ISS Daily Summary Report – 7/01/2020

Systems

USOS Extravehicular Activity (EVA) #66/S6 Battery EVA #2:  Chris Cassidy (EV1) and Bob Behnken (EV2) performed a 6 hour 1 minute EVA that completed the following tasks in support of the S6 Channel 1B battery transition from nickel hydrogen (NiH2) to lithium-ion (Li-ion) batteries:

  • Li-ion Battery D from EP to S6 IEA Slot 6
  • NiH2 Battery 5 from S6 IEA to External Pallet (EP)
  • Adapter Plate D from EP to S6 IEA Slot 5
  • 1B Worksite Cleanup and 3B Reconfigurations
  • S3 Power & Ethernet Cable Routing

The crew attempted to remove the H-Fixture from the S4 BGA 3A canister. They were able to successfully remove all 4 bolts but could not overcome the ball detents to remove the H-fixture. The task was aborted and the crew reinstalled 2 of the 4 bolts.

Completed Task List Activities:

  • Remove and Replace Waste Hygiene Compartment (WHC) ЕДВ-Y

Today’s Ground Activities:
All activities are complete unless otherwise noted.

  • USOS Ground Support for US EVA #66

Look Ahead Plan

Thursday, 7/2 (GMT 184)
Payloads:

  • Astrobee on
  • FIR/LMM/CDM change out
  • ELF software update
  • Food Physiology
  • MERLIN descant swap
  • RADI-N2 detector retrieval and processing

Systems:

  • HMS Ultrasound
  • Post-EVA PHS Exams
  • EMU Water Recharge

Friday, 7/3 (GMT 185)
Payloads:

  • No Payload activities

Systems:

  • Crew Off Duty 

Saturday, 7/4 (GMT 186)
Payloads:

  • Astrobee off 

Systems:

  • Crew Off Duty 

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • USOS Extravehicular Activity (EVA) Communication Configuration
  • ISS HAM Radio Power Down in Service Module & Columbus
  • EVA COTS UHF Communication Unit (CUCU)  Verify off
  • Extravehicular Activity (EVA) In-Suit Light Exercise (ISLE) Preparation
  • Setup equipment (КСПЭ and Laptop RSS1) for TV coverage via Broadband Comm System (ШСС)
  • Test comm sessions via Luch-5В Relay Satellite (95°) and 2-way audio/video comm check with ШСС smart station [АРМ]
  • Laptop RSK1 battery checkout
  • Checking cover closure on SM windows 6, 8, 9, 12, 13, 14
  • Extravehicular Mobility Unit (EMU) Purge
  • Extravehicular Mobility Unit (EMU) In-Suit Light Exercise (ISLE) Prebreathe
  • TV conference via Broadband Communication System (ШСС). Voting on amendments to the Constitution of the Russian Federation. Comm session with the Central Election Commission
  • Regeneration of Micropurification unit (БМП) Ф2 cartridge (end)
  • BACKUP. TV conference via Broadband Communication System (ШСС). Voting on amendments to the Constitution of the Russian Federation. Comm session with the Central Election Commission [ABORTED]
  • Crewlock Depress
  • Checkout of МР5-15Г microcompressors (fans) from spare Vozdukh ORU Test panel
  • Crewlock Post Depress
  • Crewlock Egress
  • SSRMS EVA Setup
  • Worksite Preparation
  • SSRMS EVA Support
  • Move Battery D to Slot 6
  • Move Battery 5 to EP D/AP D to Slot 5
  • Delta file prep
  • Turning off camcorder, TV system controls, closing applications
  • 1B Cleanup / Reconfigure for 3B
  • Filling (degassing) ЕДВ [КОВ] for Elektron or ЕДВ-[СВ]
  • Monthly health check of RS video recording equipment
  • 3A H-Fixture Release
  • Route S3 Power Cable
  • Vacuum cleaning of air ducts ВД1 and ВД2 in MRM2
  • Route S3 Ethernet Cable
  • Vacuum cleaning of air ducts ВД1 and ВД2 in DC1
  • Environmental Health System (EHS) – Formaldehyde Monitoring Kit (FMK) Stow Operation
  • EVA Crew Lock Ingress
  • PCS-DAS Teardown
  • Crewlock Pre Repress
  • Crewlock Repress
  • Extra Vehicular Activity (EVA) Post-EVA Activities
  • EVA Glove Photo Setup, Photography, and Downlink
  • Photo/TV Extravehicular Activity (EVA) Camera Disassembly
  • Photo/TV Extravehicular Activity (EVA) GoPro Downlink
  • USOS Extravehicular Activity (EVA) Communication Deconfiguration
  • URAGAN. Installation and activation of SOVA and VSS PL.