ISS Daily Summary Report – 6/15/2020

Payloads

REDEYE:  The crew installed the RED-EYE 2 satellite onto the Japanese Module (JEM) KABOR deployer system on the JEM Airlock slide table. The crew also replaced the old capture mechanism with a new unit and took the multilayer insulation (MLI) from the old unit and installed it onto the new capture mechanism unit. The RED-EYE program develops and demonstrates technologies which increase the utility of low-cost microsatellites using the Kaber Micro Satellite Deployer attached to the Special Purpose Dexterous Manipulator (SPDM).

Mochii: The crew attempted to install the Mochii Microscope. The crew was not able to successfully power on the unit and the installation was aborted. The ground teams will assess configuration photos and will provide future trouble shooting steps. Mochii is a miniature scanning electron microscope (SEM) with spectroscopy to conduct real-time, on-site imaging and compositional measurements of particles on the International Space Station (ISS). Such particles can cause vehicle and equipment malfunctions and threaten crew health, but currently, samples must be returned to Earth for analysis, leaving crew and vehicle at risk. Mochii also provides a powerful new analysis platform to support novel microgravity science and engineering.

Repository: The crew performed the Urine Collection setup in support of the Repository study. Repository supports scientific discovery that contributes to our fundamental knowledge in the area of human physiological changes and adaptation to a microgravity environment and provides unique opportunities to study longitudinal changes in human physiology spanning many missions.

Systems

Rack Transfer Preparations: Two new payload racks, Express Rack-11B (ER11B) and the European Drawer Rack 2 (EDR2), were delivered on H-II Transfer Vehicle (HTV)9. Today, the crew staged the Columbus module in preparation for the transfer of the new racks from HTV9. Preparations included relocating cargo from the Columbus module, emptying out and deinstalling the European Transport Carrier (ETC) locker, and clearing out payload cargo from the Columbus Overhead 2 (COL1O2) rack. The two racks will be transferred from HTV9 tomorrow and the ETC will be transferred to HTV9 for disposal.

Potable Water Dispenser (PWD) Sample Collection: Crew collected water samples from the Potable Water Dispenser (PWD) to perform a Total Organic Carbon Analyzer (TOCA) analysis that measures the amount of organic constituents in the potable water.  The crew also tested the water samples for the presence of Coliform bacteria utilizing a Coliform test bag. The ground team encountered issues today with the Nitrogen/Oxygen Recharge System (NORS) tanks which resulted in a delay in the TOCA analysis. The crew will reconvene in the morning with steps to complete the TOCA sample analysis and also perform a waste water bag (WWB) changeout.

S6 Battery Extravehicular Activity (EVA) Preparations: In preparation for the S6 Battery EVA currently planned for Friday, June 26th, the crew completed the following:

  • EMU Rechargeable EVA Battery Assembly (REBA) install and checkout on both suits (3004/3006).
  • EVA suit intravehicular (IV) Review: The IV crew reviewed reminders, emergency briefing, helpful tips and procedures used during EVA prep.
  • Termination of the second set of Battery Stowage Assembly (BSA) battery maintenance.

On-Orbit Hearing Assessment (O-OHA): Today the crew performed an auditory test as a baseline for future exams conducted periodically during their stay on the ISS. The assessment measures hearing function while crewmembers are exposed to noise and microgravity during long-duration spaceflight.  The exam is performed in conjunction with the crew-worn acoustic monitor surveys.

Periodic Health Exam (PHS): Today the crew completed a periodic health evaluation. During the evaluation, vital signs are obtained and an ear examination is conducted by taking images of the tympanic membranes and the external ear. The data and imagery is then downlinked for review by a medical specialist.

Completed Task List Activities:

  • iPad To CrewNet – 1006
  • Atmospheric Control System (ACS) Nitrogen Oxygen Recharge System(NORS) Nitrogen Transfer Termination
  • Uninstalling and stowing the NORS N2 Tank from the AIK
  • ACS NORS Nitrogen Transfer Initiation

Today’s Ground Activities:
All activities are complete unless otherwise noted.

  • X2R18B Software Transition
  • Airlock LTL Flow support

Look Ahead Plan

Tuesday, 6/16 (GMT 168)
Payloads:

  • Hourglass SD cared removal (JAXA)
  • HRF Urine collect (NASA)
  • HRF Blood setup (NASA)
  • JEM A/L depress for REDEYE-2 (NASA)
  • CIR ACME Bottle Exchange (Joint)
  • CDM Plate Config (NASA)
  • ISS HAM (NASA) 

Systems:

  • BEAM Ingress
  • EVA Tool Config
  • ETC Rack Transfer
  • ER-11B Rack Transfer
  • EHS Acoustic Monitoring 

Wednesday, 6/17 (GMT 169)
Payloads:

  • HRF Urine collect (NASA)
  • HRF Blood collect (NASA)
  • REDEYE-2 Deploy Imagery (NASA)
  • LIDAL reinstallation (NASA)

Systems:

  • EVA Procedure Review & Conference
  • Dragon Suit Inspect
  • EVA Tool Config

Thursday, 6/18 (GMT 170)
Payloads:

  • EM Sample Exchange (4) (NASA)
  • Food Physiology (NASA)

Systems:

  • EVA Loop Scrub
  • EVA DOUG Review
  • RGN Recycle Tank Ops & WSTA Fill

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • Acoustic Monitor Setup for Crew Worn Measurements & Battery Swaps
  • Red Eye Satellite Operations Review
  • Cleaning FGB Gas-Liquid Heat Exchanger (ГЖТ) Detachable Screens 1, 2, 3
  • Red Eye Satellite Mission 2 Hardware Gather
  • Nikon camera sync with station time
  • Countermeasures System (CMS) Advanced Resistive Exercise Device (ARED) Cylinder Flywheel Evacuation
  • Health Maintenance System (HMS) Periodic Health Status (PHS) Evaluation
  • JEM Airlock Press & Leak Check
  • PK-4 Video Monitor Installation& Checkout
  • Columbus Bay 1,2,3 and 4 cargo relocation
  • Photo T/V (P/TV) Advanced Resistive Exercise Device (ARED) Exercise Video Session
  • Adjusting БРП-М Warm valve in [СРВ-К2М]. БРП-М Replacement if necessary
  • FGB (ГА) Vacuum Cleaning
  • Dust collectors ПC1, ПС2 Dust Collectors Filters Vacuum Cleaning in FGB (panels 203, 403)
  • Transfer cargo from ETC before de-installation.
  • A/L Adapter Plate (JCAP) and NanoRacks Kaber Plate (STEP) Installation
  • URAGAN. Observation and photography using the camera
  • JPM1D5 Rack Clear
  • Red Eye Satellite Mission 2 Hardware Preparation and Installation on the JEM Airlock Slide Table
  • PK-4 flex hose connection to Cleaning gas bottle
  • COL1O2 HRF Hardware Trash
  • COL1O2 Clear
  • JEM Airlock Slide Table (ST) Retraction & Extension
  • Ultrasound 2 HRF Rack 2 Stow Alternate
  • JEM Airlock Slide Table Passive Capture Mechanism MLI Replacement & Removal
  • MELFI 1 Ice Brick Insert 2
  • Environmental Health System (EHS) Potable Water Dispenser (PWD) Sample Collect
  • Extravehicular Activity (EVA) Procedure Review
  • MOCHII On-Board Training
  • Progress 443 (DC1): Disposable Equipment  Stow and IMS update
  • Battery Stowage Assembly (BSA) Operation Termination
  • Rechargeable EVA Battery Assembly (REBA) Installation & Powered Hardware Checkout
  • Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Potable Water Dispenser (PWD) Sample Analysis
  • Rack Transfer Stowage Gather
  • Mochii Installation, Activation and First Sample Load [ABORTED]
  • MATRYOSHKA-R. Tritel Hardware Monitoring
  • Multi-use Variable-g Platform-02 Switch On
  • Regenerative Environmental Control and Life Support System (RGN) Wastewater Storage Tank Assembly (WSTA) Fill [ABORTED]
  • Environmental Health System (EHS) Coliform Water Processing
  • HRF Generic Urine Collection Setup
  • Exercise Data Downlink via OCA
  • On-Orbit Hearing Assessment (O-OHA) with EarQ Software Setup and Test
  • UF-ATMOSPHERE. Scientific Hardware Installation, Activation & Monitoring
  • PK-4 Chamber Gas Exchange
  • Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Sample Data Record [ABORTED]
  • Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Waste Water Bag (WWB) Changeout [ABORTED]