ISS Daily Summary Report – 10/13/2020

Systems

Extravehicular Mobility Units (EMU) 3004/3006 Loop Scrub, and Iodination: The crew performed EMU water loop scrubs and then acquired and tested water samples for conductivity on units 3004 and 3006. Additionally, the crew installed the Hard Upper Torso (HUT) ORU Scrubber to a spare HUT to scrub and iodinate the spare HUT water lines. EMU Loop Scrubs are required preventive maintenance needed to remove any chemical and biological contaminants from the EMU transport loop.

Completed Task List Activities:

  • 62S Pre-Pack [Active]
  • Cygnus Cargo Ops [Active]

Today’s Ground Activities:
All activities are complete unless otherwise noted.

  • Space Station Remote Manipulator System (SSRMS) Walkoff
  • UHF1 Activation
  • Ground Supt for EMU Loop Scrub

Look Ahead Plan

Wednesday, 10/14 (GMT 288)
Payloads:

  • FSL-SMD Remove & MultiScale Boiling Insert (ESA)
  • AWP Watch Don (NASA)
  • ISS HAM Pass (NASA)

Systems:

  • 63S Dock
  • ISS Safety Briefing 

Thursday, 10/15 (GMT 289)
Payloads:

  • Handhold Experiment Platform Adapter on MPEP Install (NASA)
  • STaARS-12 Kit-ambient stow, Exp Containers into Facility (NASA)
  • Rhodium Space Rhizosphere Chamber Photo (NASA)
  • Rhodium Space Rhizosphere Chamber to POLAR (NASA)
  • MSG PBRE-2 Cleanup (NASA)

Systems:

  • MPEP Installation
  • Handhold Exp Platform Adapter Install on MPEP
  • WHC Pre-Treat Tank R&R

Friday, 10/16 (GMT 290
Payloads:

  • VECTION Session (CSA)
  • DOSIS 3D PDP Swap (ESA)
  • MVP Module Photo/Install (NASA)
  • HRF Saliva Setup (NASA)
  • STaARS-12 Sample MELFI Insert (NASA)
  • Food Acceptability (NASA) 

Systems:

  • CQ Port Clean
  • EMER Roles/Resp Review
  • HMS IMAK Unpack

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • NEUROIMMUNITET. Experiment Ops
  • KORREKTSIYA. Blood Collection. Handover to USOS for MELFI Insertion
  • Insertion of Russian experiments blood samples into MELFI
  • Crew Choice Event
  • Extravehicular Mobility Unit (EMU) Swap
  • Extravehicular Mobility Unit (EMU) Secondary Oxygen Package (SOP) Check-Out Fixture (SCOF) Positive Pressure Relief Valve Cycling
  • Extravehicular Mobility Unit (EMU) Cooling Loop Maintenance Scrub Initiation
  • ТБУ (Universal Bioengineering Thermostat). Checking ТБУ-В No.07 thermostat temperature and unobstructed area near ТБУ-В inlet/outlet vents
  • Extravehicular Mobility Unit (EMU) Hard Upper Torso (HUT) Scrubber Install & Deconfiguration
  • LBNP Training (PRELIMINARY)
  • Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Low Calibration
  • Extravehicular Mobility Unit (EMU) Cooling Loop Maintenance Iodination
  • Countermeasures Systems (CMS) Exercise Equipment Gather
  • Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Sample Data Record
  • EVA Extravehicular Mobility Unit (EMU) Cooling Loop Scrub Deconfiguration
  • Recharging Soyuz 745 Samsung tablet prior to training