ISS Daily Summary Report – 10/15/14

Extravehicular Activity (EVA) 28:  Wiseman and Wilmore completed EVA 28 today.  Hatch opening was on time at 7:15am CDT and the EVA was completed with a planned Phased Elapsed Time (PET) of 6 hours and 35 minutes.  All primary objectives were successfully completed as follows:

  • Sequential Shunt Unit (SSU) 3A Remove and Replace (R&R)
  • Articulating Portable Foot Restraint (APFR) Tool Stanchion (TS) Relocation
  • Degraded ETVCG Removal from Camera Port (CP)7
  • WETA Relocation from CP8 to CP11
  • New ETVCG installation onto CP8

European Modular Cultivation System (EMCS) Checkout:  Gerst performed a checkout of the EMCS Belt/Pulley system. He checked and photographed the EMCS Rotor Belts/Pulleys in preparation for a future payload.

Today’s Planned Activities

All activities were completed unless otherwise noted.

  • Check position of MRM2 manual Circuit Breakers [АЗС] on DC БВП and status of Fuses on БПП-30, БПП-36, БПП-4, БПП-7 Fuse Boxes
  • Comm & CUCU config before EVA
  • EVA In-Suit Light Exercise (ISLE) Preparation
  • Vozdukh Deactivation
  • CASKAD. Manual Mixing in Bioreactor
  • Filling (separation) EDV (KOB) for Elektron from EDV-RP No.1139 (00062675R,ФГБ1ПГО_1_107)
  • Removal of ЛКТ (ТА251МБ) and ROM from ТКГ 423 (DC1).
  • Communication Check between КЦП1 and RS1
  • Oxygen Supply System Reconfig to Initial
  • EMU Prep for EVA
  • Prebreathe in EMU
  • Switching over SM KURS-P cables to DC1 -Y port Antenna Feeder. (VHF)
  • Crew Lock Depress
  • Crew Lock Egress
  • SSU – R&R
  • DRAGON Transfer Ops
  • APRF/ TS – Relocation
  • ТКГ 423 Stowage Completion Status (DC1)
  • CP07 ETVCG/VSSA –  Removal
  • Installation of ТКГ 423 (DC1) Docking Mechanism
  • VSSA/WETA – Relocation
  • Video Footage of Greetings
  • CP8 ETVCG –  Installation
  • PMM – Get-Ahead
  • Crew Lock Ingress
  • CASKAD. Manual Mixing in Bioreactor
  • Crew Lock Repress
  • EVA Glove Photo Downlink
  • Vozdukh Atmosphere Purification System [СОА] Activation

Completed Task List Items

  • None

Ground Activities

All activities were completed unless otherwise noted.

  • System commanding in support of EVA 28

Three-Day Look Ahead:

  • Thursday, 10/16: EVA Debrief, EVA Deconfig, OGA H2 Sensor R&R, NanoRacks activities
  • Friday, 10/17: Dragon Departure review and cargo ops, RS EVA Tool prep, NanoRack Mod 19, CPCG transfer
  • Saturday, 10/18: Dragon RoBOT OBT and cargo ops, CUCU CCP setup, MELFI to Glacier sample transfer, MICRO Gap 8

QUICK ISS Status – Environmental Control Group:

                              Component

Status

Elektron

On

Vozdukh

On

[СКВ] 1 – SM Air Conditioner System (“SKV1”)

Off

[СКВ] 2 – SM Air Conditioner System (“SKV2”)

Off

Carbon Dioxide Removal Assembly (CDRA) Lab

Standby

Carbon Dioxide Removal Assembly (CDRA) Node 3

Startup

Major Constituent Analyzer (MCA) Lab

Stop

Major Constituent Analyzer (MCA) Node 3

Operate

Oxygen Generation Assembly (OGA)

Standby

Urine Processing Assembly (UPA)

Standby

Trace Contaminant Control System (TCCS) Lab

Off

Trace Contaminant Control System (TCCS) Node 3

Full up