ISS Daily Summary Report – 9/03/2020

Payloads

NREP Hardware Remove: Following the extension of the slide table into the JEM pressurized volume and removal of NREP from the slide table, the crew removed External Platform Module-7 (Craig-X) and External Platform Module-12 (Astrileux) from NREP.  NREP was then placed back on the slide table and will be returned to its external location.

  • Craig-X is a Flight Test Platform (FTP) designed to promote electronics testing to raise Technology Readiness Levels (TRL) at a low cost and a reduced time frame.  This experiment began having communication issues early this year and despite multiple recovery attempts, was never able to recover.
  • Astrileux evaluates the effects of space exposure on new materials that, for the first time, show optical performance in the extreme ultraviolet (EUV) wavelength range (10-20 nm).  These materials have potential for a new generation of space instrumentation that can capture EUV radiation for use in remote sensing, planet mapping, telescopes, semiconductor applications and other systems.

Spacecraft Atmosphere Monitor (SCRAM): The crew removed the Major Constituent Analyzer (MCA) plug from the SCRAM and powered it up.  The MCA plug is used to protect the SCRAM’s sensor when the unit is powered off.  SCRAM demonstrates the capabilities of a small, reliable, portable gas chromatograph mass spectrometer instrument aboard the ISS to conduct major and minor elements of air measurement (Nitrogen, Oxygen, Carbon Dioxide, Methane, Water, etc). The instrument transmits data back to the ground research team every two seconds, providing a continuous analysis to the ground research team. It has a mass of less than 9.5 kg and consumes less than 40 watts of power in its nominal configuration.

Systems

Urine Processing Assembly (UPA) Software Transition: Today the crew assisted the ground team in performing a firmware update on the UPA to acquire new software capabilities. The software updates are required prior to the installation of the new Toilet System. The crew performed a setup and teardown of the SSC-to-UPA Data Module connections in the Water Recovery System 2 (WRS-2) Rack. The new software will perform additional UPA leak checks and add leak annunciation to additional UPA states to alert the ground and crew to a potential leak or fluid backflow resulting from Toilet System faults.

Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Water Recovery System (WRS) Sample Analysis & Data Record: Crew performed an analysis of the water processing assembly (WPA) using the TOCA. The TOCA unit oxidizes organic carbon species present in the water to carbon dioxide gas and measures the concentration using nondispersive infrared spectroscopy. Analysis of the potable water using the TOCA occurs on a weekly basis.

Completed Task List Activities:

  • Station Support Computer (SSC) 8 Hard Disk Drive (HDD) Swap
  • Wanted Poster ACME Igniter Arm 2
  • Swap of N2 PCS and USCV PCS ZBooks for Log File Save
  • Crew Communication Headset Inspection and Replacement

Today’s Ground Activities:
All activities are complete unless otherwise noted.

  • Passive Thermal Control System (PTCS) PMA3 Heater Test
  • FGB Solar Array Video Survey
  • Ground Supt for MISSE Ops
  • VES limit adjustment for CIR activation
  • Thruster disable/enable for JEMRMS Ops
  • JEM RMS Ops Video Support

Look Ahead Plan

Friday, 9/4 (GMT 248)
Payloads:

  • Astrobee Localization/Mobility Ops
  • Biolab TCU Clean
  • JEMAL Ops
  • MELFI1 EU Swap
  • Radi-N2 Retrieve & Handover

Systems:

  • EHS CFM T+2

Saturday, 9/5 (GMT 249)
Payloads:

  • Astrobee Off

Systems:

  • Crew Off Duty 

Sunday, 9/6 (GMT 250)
Payloads:

  • No Utilization Activities

Systems:

  • Crew Off Duty

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • JEM PS-120 Junction Box Troubleshooting
  • JEM Airlock Press & Leak Check
  • Transfer of [БНП] tank from DC1 to MRM2
  • ТБУ. Check ТБУ-В #07 thermostat temperature and keep out zones in front of ТБУ-В inlets and outlets
  • URAGAN. Closeout operations and teardown of SOVA and photo equipment
  • JEM Airlock Slide Table (ST) Extension & Retraction to/from JPM Side
  • Life on the ISS photo and Russian video
  • NanoRacks External Platform Removal from the Slide Table
  • NanoRacks External Platform Payload Hardware Removal
  • BIOCARD. Experiment ops.
  • JEM Airlock Depressurization
  • Health Maintenance System (HMS) ISS Food Intake Tracker (ISS FIT)
  • Spacecraft Atmosphere Monitor Power On
  • Station Support Computer Transition Relocation to Node 3
  • Urine Processing Assembly 6.4.1 Software Transition Setup, Init & Closeout
  • Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Water Recovery System (WRS) Sample Analysis & Data Record
  • VIZIR. Experiment session using СКПФ-УМ hardware
  • Spacecraft Atmosphere Monitor MCA Plug Remove
  • JEM Airlock Vent & Confirmation
  • Water transfer from DC1 Progress #444 Rodnik water tank #1 (БВ1) into a EDV
  • Preparation of ПТАБ-1М storage battery current converter unit R&R (position A307)
  • URAGAN. SOVA and photo equipment setup and power on.
  • Flight Director/ISS Crew Conference
  • Astrobee Stowage Clear