ISS Daily Summary Report – 6/14/2023

Systems:

ISS Roll Out Solar Array (IROSA) 1B Extravehicular Activity (EVA) Preparation Activities: In preparation for Thursday’s IROSA 1B EVA, the crew completed EVA procedure reviews and prints, robotics procedure reviews, and an EVA procedure conference with the ground. The crew also performed Equipment Lock (E-LK) preparation, EVA tool configuration and audit, Pistol Grip Tool (PGT) Battery Installation, and Dynamic Onboard Ubiquitous Graphics (DOUG) Setup. IROSA is a modification to the existing Solar Array Wings (SAWs), providing additional power to the station.

Environmental Health Systems (EHS) On-Orbit Sampling: The crew deployed two Formaldehyde Monitoring Kits (FMKs) in designated sample locations for post-flight analysis of on-orbit formaldehyde levels. The crew also used a Grab Sample Container (GSC) to collect instantaneous air samples for post-flight analysis. Sampling is performed every 45 days.

Completed Task List Activities:

  • Columbus Preparation for SpX-28 Cargo Activities [GMT 164]

Today’s Ground Activities:
All activities are complete unless otherwise noted.

  • MSS Powerup
  • Crew Dragon System Checkout

Look Ahead Plan

Thursday, June 15 (GMT 166)
Payloads:

  • No Utilization Activities

Systems:

  • IROSA 1B Install EVA

Friday, June 16 (GMT 167)
Payloads:

  • CGBA-4 Remove
  • Mochii Vent Clean
  • PK-4 HD Transfer and Prep for D/L
  • Zero-G Oven Remove
  • Z T2 IMTP Ops

Systems:

  • EMU Water Recharge
  • Transfer Cargo Dragon Cargo Operations
  • EVA Debrief
  • Atmosphere Revitalization System Four Bed Carbon Dioxide Scrubber Samples
  • EVA Glove Photos
  • HMS Ultrasound 2 Scan
  • Brine Transfer from EDV to BPA with UTS
  • CB/ISS Crew Conference

Saturday, June 17 (GMT 168)
Payloads & Systems:

  • Crew Off-Duty

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • EHS FMK Deployment Operations
  • EHS GSC Sampling Operations
  • EVA iPad Contingency Procedures preparation
  • RWS Setup
  • EVA Procedures Print
  • Extravehicular Activity Pistol Grip Tool Battery Installation
  • E-LK Preparation
  • PAO Event in JEM
  • EVA Tool Configuring/Audit
  • ISS HAM Kenwood Radio Power Down in Columbus
  • ISS HAM Radio Power Down in Service Module
  • EVA Procedure Review/Conference
  • Robotics EVA Procedure Review
  • OBT ROBoT Conference
  • Flight Director/ISS Crew Conference
  • Russian EDVs Inspect
  • POC DOUG Setup