ISS Daily Summary Report – 6/15/2021

Payloads:

Oral Biofilms in Space (OBIS): The crew hydrated the OBIS assembly session packs 6-10 with fluid flow from Fluid Bag 1 into the Fluid Chamber for 30 minutes. The mixture was allowed to sit for 4 hours and then the fluid flow was reinitiated. The session packs were then incubated for 20 hours. Fluid Bag 1 is a fluid medium containing chemicals designed to promote bacterial growth within the Fluid Chamber. Effect of Environmental Stressors on Oral Biofilm Growth and Treatment (Oral Biofilms in Space) studies the effect of gravity on the behavior of oral bacteria, including the structure of the bacterial community, and changes in bacterial response to common oral care agents. The findings could support development of novel treatments to fight oral diseases such as caries, gingivitis, and periodontitis. The investigation also could provide insights into how microgravity affects the microbiome of other mucosal surfaces in the body.

Systems:

Mobile Base System (MBS) Payload/Orbital Replacement Unit (ORU) Accommodation (POA) Video Recovered – Over the weekend, teams developed a command-from-scratch to work around a software error in Mobile Servicing System (MSS) version 10.2 which prevented POA video from being routed to the ground. The new commands were tested, approved yesterday morning, and successfully executed on-board yesterday afternoon. POA video is now available for ISS Roll Out Solar Array (IROSA) Flight Support Equipment (FSE) POA removal and installation tasks in support of this week’s EVAs.

Extravehicular Activity (EVA) Preparations: The crew performed several activities in preparation for tomorrow’s 2B IROSA install EVA. The crew setup the Equipment Lock (E-LK) and Robotic Workstation (RWS), installed batteries into the EVA Pistol Grip Tool (PGT) and performed an EVA tool audit. Lastly, they completed a procedure review and conference with ISS ground teams.

Completed Task List Activities:

  • None

Today’s Ground Activities:
All activities are complete unless otherwise noted.

  • Ground support for RSA water transfer
  • Atmosphere Revitalization System (ARS) Thermal Amine Scrubber (TAS) Vacuum Leak Check [ACTIVE]

Look Ahead Plan:

Wednesday, June 16 (GMT 167)
Payloads:

  • OBIS Bag2 initiate (NASA)
  • AC Touch (NASA)

Systems:

  • 2B IROSA EVA

Thursday, June 17 (GMT 168)
Payloads:

  • OBIS Bag3 initiate (NASA)
  • Food Acceptability (NASA)
  • ManD print of AstroVest parts (NASA)
  • Lyo-2 Sample stow and install (NASA)
  • Food Physiology Brief (NASA)
  • Standard Measures Presleep Question (NASA)
  • NRCSD-20 Deployer removal (NASA)
  • ISS HAM (NASA)

Systems:

  • EVA tether inspection
  • Extravehicular Mobility Unit (EMU) Long Life Battery (LLB)/Metal Oxide (METOX) Installation
  • EVA debrief
  • Rechargeable EVA Battery Assembly (REBA) charge
  • In Flight Maintenance (IFM) Waste and Hygiene Compartment (WHC) Pre-Treat Tank Remove & Replace

Friday, June 18 (GMT 169)
Payloads:

  • JAXA Moderate Temp PCG Sample prep (JAXA)
  • AC Touch (NASA)
  • Food Acceptability (NASA)
  • NanoRacks Module-83 Photo (NASA)
  • Standard Measures Post Sleep Question (NASA)
  • PK-4 disk audit (Joint)

Systems:

  • Robotics Procedure Review
  • Extravehicular Activity (EVA) Procedure Review
  • EVA tool configuration
  • ROBoT training

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • Health Maintenance System (HMS) Periodic Health Status (PHS) Pre EVA Examination
  • Dragon Cargo Transfer
  • Robotics Procedure Review
  • Equipment Lock (E-LK) Preparation
  • Extravehicular Activity Station Support Computer Relocate
  • Extravehicular Activity (EVA) Tool Configuring
  • Extravehicular Activity Pistol Grip Tool Battery Installation
  • Extravehicular Activity (EVA) Tool Audit
  • Solid Combustion (SCEM) OS Troubleshoot
  • Oral Biofilms In Space (OBiS) Assembly Hydration
  • Extravehicular Activity (EVA) Procedure Review
  • Oral Biofilms In Space (OBiS) Fluid Chamber Power Down
  • Extravehicular Activity (EVA) Procedure Conference
  • Artemis HEREA Power Down
  • Extravehicular Activity (EVA) iPad Contingency Procedures preparation
  • Robotic Workstation (RWS) Setup
  • RSA Water Transfer
  • Urine Transfer System Offload EDV Swap
  • Oral Biofilms In Space (OBiS) Fluid Chamber Power On
  • Oral Biofilms In Space (OBiS) MERLIN OBiS Assemblies Insertion