ISS Daily Summary Report – 10/31/2023

Payloads:

Actiwatch-Plus: Actiwatch units were doffed from two crewmembers. The Actiwatch-Plus is a waterproof, non-intrusive, sleep-wake activity monitor worn on the wrist of a crewmember and contains a miniature uniaxial accelerometer that produces a signal as the subject moves. The data is stored in non-volatile memory within the Actiwatch until it is downloaded for analysis.

Systems:

USOS ExtraVehicular Activity (EVA) Preparation Operations: The majority of crew operations today were in preparation for the USOS Radio Frequency Groups (RFG) EVA taking place on Wednesday, November 1st. The crew performed activities such as a pre-EVA Health Examination, Robotics WorkStation (RWS) setup, Equipment Lock Preparation, an EVA Cuff Checklist print, and a group EVA Procedure Review & Conference. During the RFG EVA, the crew will retrieve the RFG for ingress and disassembly, as well as Remove and Replace (R&R) the Trundle Bearing Assembly (TBA) on the Port Solar Alpha Rotary Joint (SARJ).

Urine Transfer System (UTS) Offload EDV Swap: Today, the crew swapped the EDV in the offload EDV spot of the UTS. The main objective of the UTS is to provide automated control of urine flow from Toilet System and Waste Hygiene Compartment (WHC) or from external storage containers into the UPA Wastewater Storage Tank Assembly (WSTA).

Completed Task List Activities:

  • WSS RST SWAP [GMT 303]
  • WHC-KTO-REPLACE [GMT 304]

Today’s Ground Activities:
All activities are complete unless otherwise noted.

  • JEMAL Depress & Vent
  • Potable System Configuration for EDV Fills
  • VDS HD Video Dump

Look Ahead Plan

Wednesday, November 1 (GMT 305)
Payloads:

  • No Payload Activities

Systems:

  • USOS RFG Retrieval EVA

Thursday, November 2 (GMT 306)
Payloads:

  • Circadian Light Data Measurement

Systems:

  • SpX-29 Dragon Vehicle Operations OBT
  • EVA Debrief
  • EMU Water Recharge
  • EVA Airlock Deconfiguration
  • SSRMS LEE HD Survey

Friday, November 3 (GMT 307)
Payloads:

  • Actiwatch HRF Setup
  • Frost FOAM Attach
  • Circadian Light Data
  • Clingers Software Upload
  • EarthKam Review
  • Immunity Assay Kit Gather
  • ISS Ham Pass

Systems:

  • IFM RFG Disassembly
  • SpX-29 Dragon Vehicle Operations OBT
  • PEPS Inspection
  • SSRMS IDA2 Survey
  • MSS PMA2 Survey
  • HMS OCT2 Exam

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • POC DOUG Setup
  • COL Payload Laptop 3 Deinstallation
  • EDV Deiodinated Water Fills
  • HMS PHS Pre EVA Examination
  • RWS Setup
  • EVA Pistol Grip Tool Battery Installation
  • Equipment Lock Preparation
  • Robotics Procedure Review
  • EVA iPad Preparation
  • Airlock IV Hatch Seal Cleaning
  • HMS ISS EveryWear Nutrition Tracking & ESA Nutritional Assessment
  • EVA Cuff Checklist Print
  • UTS Offload EDV Swap
  • ECLSS EDV Stowage
  • USOS Window Shutter Close
  • Actiwatch Plus Watch Doff
  • EVA Procedure Review/Conference