Japanese Experiment Module (JEM) Airlock Pressurization and Leak Check: Kelly opened the JEM Airlock inner hatch and extended the Slide Table into the JEM. Peake then removed Cyclops from the Slide Table and stowed it for future use.
Russian Pilot-T Experiment: Kelly performed a session of the Russian experiment Pilot-T today. The goal of Pilot-T is to improve methods and develop equipment to assess and predict crewmember performance reliability during the execution of complex operator tasks (such as piloting a space vehicle or controlling transport and robotic equipment on the surface of a spacecraft) during various stages of long-term spaceflight.
Education Payload Operation (EPO): Peake recorded a video message encouraging and inspiring pupils and schools that are taking part in the Education Resource Office – United Kingdom (ESERO-UK) Primary School Project. The recording is part of the European Space Agency’s (ESA) Principia mission to support education activities for 500 primary schools around the UK.
Reaction Self Test: Kelly and Kornienko completed sessions today for the Reaction Self Test investigation after they woke in the morning and prior to their sleep period. Reaction Self Test helps crewmembers objectively identify when their performance capability is degraded by various fatigue-related conditions that can occur as a result of ISS operations and time in space (e.g., acute and chronic sleep restriction, slam shifts, extravehicular activity (EVA), and residual sedation from sleep medications).
Orbital ATK (OA)-4 Cargo Operations: The crew transferred trash into the Cygnus vehicle today. An estimated 6 hours remain to complete the trash loading. Cygnus is scheduled to unberth from ISS on February 19th.
Special Purpose Dexterous Manipulator (SPDM) Main Bus Switching Unit (MBSU) Demonstration: Today is the second day of 3 days of activities designed to validate robotic transfer of battery style Orbital Replacement Units (ORUs) prior to the delivery of new ISS batteries on HTV-6. A successful demonstration will allow planners to reduce the number of EVAs to install the batteries. Yesterday’s activities to move the MBSU Flight Releasable Attachment Mechanism (FRAM) to Enhanced ORU Temporary Platform (EOTP) side 2 were successful. However ground controllers were unable to use the ORU Tool Changeout Mechanism (OTCM) to grasp the Right-hand Off-Set Tool (ROST) so the MBSU secondary bolt operations were completed using the OTCM. Today the ground will remove the MBSU from the FRAM structure and temporarily stow the MBSU on EOTP side 3 before returning the MBSU back to the FRAM. Tomorrow the demonstration will conclude when the MBSU FRAM is moved back to its home on Express Logistics Carrier 2.
Today’s Planned Activities
All activities were completed unless otherwise noted.
- ISS crew and ГОГУ (RSA Flight Control Management Team) weekly conference
- JEMAL – Slide Table extension
- CYCLOPS – Experiment Ops
- Operations with EXPOSE-R P/L, “Test” Air Tight Containers, and [СКК] containers after EVA-42
- PILOT-T. Preparation for the experiment
- JEM Airlock (JEM AL) Troubleshooting Preparation
- PILOT-T. Experiment Ops
- CYCLOPS – Experiment Ops
- JEM Airlock (JEM AL) Troubleshooting Closeout
- Fine Motor Skills – Test
- JEMAL – Slide Table Retraction
- Tagup after EVA-42
- EPO – Recording Project
- Soyuz 718 Samsung Tablet Recharge – Initiate
- PILOT-T. Experiment Ops
- Psychological Evaluation Program (WinSCAT)
- Food Frequency Questionnaire
- Stow Earlier Installed Formaldehyde Monitoring Kit (FMK)
- Log out of SSC12 in preparation for remote Radiation Detector ops by the ground
- PILOT-T. Closeout Ops
- Orlan-MK Equipment Pre-pack for Stowage and Disposal after EVA
- On MCC GO ТКГ 429 and ПрК Interface Leak Check
- CIR – Upper Rack Doors Open
- CIR – Hardware Removal and Relocation
- Food Frequency Questionnaire
- IMS Tagup
- Removal of Portable Repress Tank (БНП) No.17 from SM [РО] and stowage
- EVA Video Data Downlink from Glisser-M CIR – Hardware Removal and Relocation
- VEG-01 – Plants Photo
- Soyuz 718 Samsung Tablet Recharge – terminate
- CIR – Upper Rack Doors Close
- ПрК-СУ Hatch Opening
- HABIT – Experiment Ops
- EPO – Experiment Ops
- On MCC GO ТГК-СУ Hatch Opening
- Installation of Quick Release Screw Clamps on SM Aft side
- Progress 429 (SM Aft) Deactivation, Air Duct Installation
- EXPOSE-R. Cable Demate
- PAO Event with a 1 Year Mission crew
- EPO Hardware Stow
- СОЖ Maintenance
- SHD – Weekly Questionnaire
- Reaction Self-Test (Sleep)
Completed Task List Items
- PDH2 T/S Setup
- SSC10 Shell Swap
Ground Activities
All activities were completed unless otherwise noted.
- Nominal System Commanding
- SPDM MBSU Demo Day 2
Three-Day Look Ahead:
Saturday, 02/06: Weekly Cleaning, Crew Off Duty, SPDM MBSU Demo Day 3
Sunday, 02/07: Crew off Duty
Monday, 02/08: Ocular Health, ELF QD Troubleshooting, BASS-M, EMU Swap, Cargo Ops, FPS Procedure Review, MT Translate to WS-4
QUICK ISS Status – Environmental Control Group:
Component | Status |
Elektron | Off |
Vozdukh | Manual |
[СКВ] 1 – SM Air Conditioner System (“SKV1”) | Off |
[СКВ] 2 – SM Air Conditioner System (“SKV2”) | On |
Carbon Dioxide Removal Assembly (CDRA) Lab | Override |
Carbon Dioxide Removal Assembly (CDRA) Node 3 | Operate |
Major Constituent Analyzer (MCA) Lab | Idle |
Major Constituent Analyzer (MCA) Node 3 | Operate |
Oxygen Generation Assembly (OGA) | Process |
Urine Processing Assembly (UPA) | Standby |
Trace Contaminant Control System (TCCS) Lab | Full Up |
Trace Contaminant Control System (TCCS) Node 3 | Off |