ISS Daily Summary Report – 12/24/2019

Rodent Research-8 (RR-8): The crew performed a Habitat Restock for units three and four and performed a cleaning of the animal access unit. The hardware for this week’s upcoming operations was also gathered and the front Life Science Glovebox crew foot restraints were installed. The Rodent Research-8 (RR-8) investigation utilizes mice flown aboard the International Space Station (ISS), and maintained on Earth, to investigate the physiology of aging in response to microgravity and the role of aging in the onset and progression of disease.

Dragon Cargo Operations: This weekend and today, the Crew completed approximately 4.5 hours of cargo transfer and stowage tasks in support of the SpaceX-16 (SpX-16) mission. The next scheduled set of cargo operations are currently planned for Monday, 12/31/18 (GMT 365); approximately 25.5 hours of operations remain to complete the currently identified SpX-16 cargo tasks.

Completed Task List Activities:

  • T2 Monthly Inspection (Completed GMT 356)
  • Columbus FSL Repack Part 2 (Completed GMT 356)
  • Circadian Rhythms Armband Consumables Replacement (Completed GMT 356)
  • PEPS Inspection (Completed GMT 356)
  • HMS Food Intake Tracker (Completed GMT 356)
  • PMM1SD4 Light Installation (Completed GMT 356)
  • T2 Breakout Cable Installation (Completed GMT 356)
  • NMS ZBook Transition (Completed GMT 356)
  • EHS Radiation Detector Rotate (Completed GMT 358)
  • JSL LAB Ethernet Cable Routing (Completed GMT 358)

Ground Activities:
All activities are complete unless otherwise noted.

  • Nominal System Commanding
  • N3 MCA Zero Calibration

Three-Day Look Ahead:

Tuesday, 12/25: Crew off duty

Wednesday, 12/26:
Payloads

  • RR-8 Dissection setup (NASA)
  • MISSE MSC Install and JEMAL Depress(NASA)
  • TangoLab-2 Card swap (NASA)

Systems

  • Eye Examinations

Thursday, 12/27:
Payloads

  • CASIS PCG 13 card fills (NASA)
  • RR-8 Dissections (NASA)

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • Health Maintenance System (HMS) Periodic Health Status (PHS) Evaluation
  • HRF Generic Sample MELFI Retrieval And Insertion Operations
  • МО-8. Configuration Setup
  • HRF Generic Urine Collection Female
  • Body Mass Measurement – BMMD
  • HRF Generic Sample MELFI Retrieval And Insertion Operations
  • МО-8. Closeout Ops
  • MTT/MSC Installation Review
  • Auxiliary Laptop Computer System Virus Definition File Update
  • Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Water Recovery System (WRS) Sample Analysis
  • Lighting Effects Cognition Test 1 HRF PC 1
  • Behavioral Core Measures Journals Entry
  • Changeout of Thermal Mode Control System [СОТР] Replaceable Panel Assembly (ПАС1) in MRM2.
  • HRF Generic Sample MELFI Retrieval And Insertion Operations
  • Rodent Research Habitat 3 & 4 Restock
  • Lighting Effects Cognition Test 2 HRF PC 1
  • Rodent Research Gather-1
  • Food Acceptability Questionnaire
  • MRM1 comm config to support P/L Ops
  • SEPARATSIA. Centrifugal Multistage Vacuum Distiller (ЦМВД) power circuit integrity check.
  • Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Sample
  • Comm reconfig for nominal ops
  • Rodent Research Access Unit Clean
  • HRF Generic Urine Collection Stow
  • Atmosphere Recycling System (ARS) Major Constituent Analyzer (MCA) Zero Calibration
  • Rodent Research Procedure Review and Conference
  • LSG Crew Restraint Installation [Deferred]
  • Health Maintenance System (HMS) Vision Test
  • Health Maintenance System (HMS) Vision Questionnaire
  • Exercise Data Downlink via OCA for r/g 0130
  • Lighting Effects Cognition Test 3 HRF PC 1