ISS Daily Summary Report – 7/24/2018

Rodent Research-7 (RR-7): The crew completed the first of two days of rodent operations for the RR-7 investigation today. Crewmembers performed bone densitometer scans, blood draws, fecal pellet collections, and sampling operations.  RR-7 examines how the space environment affects the community of microorganisms in the gastrointestinal tract of mice (also known as the microbiota). It also looks at microgravity’s effects on multiple physiological systems known to be affected by the microbiota, including the gastrointestinal, immune, metabolic, circadian, and sleep systems. These studies should help explain mechanisms underlying interactions between these systems and the role of the microbiota in these interactions. 

Exposed Experiment Handrail Attachment Mechanism (ExHAM) #1: Tonight robotic specialists in Tsukuba will use the Japanese Experiment Module Remote Manipulator System (JEMRMS) with the Small Fine Arm (SFA) to transfer the Handhold Experiment Platform (HXP) from the JEM Airlock Slide Table to the JEM Exposed Facility handrail. 

Treadmill 2 (T2) Status: This morning, the crew replaced the T2 Station Support Computer (SSC) and the ground team configured it for T2 use.  The subsequent rack activation was nominal and T2 is now operational and ‘Go’ for the crew’s use. 

Dragon Cargo Ops: Today the crew completed approximately four hours of cargo operations as they continued to pack and load items slated for return on the SpaceX-15 Dragon vehicle. Only a few steps remain in the current Cargo Message and specialists hope to upload the next message tomorrow. An estimated fifteen hours of activities remain to finish loading the vehicle prior to the planned departure date of 3 August.  

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • Rodent Research Node 2 Camcorder Video Setup
  • Rodent Research Animal Transfer
  • Rodent Research Dissection 1A
  • PK-4 Video Monitor Installation
  • Verification of ИП-1 Flow Sensor Position
  • PAO hardware setup in COL. Audi/Video check with Glavny
  • Rodent Research Bone Densitometer Scan
  • Crew Prep for PAO
  • TV Conference with the participants of International Youth Science School in COL
  • Rodent Research Dissection 1B
  • PK-4 Video Monitor Checkout
  • SEPARATSIYA. Recovery of [ВН-1] vacuum pump in СРВ-У-РС
  • PK-4 Gas Connection Check
  • Rodent Research MELFI Insert 1
  • Photo T/V (P/TV) Advanced Resistive Exercise Device (ARED) Exercise Video Setup
  • Rodent Research MELFI Insert
  • Rodent Research Bone Densitometer Scan
  • Rodent Research Dissection 1B
  • Rodent Research MELFI Insert 1
  • Photo T/V (P/TV) Advanced Resistive Exercise Device (ARED) Exercise Video Stow
  • Replacement of storage battery 800А module No.2 (A102), No.4 (A104).
  • Rodent Research MELFI Insert
  • Rodent Research Bone Densitometer Scan
  • Rodent Research Dissection 1B
  • Telescience Resource Kit Laptop Setup
  • SM Internal Wireless Instrumentation System (IWIS) Remote Sensing Unit (RSU) s/n 1027 antenna/power chain check and power cycle
  • Polar Desiccant Swap
  • File retrieval of the Sample 8 Re-Run
  • Rodent Research Centrifuge Setup
  • Rodent Research Centrifuge Configure
  • Rodent Research Hand Over
  • Rodent Research MELFI Insert
  • HRF Centrifuge Spin Conclude
  • Rodent Research Dissection 2A
  • Rodent Research Bone Densitometer Scan
  • Troubleshooting EVA Support Panel ПОВ-2 failure to deactivate in DC1 when pressing OFF/ОТКЛ key. 
  • Rodent Research Dissection 2B
  • Polar Desiccant Swap
  • Plant Habitat-01 Glacier to MELFI Sample Transfer #3
  • СТТС Configuration for MRM1
  • Cleaning fan screens on FGB interior panels 116, 231, 316, 431.
  • SEPARATSIYA. Distillation in auto (manual) mode.
  • Rodent Research MELFI Insert
  • Rodent Research Bone Densitometer Scan
  • Rodent Research Animal Transfer 2
  • Rodent Research MELFI Insert
  • Rodent Research Dissection 2B
  • Comm reconfig for nominal ops
  • INTERACTION-2. Experiment Ops
  • Rodent Research MELFI Insert
  • Rodent Research Centrifuge Configure
  • HRF Centrifuge Spin Conclude Final
  • Rodent Research MELFI Insert 3 

Completed Task List Activities:

  • STCE-2 CTB Audit

Ground Activities:
All activities are complete unless otherwise noted.

  • Lab MCA Zero Calibration
  • Amine Swingbed Startup
  • Lab CDRA Half Cycle time change to 144 min
  • SSRMS: EarthKAM clearance maneuver
  • JEMRMS: ExHAM#1 transfer from JEM AL to JEF 

Three-Day Look Ahead:

  • Wednesday, 07/25: RR-7, Aerosol Sampler, PK-4 Ops
  • Thursday, 07/26: AC Inverter Deploy, BCAT, Dragon Cargo, PK-4 Ops, RR-7, MICS, CPA4 Cable C/O, EarthKAM, BEST, Potable Water Flush
  • Friday, 07/27: Micro-11, MICS, Dragon Cargo, Eye Exams, Plant Habitat, RR-7, MSFO stow, ESA EPO GV-Earth, LMM Biophysics Plate Removal, Pretreat Tank R&R, JEMAL Leak Check, AngieX Cancer, Aerosol Samplers, PK-4 Ops