ISS Daily Summary Report – 3/07/2018

Airway Monitoring:  In support of the European Space Agency (ESA) Airway Monitoring investigation, today the crew completed calibration of the hardware in the US Laboratory and then completed two different measurement protocols; the low Nitric Oxide (NO) protocol which determines how much NO is exhaled with respiration, and the high NO protocol, which determines how much NO is diffused into the blood. The ISS provides a unique environment, allowing these measurements to be taken in weightless, hypobaric and hypoxic conditions. With dust particles present in the ISS atmosphere, this investigation studies indicators of airway inflammation in crewmembers, using ultra-sensitive gas analyzers to analyze NO in exhaled air. This will help to identify potential health impacts and support maintenance of crewmember health during future human spaceflight missions, where crewmembers will have to be more self-sufficient in identifying and avoiding conditions that may result in airway inflammation. 

Public Affairs Office (PAO) Educational Imagery Recording: Today the crew recorded a video to explain the importance of Earth observation from space and how the International Space Station is a global observation and diagnosis station.  This video will be one of a series of videos referred to as STEMonstrations, education videos conducted by crewmembers aboard the space station that will be used for educational products, NASA TV, and social media applications. 

Earth Imagery from ISS Target (EIISS): Today the crew captured images of the continental USA from coast to coast.  EIISS captures a series of videos showcasing targets around the world as seen from the ISS. These videos will be integrated into a product for later release.

Treadmill 2 (T2) Six-Month Maintenance: Today the crew completed the 6-month T2 inspection. During this task, the crew inspects the treadbelt slats and screws, cleans the treadmill drive shaft, greases forward and rear axles, vacuums inside the rack and around the treadmill, and inspects the bungee shackle key mount witness marks.  This is nominal periodic corrective maintenance.  An unmanned activation and checkout was completed.  Engineering reviewed the data from this checkout and T2 is a Go for operations.

Acoustic Monitor Recoding of T2 Audio: Today the crew also performed Acoustic Monitor recording of the unmanned activation and checkout protocol that is performed prior to and immediately following the T2 six-month maintenance. Two Acoustic Monitors were used to record audio of the T2 at each tread speed. 

Airlock Bacteria Filter Remove and Replace (R&R): As part of routine ISS maintenance, the crew removed and replaced three expended Airlock Bacteria Filters located in the Aft Deck Standoff and clean the IMV Air Return screens of the Airlock Duct Selector Panel.

Solid State Lighting Assembly (SSLA) Installation:  Today, the crew installed two SSLAs into the US Airlock. The SSLAs were designed to replace General Luminaire Assemblies (GLAs) to improve visual acuity and to provide a crew health countermeasure for circadian rhythms, sleep, alertness and performance. To accomplish these goals, SSLAs are designed to operate in 3 modes with 3 distinct spectrum. The different spectrum provide control of the blue portion of the light which impacts melatonin production in humans which impacts sleep. 

Minus Eighty-Degree Laboratory Freezer for ISS (MELFI) 1 Autostop: This morning MELFI 1 went into autostop. A power cycle was unsuccessful in recovering the unit. The crew transferred the contents of MELFI 1 to other cold stowage assets to allow the team time to review the signature and develop a forward plan. After transfers were completed, an additional power cycle of the unit was successful in recovering the Electronics Unit (EU). Dewar 3 is showing an invalid configuration and the Brayton motor remains powered off. Teams are investigating. 

Today’s Planned Activities
All activities are complete unless otherwise noted.

  • Changeout of Replaceable Condensate Removal Lines [СМОК].
  • Photo/TV  (P/TV) Airway Monitoring Video Setup
  • Bacteria Filter Spring Realignment
  • Calibrations, Low NO and High NO measurements
  • Earth Imagery from ISS Nikon Target Operations
  • Light Installation at A/L1A3 (Crewlock Aft) location.
  • Public Affairs Office (PAO) Educational  Imagery Recording
  • EHS Acoustic Monitor Pre-Maintenance Speed Characterization
  • Ultrasounds Vein Press Check
  • Replacement of EDV collector and adapter in SVO-ZV
  • AIRMON Power off and Stow
  • СОЖ maintenance
  • Treadmill 2 (T2) 6 Month Maintenance
  • IMS Update
  • Airway Monitoring Video Stow
  • MELFI 3 Ice Brick Insert 7
  • Atmosphere Control and Supply (ACS) Oxygen Manual Valve Open
  • In Flight maintenance (IFM) Airlock Bacteria Filter Remove & Replace
  • Photo/TV Treadmill 2 (T2) Activation and Checkout (ACO) Video Setup
  • Treadmill 2 (T2) Unmanned Activation and Checkout (ACO)
  • EHS Acoustic Monitor T2 Data Transfer and Stow
  • Photo/TV Treadmill 2 (T2) Activation and Checkout (ACO) Video Teardown
  • Light Installation at A/L1F3 (Crewlock Forward) location.
  • Draining Water from ЕДВ
  • ISS HAM Service Module Pass
  • VEG-03 Dual Facility Watering for each Plant Pillow

Completed Task List Activities

  • None 

Ground Activities
All activities are complete unless otherwise noted.

  • Solar Array Voltage Maximum Power
  • SPDM Unstow
  • SPDM Lee Survey
  • Standard Commanding

Three-Day Look Ahead:

  • Thursday, 03/08: COL Smoke Detector Cleaning, ACME Hardware R&R, HV5 Server Deploy, VEG-03 Harvest, EIISS Ops
  • Friday, 03/09: ELF Ops, FIR ACE Module Changeout, C2V2 Cable Swap, Max CEVIS, Veg-03, LLB Charging
  • Saturday, 03/10: Housekeeping, Crew Off-Duty

QUICK ISS Status – Environmental Control Group:

Component

Status

Elektron

Off

Vozdukh

Manual

[СКВ] 1 – SM Air Conditioner System (“SKV1”)

On

[СКВ] 2 – SM Air Conditioner System (“SKV2”)

Off

Carbon Dioxide Removal Assembly (CDRA) Lab

Standby

Carbon Dioxide Removal Assembly (CDRA) Node 3

Operate

Major Constituent Analyzer (MCA) Lab

Idle

Major Constituent Analyzer (MCA) Node 3

Operate

Oxygen Generation Assembly (OGA)

Process

Urine Processing Assembly (UPA)

Standby

Trace Contaminant Control System (TCCS) Lab

Full Up

Trace Contaminant Control System (TCCS) Node 3

Off