ISS Daily Summary Report – 1/13/2017

Extravehicular Activity (EVA) #39: Kimbrough and Pesquet opened the Joint Airlock external hatch at 5:22 am CST in order to perform US EVA #39 (Lithium Ion Battery Remove & Replace (R&R) EVA #2). The EVA installs adapter plates and relocates Channel 1A Nickel Hydride (NiH2) batteries to complete the installation of the new Lithium Ion batteries. The primary objectives for the EVA are as follows:

  • Retrieve Adapter Plate E and F from the Express Pallet (EP)
  • Install Adapter Plate F in Slot 6
  • Relocate Battery 4 to Adapter Plate F
  • Install Adapter Plate E in Slot 4
  • Retrieve and Install Adapter Plate D in Slot 2
  • Fasten H1 Bolts on Li-Ion Batteries in Slots 1 and 5

The crew ingressed the airlock with a final Phase Elapsed Time (PET) for the EVA of  05:58 hours.  In addition to the primary objectives, all get-ahead tasks were also completed as follows:

  • Node 3 Shields Bundle #3 Temp Stow
  • Mobile Transporter Relay Assembly (MTRA) Camera Light Pan and Tilt Assembly (CLPA) Swap
  • Latching End Effector (LEE) A Worksite Interface Fixture (WIF) Adapter R&R
  • S0 aft to Z1 forward (Rat’s Nest) Photo Mapping
  • Secure Solar Array Blanket Boxes (SABB) Restraints
  • Relocate Shields Bundle #2 to Node 3

Channel 1A batteries have been activated and are healthy.

Today’s Planned Activities
All activities were completed unless otherwise noted.

  • RELAKSATSIYA. Hardware Setup.
  • EVA COTS UHF Communication Unit (CUCU) 
  • USOS Window Shutter Close
  • Extravehicular Activity (EVA) In-Suit Light Exercise (ISLE) Preparation
  • ISS crew and ГОГУ (RSA Flight Control Management Team) weekly conference
  • RELAKSATSIYA. Parameter Settings Adjustment.
  • БД-2 Kits Inventory Audit
  • RELAKSATSIYA. Observation
  • RELAKSATSIYA. Closeout Ops and Hardware Removal.
  • Extravehicular Mobility Unit (EMU) Purge
  • Extravehicular Mobility Unit (EMU) In-Suit Light Exercise (ISLE) Prebreathe
  • Hardware stowage for disposal in Progress 433 (DC1) and IMS updates
  • TIMER. Battery Charge
  • Crewlock Depress
  • Crewlock Post Depress
  • Crewlock Egress
  • T2 Ethernet Check
  • СОЖ maintenance
  • S4 Battery R&R 1A Worksite Preparation
  • S4 Battery R&R Battery Adapter Plates Retrieval
  • S4 Battery R&R Battery Adapter Plate F Installation
  • Audit of FGB interior panel latches
  • Hardware stowage for disposal in Progress 433 (DC1) and IMS updates
  • S4 Battery R&R 1A Battery  4 Relocate
  • S4 Battery R&R Battery Adapter Plate E Installation
  • TIMER. Experiment setup and initiation of video recording
  • S4 Battery R&R Battery Adapter Plate D Retrival & Installation
  • VIZIR. Experiment Ops.
  • US EVA, Cleanup and Crewlock Ingress
  • TIMER. Experiment Ops Video Termination and Cleanup
  • EVA Get-Ahead Tasks
  • EVA Glove Photo Setup
  • A/L Ingress
  • Delta file prep
  • Crewlock Repress
  • Extravehicular Activity (EVA) Crewlock Repress EVA PET end
  • FLUID SHIFTS Big Picture Overview
  • Extra Vehicular Activity (EVA) Post-EVA Activities
  • Return to nominal comm configuration after US EVA
  • EVA Glove Photo Downlink
  • Photo/TV Extravehicular Activity (EVA) Camera Disassembly
  • Photo/TV Extravehicular Activity (EVA) GoPro Downlink

Completed Task List Items

  • EVA NOD3 Shield Pack
  • EVA Tool Config
  • MSG-MLC Power Check
  • SSC17 Check

Ground Activities
All activities were completed unless otherwise noted.

  • Channel 1A Battery activation and checkout
  • Untie Channel 1A and 1B

Three-Day Look Ahead:

  • Saturday, 01/14: EVA Debrief, EVA Camera Disassembly, Airlock Deconfig, EMU Recharge
  • Sunday, 01/15: Crew Off Duty
  • Monday, 01/16: Capillary Flow, Fluid Shifts, SPHERES Dry Run, JSSOD Satellite Deploy, Galley Power Supply, EVA Tool Stow

QUICK ISS Status – Environmental Control Group:

    Component

Status

Elektron

On

Vozdukh

Manual

[СКВ] 1 – SM Air Conditioner System (“SKV1”)

Off         

[СКВ] 2 – SM Air Conditioner System (“SKV2”)

On

Carbon Dioxide Removal Assembly (CDRA) Lab

Standby

Carbon Dioxide Removal Assembly (CDRA) Node 3

Operate

Major Constituent Analyzer (MCA) Lab

Operate

Major Constituent Analyzer (MCA) Node 3

Idle

Oxygen Generation Assembly (OGA)

Process

Urine Processing Assembly (UPA)

Standby

Trace Contaminant Control System (TCCS) Lab

Off

Trace Contaminant Control System (TCCS) Node 3

Full Up