Systems
USOS Extravehicular Activity (EVA) #66/S6 Battery EVA #2: Chris Cassidy (EV1) and Bob Behnken (EV2) performed a 6 hour 1 minute EVA that completed the following tasks in support of the S6 Channel 1B battery transition from nickel hydrogen (NiH2) to lithium-ion (Li-ion) batteries:
- Li-ion Battery D from EP to S6 IEA Slot 6
- NiH2 Battery 5 from S6 IEA to External Pallet (EP)
- Adapter Plate D from EP to S6 IEA Slot 5
- 1B Worksite Cleanup and 3B Reconfigurations
- S3 Power & Ethernet Cable Routing
The crew attempted to remove the H-Fixture from the S4 BGA 3A canister. They were able to successfully remove all 4 bolts but could not overcome the ball detents to remove the H-fixture. The task was aborted and the crew reinstalled 2 of the 4 bolts.
Completed Task List Activities:
- Remove and Replace Waste Hygiene Compartment (WHC) ЕДВ-Y
Today’s Ground Activities:
All activities are complete unless otherwise noted.
- USOS Ground Support for US EVA #66
Look Ahead Plan
Thursday, 7/2 (GMT 184)
Payloads:
- Astrobee on
- FIR/LMM/CDM change out
- ELF software update
- Food Physiology
- MERLIN descant swap
- RADI-N2 detector retrieval and processing
Systems:
- HMS Ultrasound
- Post-EVA PHS Exams
- EMU Water Recharge
Friday, 7/3 (GMT 185)
Payloads:
- No Payload activities
Systems:
- Crew Off Duty
Saturday, 7/4 (GMT 186)
Payloads:
- Astrobee off
Systems:
- Crew Off Duty
Today’s Planned Activities:
All activities are complete unless otherwise noted.
- USOS Extravehicular Activity (EVA) Communication Configuration
- ISS HAM Radio Power Down in Service Module & Columbus
- EVA COTS UHF Communication Unit (CUCU) Verify off
- Extravehicular Activity (EVA) In-Suit Light Exercise (ISLE) Preparation
- Setup equipment (КСПЭ and Laptop RSS1) for TV coverage via Broadband Comm System (ШСС)
- Test comm sessions via Luch-5В Relay Satellite (95°) and 2-way audio/video comm check with ШСС smart station [АРМ]
- Laptop RSK1 battery checkout
- Checking cover closure on SM windows 6, 8, 9, 12, 13, 14
- Extravehicular Mobility Unit (EMU) Purge
- Extravehicular Mobility Unit (EMU) In-Suit Light Exercise (ISLE) Prebreathe
- TV conference via Broadband Communication System (ШСС). Voting on amendments to the Constitution of the Russian Federation. Comm session with the Central Election Commission
- Regeneration of Micropurification unit (БМП) Ф2 cartridge (end)
- BACKUP. TV conference via Broadband Communication System (ШСС). Voting on amendments to the Constitution of the Russian Federation. Comm session with the Central Election Commission [ABORTED]
- Crewlock Depress
- Checkout of МР5-15Г microcompressors (fans) from spare Vozdukh ORU Test panel
- Crewlock Post Depress
- Crewlock Egress
- SSRMS EVA Setup
- Worksite Preparation
- SSRMS EVA Support
- Move Battery D to Slot 6
- Move Battery 5 to EP D/AP D to Slot 5
- Delta file prep
- Turning off camcorder, TV system controls, closing applications
- 1B Cleanup / Reconfigure for 3B
- Filling (degassing) ЕДВ [КОВ] for Elektron or ЕДВ-[СВ]
- Monthly health check of RS video recording equipment
- 3A H-Fixture Release
- Route S3 Power Cable
- Vacuum cleaning of air ducts ВД1 and ВД2 in MRM2
- Route S3 Ethernet Cable
- Vacuum cleaning of air ducts ВД1 and ВД2 in DC1
- Environmental Health System (EHS) – Formaldehyde Monitoring Kit (FMK) Stow Operation
- EVA Crew Lock Ingress
- PCS-DAS Teardown
- Crewlock Pre Repress
- Crewlock Repress
- Extra Vehicular Activity (EVA) Post-EVA Activities
- EVA Glove Photo Setup, Photography, and Downlink
- Photo/TV Extravehicular Activity (EVA) Camera Disassembly
- Photo/TV Extravehicular Activity (EVA) GoPro Downlink
- USOS Extravehicular Activity (EVA) Communication Deconfiguration
- URAGAN. Installation and activation of SOVA and VSS PL.