ISS Daily Summary Report – 6/02/2019

SpaceX-17 Dragon Status: Today the crew completed cargo transfer into the Dragon vehicle followed by a conference with ground teams. Following cargo loading, the crew rotated the Common Berthing Mechanism (CBM) Controller Panel Assemblies (CPAs), installed CPA 4 and closed out the vestibule prior to egressing the vehicle. These activities are in preparation for Dragon departure tomorrow, June 3, at 11:00 AM CT.

Metal Oxide (METOX) Regeneration: The crew terminated round one of metox regen following the 14-hour cycle and initiated round 2.

Completed Task List Activities:

  • Friday
    • CSA “Ici La Terre” video, parts 1, 2
    • Photobioreactor troubleshooting (t/s)
    • RR12 Polar trash
    • SSC15 shell swap
    • EMU pump inlet filter found
  • Saturday
    • EMU ERCA  t/s
    • Housekeeping procedure print
    • P/TV Lab SD camcorder swap

Ground Activities:
All activities are complete unless otherwise noted.

  • Cargo transfer ops support
  • Dragon egress and departure prep 

Look Ahead:

Monday, 06/03 (GMT 154)
Payloads:

  • Capillary Structures
  • Furphy water transfer

Systems:

  • SpX-17 departure
  • MPEP removal
  • Veggie facility cleanup
  • Mouse habitat unit stowage

Tuesday, 06/03 (GMT 155)
Payloads:

  • Vascular Echo
  • ISS Experience
  • VEG-04 install

Systems:

  • 71P departure
  • JEM grille cleaning
  • ISS surface/air sampling

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • Polar and TCU Transfer from ISS Overview
  • Polar Transfer To Dragon Overview Review
  • Cold Stowage Dragon Double Coldbag Pack Overview Review
  • JAXA Mouse Mission Item Gathering
  • Dragon Cable Routing
  • XF305 Camcorder Setup
  • JAXA Mouse Mission Post-mission Animal Transfer
  • Polar Transfer To Dragon Overview Review
  • Polar Express Rack Uninstall, Transfer, Handover And Dragon Install
  • Polar Express Rack Uninstall, Transfer And Handover
  • Furphy Procedure Review
  • Polar Express Rack Uninstall, Transfer, Handover And Dragon Install
  • Polar Express Rack Uninstall, Transfer And Handover
  • Cold Stowage Double Coldbag Pack
  • Cargo Transfer to Dragon
  • Cargo Transfer to Dragon
  • Dragon Locker Install
  • Polar Express Rack Uninstall, and Transfer, JAXA TCU Handover, and Polar and TCU Dragon Install
  • JAXA Mouse Mission Transportation Cage Unit Transfer to Dragon
  • Double Coldbag Transfer to Dragon
  • Metal Oxide (METOX) Regeneration Termination
  • Metal Oxide (METOX) Regeneration Initiation
  • Robotic Workstation (RWS) Setup
  • Node2 HD Camera Activation
  • Transfer Center Stack
  • Urine Processor Assembly (UPA) Brine Filter Changeout
  • PROFILAKTIKA-2. Hardware Setup
  • Recycle Tank Drain
  • Dragon Cargo Operations Conference
  • Recycle Tank Drain Part 2
  • Dragon Egress in Preparation for Departure
  • CBM CPA Rotation, Installation, and Closeout