ISS Daily Summary Report – 6/26/2020

Systems

USOS Extravehicular Activity (EVA) #65/S6 Battery EVA #1:  Chris Cassidy (EV1) and Bob Behnken (EV2) performed a 6 hour 7 minute EVA that completed the following tasks in support of the S6 Channel 1B battery transition from nickel hydrogen to lithium-ion batteries:

  • NiH2 Battery 1 from S6 IEA to External Pallet (EP)
  • Li-Ion Battery A from EP to S6 IEA Slot 1
  • NiH2 Battery 2 from S6 IEA to EP / Adapter Plate A from EP to S6 IEA Slot 2
  • Battery 3 from S6 IEA Slot 3 to Adapter Plate A in Slot 2
  • Li-Ion Battery B from EP to S6 IEA Slot 3
  • NiH2 Battery 4 from S6 IEA to EP / Adapter Plate B from EP to S6 IEA Slot 4 (Get Ahead)
  • NiH2 Battery 6 from S6 IEA slot 6 to Adapter Plate B (Get Ahead)

Completed Task List Activities:

  • None

Today’s Ground Activities:
All activities are complete unless otherwise noted.

  • USOS Ground Support for US EVA #65

Look Ahead Plan

Saturday, 6/27 (GMT 179)
Payloads:

  • No Payload Activities 

Systems:

  • Post EVA PHS
  • EMU Water Recharge
  • EVA Procedure Review
  • EVA Debrief

Sunday, 6/28 (GMT 180)
Payloads:

  • Off-Duty 

Systems:

  • Crew Off Duty

Monday, 6/29 (GMT 181)
Payloads:

  • No Payload Activities 

Systems:

  • MAX CEVIS
  • EVA Tool Config
  • EVA DOUG Review
  • EVA Procedure Conference
  • HTV Cargo Ops 

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • ISS HAM Radio Power Down in Columbus
  • ISS HAM Radio Power Down in Service Module
  • EVA COTS UHF Communication Unit (CUCU)  Verify off
  • USOS Extravehicular Activity (EVA) Communication Configuration
  • Extravehicular Activity (EVA) In-Suit Light Exercise (ISLE) Preparation
  • Checking cover closure on SM windows 6, 8, 9, 12, 13, 14
  • Extravehicular Mobility Unit (EMU) Purge
  • Extravehicular Mobility Unit (EMU) In-Suit Light Exercise (ISLE) Prebreathe
  • Changeout of Replaceable Condensate Removal Lines [СМОК]
  • Crewlock Depress
  • SSRMS EVA Setup
  • Crewlock Post Depress
  • Crewlock Egress
  • Worksite Preparation
  • Move Battery 1 to EP Slot X
  • LOR. Experiment Session.
  • SSRMS EVA Support
  • Move Battery A to Slot 1
  • Move Battery 2 to EP A / AP A to Slot 2
  • Progress 443 (DC1) Stowage Ops with IMS Support
  • Move Battery 3 to AP A Slot 2
  • Move Battery B to Slot 3
  • ISS N2 repress from Progress 443 (DC1) СрПК Section 2
  • Cleanup
  • EVA Crew Lock Ingress
  • EVA Glove Photo Setup
  • ISS O2 repress from Progress 443 (DC1) СРПК Section 1
  • Portable Computer System (PCS) Serial Transfer – OFF
  • Crewlock Pre Repress
  • Crewlock Repress
  • Extra Vehicular Activity (EVA) Post-EVA Activities
  • Extra Vehicular Activity (EVA) Post-EVA Activities
  • USOS Extravehicular Activity (EVA) Communication Deconfiguration
  • EVA Glove Photo Downlink
  • Photo/TV Extravehicular Activity (EVA) Camera Disassembly
  • Photo/TV Extravehicular Activity (EVA) GoPro Downlink
  • ISS HAM Radio Power Up in Columbus