ISS Daily Summary Report – 12/18/2017

Lighting Effects: Upon wakeup, the 52S subject provided a daily sleep log entry to track his sleep patterns and wakefulness. This entry supports a two week long sleep shift session that began GMT 340 and ends tomorrow. The Lighting Effects investigation studies the impact of the change from fluorescent light bulbs to solid-state light-emitting diodes (LEDs) with adjustable intensity and color and aims to determine if the new lights can improve crew circadian rhythms, sleep, and cognitive performance. Results from this investigation also have major implications for people on Earth who use electric lights.

Zebrafish Muscle 2 Operations: Following the successful arrival of SpaceX-13, the crew performed the first day of Zebrafish activities by retrieving six Zebrafish experiment units (EUs) from the Zebrafish transport bags and dividing them into 3 groups (A, B, and C). Each group contains two Zebrafish EUs. The crew then conducted the fixation for the EUs of Group A and placed them into Minus Eighty Degree Celsius Laboratory Freezer for ISS (MELFI).  The EUs for Group B were then stowed in the Cell Biology Experiment Facility (CBEF) 1G centrifuge and Group C was stowed in the CBEF Micro-G centrifuge. The results from today and next three days of Zebrafish Muscle 2 operations will help to determine whether atrophy of muscles under microgravity also occurs in zebrafish, and why that muscle atrophy occurs in microgravity. Physical exercise and control of posture are important for maintaining muscle mass and strength. In microgravity conditions, the postural, known as anti-gravity muscles, undergo atrophy because of prominent decrease in their gravity-dependent activity.

TangoLab-1 and 2 Payload Card Placement: The crew performed several payload card placements into both of the TangoLab-1 & 2 facilities. The crew placed two of the payload cards that arrived on SpaceX-13 into slots 2 and 3 of the TangoLab-1.  The payload in slot 6 of TangoLab-2 will be moved to slot 1 of TangoLab-1. The TangoLab-1 and TangoLab-2 lockers are reconfigurable general research facilities designed for microgravity research and development (R&D) and pilot manufacturing aboard the International Space Station (ISS). TangoLab-2 is similar to TangoLab-1 with the primary difference being an upgraded fan system which allows for a greater heat rejection capability. This upgrade enables payloads with greater power draw and lower temperature requirements to use the facility.

Cell Science Validation Locker (Bioculture System) Installation: The Bioculture System was removed from the SpX-13 vehicle and installed into EXPRESS Rack 7 of the ISS by the crew. The Bioculture System is a space biological science incubator for use on the International Space Station (ISS), with the capability of transporting active and stored experiments to ISS. This incubator supports a wide diversity of tissue, cell, and microbiological cultures and experiment methods to meet any space flight research experiment goals and objectives.  The facility enables variable duration and long-duration cellular and microbiological experiments on ISS to meet the scientific needs of academic and biotechnology interests. 

Dragon Cargo Transfers:  The crew continued with cargo transfers from the Dragon Center Stack.  In addition, the Double Coldbags were retrieved and unpacked.  Eight Double Coldbags were unpacked into Space Automated Bioproduct Laboratory (SABL), MELFI, JAXA Freezer-Refrigerator Of STirling cycle 2 (J-FROST2), General Laboratory Active Cryogenic ISS Experiment Refrigerator (Glacier) and ambient locations.  After the science was removed from the Double Coldbags, the Ice Bricks and Double Coldbags were temp stowed to dry out. 

Today’s Planned Activities
All activities are complete unless otherwise noted.

  • Lighting Effects Sleep Log Entry – Subject
  • On MCC GO БМП Ф1 absorption cartridge regeneration (start)
  • Transfer Center Stack
  • URAGAN. Observation and photography using still photo equipment
  • ALGOMETRIA. Measurement Prep & Ops in the strain-gauge and thermal algometry modes.
  • Dragon Unpack Assist
  • Bioculture System, Transfer, and EXPRESS Rack Install
  • Dragon Locker Removal
  • Crew will retreive CTB items from Dragon
  • Multi Omics FOS Stow
  • Tightening QD Screw Clamps between DC1 and Progress 437
  • Zebrafish Muscle2 Item Gathering
  • Review TV Coverage procedure Hatch Opening from MRM1 and Arrival of Expedition 54.
  • Video Shooting and Setup of Zebrafish Muscle2 Containers
  • Activation of СКВ2 with Disconnected 59Ю=A14 Cncntr.
  • Cold Stowage Double Coldbag Unpack
  • On MCC Go ISS O2 Repress from Progress 436 [AO] СРПК Section 1, start
  • Fixation of Zebrafish Muscle 2 samples
  • On MCC Go ISS O2 Repress from Progress 436 [AO] СрПК Section 1, terminate
  • ALGOMETRIA. Strain Measurements Mode
  • СОЖ maintenance
  • Delta file prep
  • Zebrafish Muscle2 MELFI Insertion
  • Arriving crew quarters outfitting
  • Metal Oxide (METOX) Regeneration Termination
  • TangoLab-2 Card Cube Replace
  • ISS HAM Radio and Video Power Down in Columbus
  • ISS HAM Radio Power Down in Service Module
  • TangoLab-1 Card Cube Replace
  • Rodent Research Transfer Review
  • ALGOMETRIA. Conducting measurements in tenso- and thermo-algometry mode. Closeout Ops
  • Dragon Cargo Operations Conference
  • USOS Window Shutter Close
  • On MCC GO БМП Ф1 absorption cartridge regeneration (end)
  • Rodent Research Crew Conference
  • Closing of SM windows

Completed Task List Activities

  • None

Ground Activities
All activities are complete unless otherwise noted.

  • Standard commanding

Three-Day Look Ahead:

  • Tuesday, 12/19: 51S Docking, ISS Safety Brief, RR Transfer, BRIC LED, Space Headaches
  • Wednesday, 12/20: Arthrospira, SABL2, Synthetic Bone, 52S Emer Drill, Zebra, RR, Ram Deploy, APEX5, Marrow-2
  • Thursday, 12/21: EMER Role & Resp Review, Zebra, Synthetic Bone, STP-H5, Dragon Emer OBT, APEX-5, Root Growth 

QUICK ISS Status – Environmental Control Group:

Component

Status

Elektron

On

Vozdukh

Manual

[СКВ] 1 – SM Air Conditioner System (“SKV1”)

On

[СКВ] 2 – SM Air Conditioner System (“SKV2”)

Off

Carbon Dioxide Removal Assembly (CDRA) Lab

Standby

Carbon Dioxide Removal Assembly (CDRA) Node 3

Operate

Major Constituent Analyzer (MCA) Lab

Idle

Major Constituent Analyzer (MCA) Node 3

Operate

Oxygen Generation Assembly (OGA)

Process

Urine Processing Assembly (UPA)

Reprocess

Trace Contaminant Control System (TCCS) Lab

Full Up

Trace Contaminant Control System (TCCS) Node 3

Off