ISS Daily Summary Report – 11/18/2022

Payloads:

Nanoracks Module-9: Several photos were taken of the Nanoracks Module-9 hardware while in the Cupola area. NanoRacks Module-9 consists of multiple student experiments in individual Mixture Tubes all housed within a NanoRacks Module container.  Some experiments require crew interaction to remove clamps in order to mix materials to activate and/or deactivate the experiments. The experiments within the module are returned to the ground for analysis.

Systems:

Urine Processor Assembly (UPA) Pressure Control and Pump Assembly (PCPA) Remove and Replace (R&R): Overnight the UPA failed and teams stood down from use. After reviewing the data, ground teams directed the crew to R&R the PCPA and were able to successfully recover UPA. The PCPA is the motor force of gasses in the UPA, pumping gas out of the distillation assembly (DA) and fluids control and pump assembly (FCPA) in order to reduce internal pressure.

Extravehicular Activity (EVA) Tool Configuring and Inspections: The crew configured tools for the upcoming ISS Roll Out Solar Array (IROSA) install EVAs for the 3A and 4A Solar Array Wing. Along with that, the crew inspected load alleviating strap on safety tethers, waist tethers, and soft strap on D-Ring extenders. The crew also inspected for damaged cords on mounted and unmounted retractable equipment tethers (RETs). These inspection activities are crucial for safety and necessary to complete prior to each series of EVAs.

Robotics Procedure Review: Today the crew reviewed all the 3A EVA procedures in preparation for 3A IROSA EVA Space Station Remote Manipulator System (SSRMS) support. The reviewed document is intended to give an overview of the robotics operations for US EVA IROSA 3A and 4A. Also included are the steps to setup DOUG to monitor SSRMS motion during real-time operations. 

EVA Software Review in Dynamic Onboard Ubiquitous Graphics (DOUG):  The crew started and configured DOUG to receive and display real-time SSRMS joint angle telemetry from a Portable Computer System PCS Laptop and to start and configure DOUG without real-time SSRMS joint angle telemetry. 

Completed Task List Activities:

  • None.

Today’s Ground Activities:
All activities are complete unless otherwise noted.

  • Battery Charge/Discharge Unit (BCDU) Firmware Load
  • AdminPC. Weekly maintenance of the network
  • RS MPEG2 Video
  • AMS Operations and Commanding
  • Columbus FSL high rate data downlink

Look Ahead Plan

Saturday, November 19 (GMT 323)
Payloads:

  • Crew Off-Duty

Systems:

  • Crew Off-Duty

Sunday, November 20 (GMT 324)
Payloads:

  • Crew Off-Duty

Systems:

  • Crew Off-Duty

Monday, November 21 (GMT 325)
Payloads:

  • JAXA Media Take 2
  • Neural Integration System
  • Plant Habitat CO2 T/S
  • Standard Measures

Systems:

  • ROBO Procedure Review
  • EVA Procedure Review
  • EVA Procedure Conference
  • Extravehicular Mobility Unit (EMU) Long Life Battery (LLB)/Metal Oxide (METOX) Installation

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • Portable Onboard Computers (POC) DOUG Software Review
  • EVA Tool Configuring
  • RFID Logistics Antenna Check and Secure
  • Transfer Cygnus Cargo Operations
  • Recycle Tank Drain and Fill
  • Robotics Procedure Review
  • Russian EVA Tool Transfer
  • ISS HAM Kenwood Radio Power Up
  • Swap Station Support Computer (SSC) 20 and 12 Swap
  • NanoRacks Module Photography
  • PAO Event in JEM
  • SpaceX-25 Dragon Vehicle Ops CBT
  • Photo/TV EVA Camera Card Transfer – RS CREW
  • Photo TV EVA Camera Battery Charging
  • Urine Transfer System Offload EDV Swap
  • EVA Battery Removal/Installation
  • EVA Battery Operations Terminal Charge Init
  • METOX Regeneration Termination
  • Dragon Cargo Operations Conference and Review