SpaceX-17 Dragon Status: Today the crew completed cargo transfer into the Dragon vehicle followed by a conference with ground teams. Following cargo loading, the crew rotated the Common Berthing Mechanism (CBM) Controller Panel Assemblies (CPAs), installed CPA 4 and closed out the vestibule prior to egressing the vehicle. These activities are in preparation for Dragon departure tomorrow, June 3, at 11:00 AM CT.
Metal Oxide (METOX) Regeneration: The crew terminated round one of metox regen following the 14-hour cycle and initiated round 2.
Completed Task List Activities:
- Friday
- CSA “Ici La Terre” video, parts 1, 2
- Photobioreactor troubleshooting (t/s)
- RR12 Polar trash
- SSC15 shell swap
- EMU pump inlet filter found
- Saturday
- EMU ERCA t/s
- Housekeeping procedure print
- P/TV Lab SD camcorder swap
Ground Activities:
All activities are complete unless otherwise noted.
- Cargo transfer ops support
- Dragon egress and departure prep
Look Ahead:
Monday, 06/03 (GMT 154)
Payloads:
- Capillary Structures
- Furphy water transfer
Systems:
- SpX-17 departure
- MPEP removal
- Veggie facility cleanup
- Mouse habitat unit stowage
Tuesday, 06/03 (GMT 155)
Payloads:
- Vascular Echo
- ISS Experience
- VEG-04 install
Systems:
- 71P departure
- JEM grille cleaning
- ISS surface/air sampling
Today’s Planned Activities:
All activities are complete unless otherwise noted.
- Polar and TCU Transfer from ISS Overview
- Polar Transfer To Dragon Overview Review
- Cold Stowage Dragon Double Coldbag Pack Overview Review
- JAXA Mouse Mission Item Gathering
- Dragon Cable Routing
- XF305 Camcorder Setup
- JAXA Mouse Mission Post-mission Animal Transfer
- Polar Transfer To Dragon Overview Review
- Polar Express Rack Uninstall, Transfer, Handover And Dragon Install
- Polar Express Rack Uninstall, Transfer And Handover
- Furphy Procedure Review
- Polar Express Rack Uninstall, Transfer, Handover And Dragon Install
- Polar Express Rack Uninstall, Transfer And Handover
- Cold Stowage Double Coldbag Pack
- Cargo Transfer to Dragon
- Cargo Transfer to Dragon
- Dragon Locker Install
- Polar Express Rack Uninstall, and Transfer, JAXA TCU Handover, and Polar and TCU Dragon Install
- JAXA Mouse Mission Transportation Cage Unit Transfer to Dragon
- Double Coldbag Transfer to Dragon
- Metal Oxide (METOX) Regeneration Termination
- Metal Oxide (METOX) Regeneration Initiation
- Robotic Workstation (RWS) Setup
- Node2 HD Camera Activation
- Transfer Center Stack
- Urine Processor Assembly (UPA) Brine Filter Changeout
- PROFILAKTIKA-2. Hardware Setup
- Recycle Tank Drain
- Dragon Cargo Operations Conference
- Recycle Tank Drain Part 2
- Dragon Egress in Preparation for Departure
- CBM CPA Rotation, Installation, and Closeout