ISS Daily Summary Report – 2/10/2020

Confined Combustion: The crew performed the final sample burn, removed the Confined Combustion hardware from MSG and stowed it.  The final sample was an acrylic (aka poly methyl methacrylate or plexiglass) sample installed with black baffles.  This project aims to study flame spread in confined spaces—specifically the interactions between spreading flames and surrounding walls. Flame spread in confined spaces (such as buildings and vehicles) may pose a more serious fire hazard than flame spread in open spaces because of acceleration caused by radiative heat feedback from the surrounding walls and a tunnel flow acceleration effect. However, several aspects of flame spread are difficult to study in normal gravity conditions. Gravity-driven buoyancy flow complicates the fire growth process and prohibits a fundamental understanding of the underlying physics. However, in microgravity, buoyancy is eliminated, allowing scientists to better study the physics of flame spread.

LSG (Life Science Glovebox):  The crew deployed the work volume so the ground teams could verify the recently-performed LSG work volume light repair was successful.  The lights were verified to be working nominally and the LSG was then powered down and stowed.  LSG is a sealed work area that accommodates life science and technology investigations in a “workbench” type environment. Due to its larger size design (0.42 cubic meter of enclosed work space), two crewmembers can work in the LSG simultaneously.  LSG provides air filtration for contaminant removal, adjustable fan speeds, 350 watts of 28Vdc and 110Vac power (combined), video and data recording, real time downlink, adjustable overhead illumination, temperature regulation (18-27ºC) and ferrous surfaces for magnetic attachment of investigation hardware.

Systems:

Oxygen Generation System (OGS) Hydrogen (H2) Sensor Orbital Replacement Unit (ORU) Remove & Replace (R&R):  Today, the crew performed an R&R of the OGS H2 sensor and cleaned the associated Avionics Air Assembly (AAA) inlet.  The H2 sensor R&R is routine maintenance activity and is necessary due to nominal degradation of the H2 sensor materials over time. Following today’s R&R, ground specialists will be conducting a checkout of the new sensor.

Urine Processor Assembly (UPA) Fluids Control and Pump Assembly (FCPA) Remove and Replace (R&R):  Ground teams are continuing to troubleshoot the root cause of the UPA low production rates. It is thought the cause of the UPA degraded performance is located somewhere between the FCPA and Distillation Assembly (DA); and as a result, the crew performed an FCPA R&R today. This evening, ground teams will perform a checkout of the FCPA to determine if today’s maintenance activity has resolved the UPA processing issue.

Completed Task List Activities:

  • EHS – CSA-CP Checkout
  • HV1 – Server UltraBay Hard Drive Reseat
  • UPA Troubleshooting Part 1
  • OBT – Updated Ammonia Response Review
  • Bartolomeo BPW Review
  • ISS Experience – Cupola and Pre-Sleep

Ground Activities:
All activities are complete unless otherwise noted.

  • Regenerative ECLSS UPA Deactivation/Activation and FCPA Checkout

Tuesday, 2/11 (GMT 042)
Payloads:

  • Bartolomeo Cable Connect
  • Dostel Cable Swap
  • HRF2 Rack Tilt

Systems:

  • ATCEX Filter Remove and Replace
  • UPA Distillate Hose R&R
  • OGS Stow
  • ARED 6-Month Maintenance
  • Acoustic Monitor Setup for Crew Worn Measurements

Wednesday, 2/12 (GMT 043)
Payloads/Systems:

  • Re-plan in-work due to NG-13 launch slip

Thursday, 2/13 (GMT 044)
Payloads/Systems:

  • Re-plan in-work due to NG-13 launch slip

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • Confined Combustion Test Operations
  • Photo T/V (P/TV) Advanced Resistive Exercise Device (ARED) Exercise Video Setup
  • В3 Fan Screen Cleaning in DC1
  • SEPARATSIA. [СРВ-У-РС] System Activation. Distillation cylinders activation.
  • Confined Combustion Hardware Stow
  • Filling (separation) of ЕДВ (КОВ) for Elektron or ЕДВ-СВ
  • Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Water Recovery System (WRS) Sample Analysis
  • LSG Work Volume Deploy
  • Hydrogen Sensor R&R Gather
  • In Flight Maintenance (IFM) Oxygen Generation System (OGS) Filter Maintenance Gather
  • SEPARATSIA. Readings taking
  • Regenerative Environmental Control and Life Support System (ECLSS) Oxygen Generation System (OGS) H2 Sensor Replacement
  • In Flight Maintenance (IFM) Oxygen Generation System (OGS) Internal ACTEX Pre-Flush
  • АСУ consumables set R&R
  • LSG Work Volume Stow
  • Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Sample Data Record and Waste Water Bag (WWB) Changeout
  • Urine Processor Assembly (UPA) Wastewater Storage Tank Assembly (WSTA) Drain to EDV
  • Remove portions of the Stall in support Fluids Control and Pump Assembly (FCPA) Remove and Replace
  • SEPARATSIA. [СРВ-У-РС] System Deactivation.
  • Photo/TV Camcorder Setup Verification
  • Tightening of DC1 – Progress 443 QD screw clamps
  • Replace Stall following Node 3 UPA Maintenance
  • Photo T/V (P/TV) Advanced Resistive Exercise Device (ARED) Exercise Video Stow
  • Exercise Data Downlink via OCA
  • Check Closure of SM window shutters 6,8,9,12,13,14.  Note 7.