ISS Daily Summary Report – 9/13/2018

Rodent Research-7 (RR-7): The crew completed the second of two days of rodent operations for the RR-7 investigation. Crewmembers will perform bone densitometer scans, blood draws, fecal pellet collections, and sampling operations. They also completed cleaning of the rodent habitats. The RR-7 investigation examines how the space environment affects the community of microorganisms in the gastrointestinal tract of mice (also known as the microbiota). It also looks at microgravity’s effects on multiple physiological systems known to be affected by the microbiota, including the gastrointestinal, immune, metabolic, circadian, and sleep systems. These studies should help explain mechanisms underlying interactions between these systems and the role of the microbiota in these interactions.

Microbial Tracking-2: Today a crewmember collected saliva samples for the Microbial Tracking-2 investigation and placed them inside a Minus Eighty Degree Celsius Laboratory Freezer for ISS (MELFI). MT-2 monitors the different types of microbes that are present on ISS over a 1-year period.  After the samples return to Earth, a molecular analysis of the RNA and DNA is conducted to identify the specific microbes that are present on ISS in order to understand the microbial flora diversity on the ISS and how it changes over time.

Food Acceptability: Crewmember performed the questionnaire. The Food Acceptability investigation seeks to determine the impact of repetitive consumption of food currently available from the spaceflight food system.  Results provide developing strategies to improve food system composition to support crew health and performance on long duration missions. 

H-II Transfer Vehicle (HTV)-7 Robotics On-Board Training (OBT): Today the crew performed a self-study OBT session using the Robotics Onboard Trainer (ROBoT) in preparation for HTV-7 approach and rendezvous. They practiced HTV approach and retreat monitoring, as well as HTV capture, using a simulated Space Station Remote Manipulator System (SSRMS). ROBoT is an on-orbit version of the ground-based Dynamics Skills Trainer (DST) that simulates robotics operations with graphical feedback.

Airlock Minicam Power/Video Cable Remove and Replace (R&R): In order to restore full functionality to the Airlock Minicam, the crew R&Rd a power and data cable that ground teams suspect has failed. This cable connects the Minicam to the Advanced Video Interface Unit (AVIU) and is required to capture video inside the Airlock during ExtraVehicular Activity (EVA) and Extravehicular Mobility Unit (EMU) operations. A checkout of the Minicam will be completed in conjunction with EVA activities during the upcoming HTV-7 Battery RVAs later in this month.

Completed Task List Activities:

  • Rodent Habitat Cleaning
  • MSG Cleanup after Rodent Research Ops

Ground Activities:
All activities are complete unless otherwise noted.

  • Nominal Commanding
  • N3 MCA Zero Calibration
  • Soyuz EHDC Survey

Two-Day Look Ahead:

Friday, 09/14:

Payloads

  • BCAT Camera Activities
  • Meteor System Disk recovery
  • Team Task Switching Survey
  • CAL Fiber cable troubleshoot
  • Plant Habitat Science Carrier #2 install
  • Tropical Cyclone Hardware uninstall

Systems

  • HTV-7 ROBoT Session 2 

Saturday, 09/15: Housekeeping, Crew Off-Duty

Payloads

  • Microbial Tracking-2 Saliva Collection
  • Rodent Research Sample relocate 

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • Rodent Research Node 2 Camcorder Video Setup
  • Rodent Research Animal Transfer
  • Rodent Research Operations 1A
  • Inventory Management System (IMS) conference
  • On-board Training (OBT) HTV Robotics Onboard Trainer (ROBoT) Session
  • Rodent Research Bone Densitometer Scan
  • COSMOCARD. Preparing for and Starting 24-hr ECG Recording
  • Rodent Research Operations 1B
  • Ultrasound 2 HRF Rack 1 Power On
  • SEPARATSIYA. Distillation in Auto Mode
  • Rodent Research MELFI Insert
  • Health Maintenance System (HMS) ISS Food Intake Tracker (ISS FIT)
  • Food Acceptability Questionnaire
  • Water transfer from Progress 439 (DC1) Rodnik H2O Tank 1
  • Repairs of SM Interior Panel by installing cover panels, Day 2
  • СТТС Configuration for MRM2
  • Installation of Network Connection Adapter (АСП), routing and connecting СУБА cables in MRM2 for future Payloads.
  • Rodent Research Centrifuge Setup
  • HRF Centrifuge Spin Conclude
  • Rodent Research MELFI Insert
  • Waste and Hygiene Compartment Filter Kit Audit
  • Changeout of СО2 Filter Unit in ИК 0501 Gas Analyzer.
  • Photo/TV Airlock Minicam Swap
  • Stand-alone functional test of Network Connection Adapter (АСП)-MRM2.
  • Recharging Soyuz 738 IRIDIUM Phone
  • Rodent Research MELFI Insert
  • Comm reconfig for nominal ops
  • СОЖ Maintenance
  • Recharging Soyuz 739 IRIDIUM phone
  • IMS Update
  • Vacuum Cleaning ВД1 and ВД2 air ducts in MRM2
  • Rodent Research Operations 2A
  • Rodent Research Operations 2B
  • В3 Fan Screen Cleaning in MRM2
  • HRF Centrifuge Spin Conclude
  • PROBOY. Acoustic Signal Converter Unit (БПАС) Power Off.
  • TReK Laptop Reconnect