setup and Power and Data connections
  • Pressure Management Device (PMD) Part 2
  • Polar 3/4 Hardware Install into Express Rack
  • Robotic Workstation (RWS) Setup
  • Station Support Computer (SSC) 13 Load Preparation
  • WORF Laptop Connect
  • DUBRAVA. Observation and Photography using VSS hardware
  • Photography of space behind SM panels 310, 339,338, 225
  • Photographing of RS modules.
  • PILOT-T. Experiment Ops. Tagup with specialists as necessary
  • СОЖ maintenance
  • ТГК 71P transfer operations
  • Replacement of FGB Power Supply System Module АБ5 800А Unit