ISS Daily Summary Report – 04/01/14

Urine Processing Assembly (UPA) Advance Recycle Filter Tank Assembly (ARFTA) Change Out and Shock:  Commander (CDR) Wakata and Flight Enginer (FE)-3 Swanson removed ARFTA serial number (S/N) 1 and installed S/N 2.  Swanson then started a series of activities to shock ARFTA S/N 2 using pretreated water from the Waste and Hygiene Compartment (WHC).  The shock treatment targeted microbial contamination which needed to be addressed before the ARFTA could be used with the UPA.   Following the shock, Swanson swapped the ARFTA tanks to re-install S/N 1.

Burning and Suppression of Solids (BASS)-II Repair: FE-5 Mastracchio completed the BASS-II hardware repair started last Friday. Mastracchio conducted a fan calibration and then placed kapton tape around the outer edge of the BASS-II door, completely sealing the window. Mastracchio completed a fan calibration and conducted airflow readings. Ground teams will analyze the airflow readings against the ones taken prior to the repair last Friday before determining when BASS-II operations can resume. On February 20th, the BASS-II door experienced heat damage when burning a double-sided, 3 mm thick sample in a different flow configuration. The BASS-II investigation examines the burning and extinction characteristics of a wide variety of fuel samples in microgravity. The BASS-II experiment will guide strategies for materials flammability screening for use in spacecraft as well as provide valuable data on solid fuel burning behavior in microgravity. BASS-II results contribute to the combustion computational models used in the design of fire detection and suppression systems in microgravity and on Earth.

Remote Power Controller Module (RPCM) Trips:  There were three RPCM trips overnight. They do not appear to be related.  LA2B-G RPC 1 and LAS62B-A RPC 7 initially appear to be hybrid Field Event Transistor (FET) events.  Initial troubleshooting on these RPCMs was completed. LAD62B-A appears to be an overcurrent event. Teams are meeting to determine follow-on troubleshooting steps for all three RPCM trips.

  • LA2B-G RPC 1 controls the Lab Moderate Temperature Loop (MTL) regenerative 3-way mix valve.  Troubleshooting was performed to close the RPC but it immediately tripped open again.  This was repeated 5 times with the same results.  To control Lab MTL temperatures, Mastracchio manually moved the regen 3-way mix valve to bypass, then the ground pre-emptively commanded the Lab ITCS to dual mode.
  • LAS62B-A RPC 7 controls the Lab MTL Nitrogen Introduction Assembly (NIA). Troubleshooting was performed to close the RPC, but it immediately tripped open again.  This was repeated 5 times with the same results.
  • LAD62B-A RPC 12 controls the Carbon Dioxide Removal Assembly (CDRA) valves for the Lab CDRA.  The Lab CDRA was in Standby at the time of the trip.  No troubleshooting was performed on this RPC today. The next planned operations for the Lab CDRA are this weekend.

Orbital-2 Cygnus Pre-Gather:  The crew continued gathering hardware and foam that will be loaded into Cygnus for disposal. These items are being pre-staged in the Permanent Multipurpose Module (PMM) Endcone.  Orbital-2 is scheduled to arrive in May.

Today’s Planned Tasks

  • Reaction Self Test [Complete]
  • HRF Saliva Ops [Complete]
  • HRF MELFI Insert [Complete]
  • SM ПСС (Caution & Warning Panel) Test [Complete]
  • KHROMATOMASS. Experiment Setup / r/g 5220 [Complete]
  • RSS1,2 Reboot / r/g 1009 [Complete]
  • KHROMATOMASS. Saliva and Blood Collection / r/g 5220 [Complete]
  • Laptop RS1(2) Reboot [Complete]
  • ВКС Laptops Antivirus Scan Check and Status Report / r/g 5201 [Complete]
  • Daily Planning Conference (S-band) [Complete]
  • Recycle tank Changeout [Complete]
  • IFM UPA Shock Part 1 [Complete]
  • TOCA WRM Analysis [Complete]
  • Connecting SM Kurs-P Cables to DC1 port -Y / r/g 1956 [Complete]
  • KHROMATOMASS SPEKTR M. Photography of the Experiment Ops / r/g 5220 [Complete]
  • KHROMATOMASS. Closeout Ops / r/g 5220 [Complete]
  • SHD Daily Questionaire [Complete]
  • IFM UPA Shock Part 2 [Complete]
  • Demating ДС-7А telemetry connectors.  r/g 5202 [Complete]
  • Replacing ДС-7А sensors in Signal-VM system. r/g 5202 [Complete]
  • IFM NOD2OS5 LHA R&R [Complete]
  • IFM NOD3FD2 LHA R&R [Complete]
  • Journal Entry 5
  • IFM UPA Shock Part 3 [Complete]
  • ISS adaptation and orientation [Complete]
  • IFM UPA Shock Part 4 [Complete]
  • CIR Alignment Guide Install [Complete]
  • WRM Condensate Pump Init [In work]
  • 54P Stowage Ops with IMS support IMS / r/g 5106 [Complete]
  • Mating ДС-7А sensor telemetry connectors.  r/g 5202 [Complete]
  • IFM UPA Shock Part 5 [Complete]
  • WHC Piping Retrieval [Complete]
  • Replacing ДС-7А sensors in Signal-VM system – Close-out ops.  r/g 5202 [Complete]
  • СОЖ Maintenance  [Complete]
  • JAXA CM Setup [Complete]
  • JAXA CM Video [Complete]
  • IFM UPA Shock Part 6 [Complete]
  • Photography of Batavia lettuce sample / r/g 5178 [Complete]
  • JAXA CM Closeout[Complete]
  • WRM Condensate Pump Term [Complete]
  • СТТС Configuration for MRM1  [Complete]
  • KAPLYA-2. Active Drop Sampler [АЗК] Functionality Test. r/g 5221 [Complete]
  • IFM UPA Shock Part 7 [Complete]
  • KAPLYA-2. Active Drop Sampler [АЗК] Functionality Test. r/g 5221 [Complete]
  • ISS adaptation and orientation [Complete]
  • IFM UPA Shock Part 8 [Complete]
  • PAO HD Setup [Complete]
  • MSG Facility Activation [Complete]
  • PAO HD Lab Event [Complete]
  • Node 1 Encoder T/S [Complete]
  • ISS Crew Handover [Complete]
  • MRM1 Comm Reconfig [Complete]
  • 24-hour ECG (termination) / r/g 5197
  • Recycle tank Changeout [Complete]
  • ISS adaptation and orientation [Complete]
  • 24-hour ECG Recording (start) / r/g 5197 [Complete]
  • IMS Update [Complete]
  • BASS Repair Part 1 [Complete]
  • Cygnus Pregather [Complete]
  • Deactivation of ТК 712 Gas Analyzer [Complete]
  • Deactivation of ТК 711 Gas Analyzer. [Complete]
  • LHA JPM1OF7 R&R [Complete]
  • EHS TOCA Data Record [Complete]
  • EHS TOCA WWB Changeout [Complete]
  • Intermodular TORU Test with Mated ТКГ 422 (DC1). r/g 5218 [Complete]
  • BASS Repair Part 2 [Complete]
  • MSG Facility Power Down [Complete]
  • VZAIMODEISTVIYE Experiment Run By FE-4 / r/g 4115 [Complete]

Task List

  • ARED Cylinder Evac
  • Dragon ROBOT Self Study [In work]
  • WHC KTO Replace
  • WHC EDV R&R
  • Roscosmos report
  • TK-712 GoPro Remove
  • TK-712 Transfer
  • Econ photo
  • SM Printer Swap [Complete]
  • ARED cycle flywheel reconfig
  • Cygnus pregather
  • Food Warmer Setup
  • HMS Med Kit Photos
  • IFM LHA R&Rs
  • IFM LHA JPM1OF1 R&R [Complete]
  • NORS Prep A/L Reconfig [In work] 

Ground

  • Nominal Commanding

Three-Day Look Ahead:

  • Wednesday, 04/02: ISS Crew Handover & Orientation, EMU Water Sampling, RAM Install
  • Thursday, 04/03: Hybrid Muscle Training, CFE ICF7, PAO, CIR Bottle Replace
  • Friday, 04/04: Petri-light measure, ACE Samp, Hybrid Muscle Training,CDRA R&R Prep, Food Warmer Setup

QUICK ISS Status – Environmental Control Group:

                              Component Status
Elektron Off
Vozdukh Manual
[СКВ] 1 – SM Air Conditioner System (“SKV1”) On
[СКВ] 2 – SM Air Conditioner System (“SKV2”) Off
Carbon Dioxide Removal Assembly (CDRA) Lab Standby
Carbon Dioxide Removal Assembly (CDRA) Node 3 Operate
Major Constituent Analyzer (MCA) Lab Off
Major Constituent Analyzer (MCA) Node 3 Operate
Oxygen Generation Assembly (OGA) Process
Urine Processing Assembly (UPA) Standby
Trace Contaminant Control System (TCCS) Lab Off
Trace Contaminant Control System (TCCS) Node 3 Full up