ISS Daily Summary Report – 5/01/2019

Crew Off-Duty:  The crew was off-duty today in preparation for SpaceX (SpX)-17 arrival scheduled on Sunday at 6:00 AM CT. SpX-17 launch is scheduled for Friday, May 3 at 2:11 AM CT. 

Main Bus Switching Unit (MBSU) Status: Following Monday’s MBSU 3 failure, team discussions led to the recommendation to Remove & Replace (R&R) the unit robotically. This morning the Mobile Transporter (MT) was translated from Work Site (WS)3 to WS6 and the Space Station Remote Manipulator System (SSRMS) is currently in the process of unstowing the Special Purpose Dexterous Manipulator (SPDM) from Mobile Base System (MBS) 2.  Once complete, the Mobile Servicing System (MSS) will be in a good config to replace the failed MBSU 3 on the S0 truss with the spare unit on External Stowage Pallet (ESP) 2 tomorrow morning. 

Completed Task List Activities:

  • Handover procedure questionnaire
  • LSG crew restraint install
  • Rodent Research

Ground Activities:
All activities are complete unless otherwise noted.

  • MT translation from WS6 to WS3
  • Prep for MBSU3 R&R

Look Ahead:
Thursday, 05/02 (GMT 122):

Payloads:

  • Rodent Research-12 Mass Measurement setup (NASA)
  • Veggie-PONDS reservoir fill (NASA)
  • Fiber Optic Production H/W stow

Systems:

  • Schedule is in work 

Friday, 05/03 (GMT 123):

Payloads:

  • RR-12 Habitat Restock and Foodbar exchange (NASA)
  • BCM Journal (NASA)
  • Food Acceptability (NASA)
  • ISS Experience Lab setup (NASA)
  • ISS HAM (NASA)

Systems:

  • SpX-17 launch
  • Dragon RoBOT OBT 

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • Filling (separation) of ЕДВ (КОВ) for Elektron or ЕДВ-СВ
  • Testing electrical circuits in БССК No.710003, No.710001, cable 17КС.420Ю 8242А-1600
  • Verification of ИП-1 Flow Sensor Position
  • Analysis of SM Atmosphere for Freon (Background Measurement) Using Freon Leak Analyzer/Detector (ФИТ)
  • Monthly health check of video recording equipment in the RS
  • Water Recovery and Management (WRM) Waste Water Bus (WWB) Combine
  • Condensate transfer from Lab Condensate tank to WPA Waste Water Tank
  • On MCC GO Mating Elektron-VM БССК telemetry connectors
  • Closeout Ops after Testing electrical circuits in БССК No.710003, No.710001, cable 17КС.420Ю 8242А-1600
  • PROFILAKTIKA-2. Exercise with [КОР-01-Н] set
  • Condensate direct transfer from Lab condensate tank to WPA waste water tank.
  • Water Recovery and Management (WRM) Waste Water Bus (WWB) Split
  • Preventive Maintenance of SM Ventilation Subsystem. Group А
  • СТТС Reconfiguration in MRM1
  • SEPARATION. Flushing and disinfecting of Container Unit (БЕ)
  • SEPARATION. Drying and Replacing Receiver Container [ЕР] in the Vacuum Unit
  • Comm reconfig for nominal ops
  • CONTENT. Experiment Ops
  • IMS Delta File Prep