Payloads
RED-EYE: The crew took photos of the REDEYE-3 satellite deployment. The RED-EYE program develops and demonstrates technologies which increase the utility of low-cost microsatellites using the Kaber Micro Satellite Deployer attached to the Special Purpose Dexterous Manipulator (SPDM). The RED-EYE program develops and demonstrates technologies which increase the utility of low-cost microsatellites using the Kaber Micro Satellite Deployer attached to the SPDM.
Systems
Extravehicular Mobility Unit (EMU) On-Orbit Fit Verification (OFV): Today the crew completed an OFV in support of upcoming S6 Channel 1B Battery Extravehicular Activity (EVAs). During the OFV, the crew took body measurements and resized their EMUs to ensure proper fit. Each EMU contains exchangeable components allowing each astronaut to adjust EMU fit to their individual preference. The EVAs are currently planned for June 26 and July 1.
EVA Robotics Training: Today, the crew completed an On-Board Training (OBT) session on the EVA robotics and participated in a conference with the ground team prior to the session. The crew also reviewed robotics procedures in preparation for the training session.
Completed Task List Activities:
- HTV Cargo Ops (ongoing)
- PMM1P4 ZSR fill
- ESA Trash Pre-Gather for HTV9 Disposal
Today’s Ground Activities:
All activities are complete unless otherwise noted.
- Ground Support for KABER Deploy
- Channel 1B Battery Discharge and Safing
- Audio Configuration for EMU OFV
Look Ahead Plan
Wednesday, 6/24 (GMT 176)
Payloads:
- FSL SMD sample exchange (ESA)
- Space Studio KIBO laptop setup (JAXA)
- CDM Plate Changeout (NASA)
- EM Hardware Stow (NASA)
Systems:
- HTV Cargo Ops
- HMS WinSCAT
- OBT Med Contingency Drill
- EVA Safer C/O
- EVA Suit IV Review
- EVA Cuff Print
Thursday, 6/25 (GMT 177)
Payloads:
- RADIN Deploy (ESA)
Systems:
- EVA Tool Audit
- EVA Procedure Review/Conference
- EVA Equipment Lock Prep Pt 2
- EVA PGT Battery Install
- HMS WinSCAT
- HMS PHS Pre-EVA Exam
Friday, 6/26 (GMT 178)
Payloads:
- ISS HAM hardware stow
Systems:
- S6 1B Battery EVA#1 (Prep and EVA)
Today’s Planned Activities:
All activities are complete unless otherwise noted.
- Checkout of Virus Definition File Update on Auxiliary Computer System [ВКС] Laptops and Report
- Extravehicular Activity (EVA) Procedure Review
- TERMINATOR. Terminator-Limb PL Installation
- Air sample collection using Draeger tube air sampler (ИПД) in SM for CO
- Air sampling from SM and FGB using [АК-1М] sampler
- Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Water Recovery System (WRS) Sample Analysis & Data Record
- Vacuum Cleaning of Dust collectors ПC1, ПС2 filter cartridges in FGB (panels 203, 403)
- Changeout of Replaceable Condensate Removal Lines [СМОК]
- Onboard Training (OBT) Robotics On-board Trainer (ROBoT) Conference
- On-board Training (OBT) EVA Robotics Onboard Trainer (ROBoT) Session
- Environmental Health System (EHS) Acoustic Monitor Setup
- Filling (separation) of ЕДВ-СВ or ЕДВ [КОВ] for Elektron-VM
- Acoustic Monitor Setup for Static Measurements
- INTERACTION. Experiment Ops
- Extravehicular Activity (EVA) Extravehicular Mobility Unit (EMU) On-orbit Fitcheck Verification (OFV)
- ISS repress with O2 from Progress 443 (DC1) СрПК Section 1
- TERMINATOR. Deinstallation of Terminator-Limb PL
- Progress 448 (SM Aft) Transfers and IMS Ops
- URAGAN. Installation and activation of SOVA and VSS PL