Double Cold Bag (DCB) Packing: ISS CDR Swanson and FE-1 Skvortsov packed six DCBs with conditioned science samples for return on SpaceX-3.
SpaceX-3 Departure Preparations: Swanson completed the final SpaceX-3 cargo loading. He then completed the SpaceX-3 egress and vestibule closeout procedures, including installation of the Common Berthing Mechanism (CBM) Controller Panel Assemblies (CPAs). Finally, he configured the Robotics Work Station (RWS) cameras. SpaceX-3 unberth is scheduled at 6:40am CDT tomorrow with release scheduled at 8:26am CDT.
CBM Bolt 3-1 Checkout: After Swanson installed the CBM CPAs, the ground team checked out CBM Bolt 3-1, which had failed during SpaceX-3 berthing operations and was subsequently changed out. The bolt was fully retracted to confirm the initial configuration. It was then driven and retracted to verify nominal operation. Bolt 3-1 will be masked to support SpaceX-3 demate.
Today’s Planned Tasks
- SM Caution and Warning Panel (ПСС) [Complete]
- Laptop RS1(2) reboot [Complete]
- RSS1,2 reboot r/g 1009 [Complete]
- Daily Planning Conference (S-band) [Complete]
- Double Cold Bag Procedure review for Dragon [Complete]
- OTKLIK. Installation area prep. Tagup with specialist r/g 5654 [Complete]
- Double Cold Bag Packing to Dragon [Complete]
- BLB – Checking Biolab Laptop Connection
- DRAGON Transfer Ops [Complete]
- СОЖ Maintenance [Complete]
- Dragon Egress [Complete]
- Telephone conference with “Russian Cosmos” magazine editor / r/g 5669 [Complete]
- Dragon – Hatch Closure [Complete]
- Dragon Vestibule Configuration for Demate [Complete]
- CPA installation [Complete]
- Connecting DCP Power Cable for RWS in Cupola and LAB [Complete]
- Camera Setup to View LAB Remote (RWS) Monitor 3 [Complete]
- CGBA-4 Powerdown [Complete]
- CGBA-6 Powerdown [Complete]
- Daily Planning Conference (S-band) [Complete]
- VEG – Daily Plant Check [Complete]
- Video recording for Roscosmos TV studio / r/g 5667
- USOS Window Shutter Close
Task List
- ARED Cylinder Evac
- WHC EDV-U R&R
- Roscosmos Report
- Test Operation of МИС on ISS RS
- Ekon Photo
- CTB 1048 Relocate
- Dragon Temp Logger Find [In work]
- 3DA1-Cam-Ops
- EMU 3005 Photos
- EMU LLB Auto-Init
- EMU LLB SSC Relocate
- EMU LLB SSC Return
- EVA ORU Bag Inspection
- MOOT restow
- NOD1OS2-LHA R&R
- NOD1PD2-LHA R&R
- PEP Inspection
- WHC UR/IF R&R
- KTO EDV Audit
- NOD3 PEPS assessment
- P/TV Hardware questions
- POSSUM PL Photo
- Viable Crew OBT
- Viable PL Photo
- Viable PL Touch
- WMRS MRF Remove
Ground
- Nominal commanding
- SpaceX-3 configuration for unberth [Complete]
- CBM CPA checkout and Bolt 3-1 verification [Complete]
Three-Day Look Ahead:
- Sunday, 05/18: Dragon release 8:26am CDT
- Monday, 05/19: Crew off duty, Resist Tubule MELFI insert, RADIN
- Tuesday, 05/20: OGA H2 sensor R&R, SpaceX-3 debrief, MELFI Ice brick install
QUICK ISS Status – Environmental Control Group:
Component | Status |
Elektron | On |
Vozdukh | Manual |
[СКВ] 1 – SM Air Conditioner System (“SKV1”) | Off |
[СКВ] 2 – SM Air Conditioner System (“SKV2”) | Off |
Carbon Dioxide Removal Assembly (CDRA) Lab | Standby |
Carbon Dioxide Removal Assembly (CDRA) Node 3 | Standby |
Major Constituent Analyzer (MCA) Lab | Stop |
Major Constituent Analyzer (MCA) Node 3 | Operate |
Oxygen Generation Assembly (OGA) | Standby |
Urine Processing Assembly (UPA) | Standby |
Trace Contaminant Control System (TCCS) Lab | Off |
Trace Contaminant Control System (TCCS) Node 3 | Full up |