ISS Daily Summary Report – 3/22/2019

USOS Extravehicular Activity (EVA) #52: Today Anne McLain (EV-1) and Nick Hague (EV-2) exited the Joint Airlock and performed US EVA #52 (Lithium Ion Battery R&R EVA #1) with a Phased Elapsed Time (PET) of 6h 39m. The primary purpose of this EVA was to facilitate the installation of new P4 Li-Ion batteries and completed tasks included:

  • Deploy V-Guide Bag on the S0 Starboard Wedge Face
  • Retrieve Adapter Plate A and B from the EP
  • Install Adapter Plate A in Slot 6
  • Relocate Battery 4 to Adapter Plate A
  • Install Adapter Plate B in Slot 4
  • Relocate Battery 2 to Adapter Plate B
  • Retrieve and Install Adapter Plate C in Slot 2
  • Channel 2A Battery Prep

The crew was also able to complete the following get ahead tasks: N1N Common Berthing Mechanism (CBM) cleaning, Truss Jumper imagery, P4 (4A) Solar Array Blanket Boxes (SABB) restraint bolt engagement, P4 (2A) SABB restraint bolt engagement, Airlock thermal cover imagery, and V-Guide bag imagery.

Completed Task List Activities:

  • Veggie plant check

Ground Activities:
All activities are complete unless otherwise noted.

  • EVA support

Look Ahead:  

Saturday, 03/23:
Payloads:

  • No utilization activities

Systems:

  • EVA debrief
  • EMU Water Recharge
  • METOX Regeneration Initiation
  • Housekeeping

Sunday, 03/24:
Payloads:

  • No utilization activities

Systems:

  • Crew off duty

Monday, 03/25:
Payloads:

  • Myotones
  • Cerebral Autoregulation
  • Food Acceptability
  • Material Science Laboratory Gas Supply Exchange

Systems:

  • EVA #53 prep 

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • Extravehicular Activity (EVA) Reminder for EVA In-Suit Light Exercise (ISLE) Preparation
  • USOS Extravehicular Activity (EVA) Communication Configuration
  • External Wireless Instrumentation System Network Control Unit EVA Inhibit
  • ISS HAM Radio Power Down in Service Module
  • ISS HAM Radio Power Down in Columbus
  • EVA COTS UHF Communication Unit (CUCU)  Verify off
  • Extravehicular Activity (EVA) In-Suit Light Exercise (ISLE) Preparation
  • Closing of SM windows  № 6,8,9,12,13,14 SM
  • VOZDUKH Deactivation. Activation of Vozdukh Atmosphere Purification System in mode 4.  Vozdukh Vacuum Valve Group (БВК) -1,2,3, [СОА] CYCLE =20 min, Fan [ВН] = 1 min, Air Regeneration [РВ] =100%
  • Recovery of Central Post Laptop RS3 File System.
  • CARDIOVECTOR. Experiment Ops (Session one).
  • Extravehicular Mobility Unit (EMU) Purge
  • CARDIOVECTOR. Photography of the Experiment Session
  • Extravehicular Mobility Unit (EMU) In-Suit Light Exercise (ISLE) Prebreathe
  • Countermeasures System (CMS) VELO Exercise session
  • Deinstallation of GoPro HERO3 cameras in Soyuz 742. Transfer of Video to Hard Drive. Flash card closeout ops. Start recharging batteries (6).  Tagup with specialists as necessary
  • Crewlock Depress
  • ПФ1, ПФ2 Dust Filter Cartridge Replacement and В1, В2 Fan Screen Cleaning in DC1 (ФГБ1ПГО_4_424_1, Bag 440-21 (00074645R) Discard the removed items. Reflect changes in IMS)
  • Crewlock Post Depress
  • Crewlock Egress
  • Photo/TV Node 3/Cupola Camcorder Setup
  • VGuide Bag Deploy
  • P4 Battery 4A R&R Worksite Preparation
  • ISS Crew Orientation
  • Familiarization with Auxiliary Computer System [ВКС].
  • SM Air Sampling for CO using ИПД
  • P4 Battery R&R Battery Adapter Plates Retrieval
  • Collecting SM and FGB Air Samples Using АК-1М Sampler
  • СОЖ maintenance
  • P4 Battery R&R Battery Adapter Plate A Install
  • Removal of TV cameras 1, 2 and Light Units ССД-302 in Soyuz 742 [CA] (Temp stow TV cameras КЛ-152М in Soyuz 742. ССД-302 light units – for disposal on Progress 440.)
  • ПФ1, ПФ2 Dust Filter Cartridge Replacement and В1, B2 Fan Screen Cleaning in MRM2
  • P4 Battery R&R Battery 4 Relocate
  • P4 Battery R&R Battery Adapter Plate B Installation
  • Soyuz 742 HERO3 GoPro camera batteries (6) recharge termination and stowage.
  • Progress 440 (SM Aft) Transfers and IMS Ops
  • P4 Battery R&R Battery 2 Relocate
  • Crew Time for ISS Adaptation and Orientation
  • P4 Battery R&R Battery Adapter Plate C Retrieval
  • PROFILAKTIKA-2. Exercise in [КОР-01-Н] set. Tagup with specialists as necessary
  • P4 Battery R&R Battery Adapter Plate C Installation
  • P4 Battery R&R Prepare 2A Battery and Cleanup 4A Worksite
  • Extravehicular Activity (EVA) Get Ahead Tasks
  • Crewlock Ingress
  • Crewlock Pre Repress
  • EVA Glove Photo Setup
  • Crewlock Repress
  • Extra Vehicular Activity (EVA) Post-EVA Activities
  • VOZDUKH Deactivation. Vozdukh Atmosphere Purification System [СОА] Mode 3 Activation. Vozdukh Vacuum Valve Group (БВК) 2,3, [СОА] CYCLE =20 min, Fan [ВН] = 1 min,  Air Regeneration [РВ] =100%
  • Extra Vehicular Activity (EVA) Post-EVA Glove Photos
  • External Wireless Instrumentation System (EWIS) Network Control Unit (NCU) Enable
  • Photo/TV Extravehicular Activity (EVA) Camera Disassembly
  • Photo/TV Extravehicular Activity (EVA) GoPro Downlink
  • EVA Glove Photo Downlink
  • Return to nominal comm configuration after USOS EVA
  • Extravehicular Activitiy (EVA) Suit Intravehicular (IV) Review