Crew-3 Endurance Departure: The Crew-3 Endurance spacecraft departed ISS with its crew of four crewmembers on May 5 at 12:20 am CT. CDR Raja Chari, PLT Tom Marshburn, MS1 Matthias Maurer and MS2 Kayla Barron are scheduled to splash down near Tampa, Florida on May 5 at 23:43 CST. This concludes a 175 day flight for the Crew-3 Endurance spacecraft.
European Robotic Arm (ERA) Operations: Crew performed operations to disconnect ERA’s End Effector 2 from Base Arm Attachment Point 1 and attach that End Effector 2 to Base Arm Attachment Point 3. The attachment to Base Arm Attachment Point 3 was unsuccessful, so the ERA was moved to a Park position while ground specialists review the data and develop a forward plan. The Park position is a safe long term configuration and is safe for all ISS dynamic operations. The walk-off to Base Arm Attachment Point 3 is the last step in ERA Mission 2 operations.
Completed Task List Activities:
- None
Today’s Ground Activities:
All activities are complete unless otherwise noted.
- Post-Undocking ISS Systems configurations
Look Ahead Plan
Friday, May 6 (GMT 126)
Payloads:
- CAL MTL leak check
- Food Physiology
- GLACIER1 hardware inspection
- GRASP seated
- MSG facility activation
- Photocatalyst filter check
- XROOTS plant install 1
Systems:
- Urine Transfer System (UTS) Offload EDV Swap
- ISS USOS Food Audit
Saturday, May 7 (GMT 127)
Payloads:
- Photocatalyst filter check
Systems:
- Housekeeping
Sunday, May 8 (GMT 128)
Payloads:
- Payload NAS deep clean
- Photocatalyst filter check
Systems:
- Crew Off-duty
Today’s Planned Activities:
All activities are complete unless otherwise noted.
- Crew Alternate Sleep Accommodation (CASA) Closeout
- Dragon Cargo Transfer
- Crew Dragon Cargo Closeout
- HRF Generic Ambient Blood Collection Operator
- HRF Generic Ambient Blood Collection Subject
- Actiwatch Plus Watch Doff
- Dragon Space Station Computer (SSC) Deroute
- HRF Generic Ambient Blood Collection Pack and Handover
- HRF Generic HRF Centrifuge Frozen Blood Collection Conclude and Stow
- Dragon Initial Configuration for Undock
- Dragon Nadir Center of Gravity (CG) Correct
- Crew ID Bracelet Don
- Dragon Forward Final Cabin Configuation for Departure
- Dragon Space Suit Donning for Return
- IDA Egress in Preparation for Departure
- Dragon Forward Hatch Close
- Health Maintenance System (HMS) ISS EveryWear (EVW) Nutrition Tracking
- ISS Crew Orientation
- Docking Dragon Monitoring Tools Setup
- Resupply Air Tank Teardown
- USOS Window Shutter Close
- Dragon Crew Departure from ISS Activity
- Dragon Monitoring Tools Teardown