ISS Daily Summary Report – 9/01/2020

Payloads

EXPRESS Rack Relocation:  The crew performed the activities necessary to relocate EXPRESS racks 8, 10B, and 11B to their final locations.  EXpedite the PRocessing of Experiments to Space Station (EXPRESS) Racks are multipurpose payload rack systems that store and support research aboard the International Space Station (ISS). The EXPRESS Racks support science experiments in any discipline by providing structural interfaces, power, data, cooling, water, and other items needed to operate science experiments in space.  ER 10B and 11B are two of three basic EXPRESS racks.  Basic EXPRESS Racks have been simplified to include only the most commonly required resources and feature more common connectors such as a standard Ethernet cable.

Completed Task List Activities:

  • None

Today’s Ground Activities:
All activities are complete unless otherwise noted.

  • Ground Support for Three-Way Rack Transfer
  • Thrusters disable for MISSE Ops
  • LS FDIR Inh/Ena for JEMRMS Ops and MISSE Ops

Look Ahead Plan

Wednesday, 9/2 (GMT 246)
Payloads:

  • EXPRESS Rack Reconfig (post-relocation)
  • ISS HAM Pass
  • LIDAL Return
  • NREP Hardware Remove Overview 

Systems:

  • IFM Hatch Seal Inspections
  • ER-11B Umbilical Mate
  • WHC Piping R&R
  • PWD Water Collect 

Thursday, 9/3 (GMT 247)
Payloads:

  • JEMAL Ops
  • NREP Hardware Remove
  • SCRAM Power On 

Systems:

  • UPA Software Transition
  • TOCA Run

Friday, 9/4 (GMT 248)
Payloads:

  • Astrobee Localization/Mobility Ops
  • Biolab TCU Clean
  • JEMAL Ops
  • MELFI1 EU Swap
  • Radi-N2 Retrieve & Handover

Systems:

  • EHS CFM T+2

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • Auxiliary Computer System [ВКС] laptops anti-virus scan and report
  • Comm Configuration from MRM1
  • Photo TV High Definition (HD) Video Setup/Stow for Rack Transfers
  • ТБУ (Universal Bioengineering Thermostat). Checking ТБУ-В No.07 thermostat temperature and unobstructed area near ТБУ-В inlet/outlet vents
  • SEPARATION. Test activation of urine water regeneration system [СРВ-У-PC] in auto mode
  • Structures & Mechanisms (S&M) EXPRESS Rack-11 Transfer Preparation
  • Cleaning vent screens on FGB interior panels  (panels 116, 316, 231, 431)
  • Preparing for Troubleshooting FGB Power Supply System and СУБК devices
  • Structures & Mechanisms (S&M) EXPRESS-8 Rack Transfer Preparation and Umbilical Demate
  • Replacement of filters in FGB Dust Collectors 1, 2  (panels 203, 403)
  • Structures & Mechanisms (S&M) EXPRESS Rack-11 Transfer and Tie Down at NOD1D2
  • Structures & Mechanisms (S&M) EXPRESS Rack-10B Transfer to COL1O2
  • Structures & Mechanisms (S&M) EXPRESS-8 Transfer to JPM1A5
  • PROBOY. Disconnecting Acoustic Signal Converter Unit (БПАС) power cable from РБС outlet
  • Filling (separation) of ЕДВ (КОВ) for Elektron or ЕДВ-СВ
  • Structures & Mechanisms (S&M) EXPRESS Rack-11 Transfer to LAB1P4
  • Structures and Mechanisms (S&M) EXPRESS Rack-8 Closeout
  • Preparing for measuring temperature on the case and connectors of storage battery current converter ПТАБ No.4
  • Russian Video recording of greetings
  • Structures and Mechanisms (S&M) EXPRESS Rack-11 Lab Cleanup
  • Structures & Mechanisms (S&M) EXPRESS Rack-10B Transfer Closeout
  • Structures and Mechanisms (S&M) EXPRESS Rack-10B Relabel
  • Urine Processing Assembly 6.4.1 Software Transition Gather
  • Progress 448 (SM Aft) transfers and IMS ops
  • URAGAN. Installation and activation of Auto Orientation System for Video Spectral Equipment (SOVA) and photo equipment