ISS Daily Summary Report – 7/24/2019

SpaceX (SpX)-18 Launch Status: SpX-18 is scheduled to launch from Cape Canaveral Launch Complex 40 today at 5:24 PM CT carrying ~1680 kg of pressurized cargo and ~530 kg of unpressurized cargo to the ISS. The crew will utilize the Space Station Remote Manipulator System (SSRMS) to capture Dragon on Friday, July 26 at ~9:00 AM CT. 

NutrISS: The crew set up the Bioimpedance Device in preparation for upcoming measurements. Long duration spaceflight induces relevant changes in body composition and a loss of body mass. In this investigation, a periodic assessment of body composition (body weight, fat mass, and fat-free mass) during spaceflight aboard the ISS is performed using a dedicated bio-impedance analysis device to allow for the measurement of long-term energy balance modification over time. On the basis of this data, it is hypothesized that an adjusted diet maintaining a near-neutral energy balance, and/or increasing protein, intake can limit microgravity-induced bone and muscle loss of crew members.

PK-4 (Plasma Krystall-4): The crew initiated PK-4 Run #1 that will catch particle clouds inside the Plasma chamber. PK-4 is a scientific collaboration between the ESA and the Roscosmos, performing research in the field of “Complex Plasmas”: low temperature gaseous mixtures composed of ionized gas, neutral gas, and micron-sized particles.

Astrobee: The crew performed a data collection ops which will be used for calibration and localization for future mobility testing. Astrobee is a series of three free-flying, cube-shaped robots which are designed to help scientists and engineers develop and test technologies for use in microgravity to assist astronauts with routine chores, and give ground controllers additional eyes and ears on the ISS. The autonomous robots, powered by fans and vision-based navigation, perform crew monitoring, sampling, logistics management, and accommodate up to three investigations.

Biomolecule Extraction and Sequencing Technology (BEST): The crew initiated the third run by setting up the Biomolecule Sequencer and loading an RNA sample for a 48 hour sequencing run. The BEST investigation studies the use of sequencing for identification of unknown microbial organisms living on the ISS, and how humans, plants and microbes adapt to living on the ISS.

Lab Forward Port Intermodule Ventilation (IMV) Cleaning: The crew performed this regularly scheduled maintenance to inspect and clean the Lab forward port IMV fan and IMV silencers.

Life Support Rack (LSR) Activation: Yesterday, ESA successfully activated LSR and it is currently scrubbing CO2. With the LSR Carbon-Dioxide Concentration Assembly (CCA) in Auto, the Lab Carbon Dioxide Removal Assembly (CDRA) was be deactivated.  Teams are monitoring performance.

Emergency Roles & Responsibilities Review: With the arrival of the 59S crew, yesterday all six crewmembers participated in this required training. Some of the topics covered were crew accountability during an emergency situations, escape vehicle readiness, ISS Commander responsibilities and safe haven plan.

Completed Task List Activities:

  • WHC KTO replace
  • IVIDIL hardware pack for return

Ground Activities:
All activities are complete unless otherwise noted.

  • Office 365 upload
  • 59S DAM conference
  • Payloads ops support

Look Ahead:

Thursday, 7/25 (GMT 206)
Payloads:

  • VECTION Experiment session (CSA)
  • NUTRISS Bioelectrical Impedance 1st measurement (ESA)
  • CBEF IPU Cable connect (JAXA)
  • LMM Bio-6 sample retrieve (NASA)
  • RR-17 Habitat installs (NASA)
  • PK-4 Run 2 and Chamber Gas vlv to NEON (Joint)

Systems:

  • Dragon cargo transfer overview
  • Dragon RoBOT OBT
  • JEM window inspection
  • Stbd Solar Array Wing survey 

Friday, 7/26 (GMT 207)
Payloads:

  • BioRock On-board Training (ESA)
  • JAXA-EPO Item Gather (JAXA)
  • LMM Bio-6 plate 1 MERLIN insert (NASA)
  • RR-17 Transfer conference (NASA)
  • NanoRacks Module 9 On-board Training (NASA)
  • PK-4 Run 3 and HD exchange (Joint)
  • ELF Gas Bottle Unit vlv close (JAXA)

Systems:

  • Dragon capture/ingress
  • OBT emergency hardware familiarization

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • Configure USB Cables and charge five Personal CO2 Monitors in prep for ACO activity.
  • LAB Window Inspection Cleanup
  • Astrobee Free Flyer Localization and Mobility Ops Part 2
  • PILOT-T. Preparation for the experiment. Tagup with specialists as necessary
  • LAB Window Inspection 1
  • PILOT-T.  Experiment Ops. Tagup with specialists as necessary
  • LAB Window Inspection Cleanup
  • In Flight Maintenance (IFM) Lab FWD Port Intermodule Ventilation (IMV) Fan Cleaning
  • PK-4 Experiment Run 1/1
  • Crew conference on Debris Avoidance Maneuver (DAM) with the use of Soyuz 746 thrusters
  • In Flight Maintenance (IFM) Quick Disconnect (QD) Dekey
  • Hermes Vacuum Valve Open
  • HRF Centrifuge Tube Removal
  • Telescience Resource Kit Laptop Open
  • SEPARATION. Activation of [СРВ-У-РС] system. Starting Distillation Cycle 1
  • Calibrate five Personal CO2 Monitors as part of ACO Activity.
  • Handover of Increment 60 Crew
  • Setup and Activation of Crew Onboard Support Kit (КСПЭ) Equipment for coverage via RGS
  • ISS-MCC-M TV TV coverage via RGS.  Tagup with specialists
  • TV System Closeout after after RS TV coverage via RGS
  • PK-4 Experiment Run 1/2
  • Public Affairs Office (PAO) High Definition (HD) Config LAB Setup
  • Public Affairs Office (PAO) Event in High Definition (HD) – Lab
  • Intermodular TORU Test with Mated Progress 441 (DC1)
  • MELFI Ice Brick Transfer
  • Payloads Network Attached Storage (NAS) Deep Cleaning
  • Biomolecule Extraction and Sequencing Technology (BEST) MWA Preparation
  • Biomolecule Extraction and Sequencing Technology (BEST) MELFI Sample Retrieve
  • On MCC GO  ISS O2 Repress from Progress 441 (DC1) СРПК Section 1, initiate
  • Biomolecule Extraction and Sequencing Technology (BEST) Experiment 3 RNA Run
  • Polar Desiccant Swap
  • On MCC GO ISS O2 Repress from Progress 441 (DC1) СРПК Section 1, terminate
  • PK-4 Experiment Run 1/3
  • MERLIN Desiccant Swap
  • Tool Disposal
  • SEPARATION. Deactivation of [СРВ-У-РС] system. Log-file downlink