Key Milestones for Today’s Launch

SpaceX’s Falcon 9 rocket with Dragon spacecraft stands ready for launch at Launch Complex 39A at NASA’s Kennedy Space Center in Florida. The company’s 24th Commercial Resupply Services mission, targeted for liftoff on Dec. 21, 2021 at 5:07 a.m. EST, will deliver new science investigations, supplies, and equipment to the crew on board the International Space Station. Photo credit: SpaceX
SpaceX’s Falcon 9 rocket with Dragon spacecraft stands ready for launch at Launch Complex 39A at NASA’s Kennedy Space Center in Florida. The company’s 24th Commercial Resupply Services mission, targeted for liftoff on Dec. 21, 2021 at 5:07 a.m. EST, will deliver new science investigations, supplies, and equipment to the crew on board the International Space Station. Photo credit: SpaceX

Packed with more than 6,500 pounds of research, crew supplies and hardware, the SpaceX Dragon spacecraft will launch on a Falcon 9 rocket from Launch Complex 39A at NASA’s Kennedy Space Center in Florida today at 5:07 a.m EST.

Here’s a look at some of today’s countdown and ascent milestones. All times are approximate:

COUNTDOWN
Hr/Min/Sec
         Event
– 00:38:00             SpaceX Launch Director verifies go for propellant load
– 00:35:00             RP-1 (rocket grade kerosene) loading begins
– 00:35:00             1st stage LOX (liquid oxygen) loading begins
– 00:16:00             2nd stage LOX loading begins
– 00:07:00             Falcon 9 begins pre-launch engine chill
– 00:05:00             Dragon transitions to internal power
– 00:01:00             Command flight computer to begin final prelaunch checks
– 00:01:00             Propellant tanks pressurize for flight
– 00:00:45             SpaceX Launch Director verifies go for launch
– 00:00:03             Engine controller commands ignition sequence to start
– 00:00:00             Falcon 9 liftoff

LAUNCH, LANDING, AND DRAGON DEPLOYMENT
Hr/Min/Sec
        Event
00:01:18               Max Q (moment of peak mechanical stress on the rocket)
00:02:30              1st stage main engine cutoff (MECO)
00:02:34              1st and 2nd stages separate
00:02:41              2nd stage engine starts
00:06:37              1st stage entry burn begins
00:08:38              2nd stage engine cutoff (SECO)
00:08:38              1st stage landing
00:11:49               Dragon separates from 2nd stage
00:12:35               Dragon nosecone open sequence begins

Follow launch activities on the mission blog, view more live coverage and countdown commentary beginning on NASA Television and the agency’s website, as well as YouTube, Twitter, Facebook, LinkedIn, Twitch, Daily Motion, Theta.TV and NASA’s App.