ISS Daily Summary Report – 5/05/2020

Payloads

Wireless (Local Area Network) LAN Setup: The crew made the appropriate Wireless Adapter connection changes to prepare for a wireless access point (WAP)/camera checkout currently planned for next week.  The checkout will be between a Laptop in the Japanese Experiment Module (JEM) and an external WAP which is grappled by the Japanese Experiment Module remote manipulator system (JEMRMS).

Systems

Extravehicular Mobility Units (EMU) 3006/3009 Loop Scrub and Iodination: The crew performed EMU water loop scrubs and then acquired and tested water samples for conductivity on units 3006 and 3009. In addition the crew replaced the gas trap, pump inlet filter and water line vent tube assembly (WLVTA) components in EMU 3006. EMU Loop Scrubs are required preventive maintenance needed to remove any chemical and biological contaminants from the EMU transport loop.

Completed Task List Activities:

  • JEM Stowage Consolidation for HTV9

Today’s Ground Activities:
All activities are complete unless otherwise noted.

  • MT Translate
  • SSRMS LEE B Snare Survey
  • PEHG 2 Power Cycle

Look Ahead Plan

Wednesday, 5/6 (GMT 127)
Payloads:

  • Actiwatch plus
  • Astrobee battery charge
  • Food Acceptability
  • Slingshot controller rotate and data cable reconfig 

Systems:

  • Recycle Tank Drain to Resupply Tank (RST)
  • Thermal Amine Scrubber Powercycle

Thursday, 5/7 (GMT 128)
Payloads:

  • Food Physiology
  • JAXA Wireless Access point/camera install/checkout prep

Systems:

  • TOCA WRS Water Analysis
  • HTV Prox Checkout
  • Cygnus Cargo Ops

Friday, 5/8 (GMT 129)
Payloads:

  • Radi-N2 retrieval

Systems:

  • Crew Off Duty
  • HTV PCS HCP Checkout (Side A)

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • Extravehicular Activity (EVA) Extravehicular Mobility Unit (EMU) Gas Trap Remove and Replace (R&R)
  • URAGAN. Search for jumper cable
  • Photography of RS ISS Module Interiors (MRM1 and FGB)
  • Extravehicular Activity (EVA) Pump Inlet Filter Remove and Replace (R&R)
  • PILOT-T. Experiment Ops
  • Extravehicular Mobility Unit (EMU) Water Line Vent Tube Assembly (WLVTA) Remove and Replace (R&R) with Inspection
  • Extravehicular Mobility Unit (EMU) Cooling Loop Maintenance Scrub
  • Makita tool battery No. 3,4 & 5 charging
  • Extravehicular Mobility Unit (EMU) Cooling Loop Maintenance Iodination
  • Monthly maintenance of Broadband Comm System (ШСС) MDM vent grills and Lira Equipment Fan (ВОЛ)
  • Life on the Station Photo/Video
  • Regenerative Environmental Control and Life Support System (RGN) Wastewater Storage Tank Assembly (WSTA) Fills
  • Filling (separation of ЕДВ [КОВ] for Elektron or ЕДВ-[СВ]
  • Changeout of adjustable length hoses and КЛ-3 valve in condensate water processing system [СРВ-К2М]
  • JEM WIS RSU B4 Sensor Correction for RSU B4 S/N 1001 at JPM1F0
  • JEM PS-120 Wireless Adapter connection to PLT3
  • Teardown Makita charging equipment setup, stow batteries and equipment
  • Video of Greetings. Downlink files via OCA
  • URAGAN. Observation and photography