ISS Daily Summary Report – 5/25/2020

Payloads

H-II Transfer Vehicle (HTV) Wireless LAN Demonstration: The crew performed the XF305 camera setup in order to allow ground teams to monitor the HTV Wireless LAN Demonstration network data from the SSC16 laptop data. HTV Wireless LAN Demonstration (HTV WLAN Demo) demonstrates real-time wireless video transfer between the International Space Station (ISS) and a visiting spacecraft. Autonomous docking technology is important for future missions, such as to the Moon and Mars, that will be unable to rely on human operations the same way as current vehicle logistics. Stable and high-rate data transfer is critical to the real-time video monitoring required for docking.

Systems 

H-II Transfer Vehicle (HTV)9 Capture and Berthing: HTV9 launched on May 20th and was successfully captured today at 7:13 am CT. Berthing occurred approximately 2 hours later and the crew ingressed the vehicle at 2:25 pm CT. Ingress was originally planned for tomorrow morning but the crew worked diligently to continue with vestibule outfitting to ingress ahead of schedule. The vehicle delivered approximately four tons of supplies, parts, and experiment hardware.

Completed Task List Activities:

  • Microgravity Science Glovebox (MSG) Hardware Locate
  • Crew Dragon Docking crew activities and hatch operations
  • Crew Dragon: Docked operations and cargo review
  • Crew Dragon Mission Overview
  • Crew Dragon Rendezvous and Approach Overview
  • Crew Dragon Systems Overview
  • Node 2 Pump Package Assembly (PPA) Gas Trap Plug Installation
  • PCS/Cable Pregather for Crew Dragon Use
  • HTV-9 Rack Transfer Big Picture Words
  • Portable Computer System (PCS) Hard Drive Image

Today’s Ground Activities:
All activities are complete unless otherwise noted.

  • HTV Capture Ground Support

Look Ahead Plan

Tuesday, 5/26 (GMT 147)
Payloads:

  • HOURGLASS-SD Swap (JAXA)
  • CIR Manifold Bottle Change (NASA)

Systems:

  • Crew Dragon Vehicle Ops CBT
  • Exercise Equipment Gather

Wednesday, 5/27 (GMT 148)
Payloads:

  • ISS Experience Node 2 setup (NASA)

Systems:

  • CBCS & VOK Restow
  • COL1O2 ZSR Prep & Transfer
  • Crew Dragon SSC Relocate
  • HTV Emer Review OBT
  • Docking Dragon Monitoring Tools Setup

Thursday, 5/28 (GMT 149)
Payloads:

  • Food Physiology Brief (NASA)
  • ISS Experience Recording Demo-2 Dragon hatch open (NASA)
  • LAN WAP cable Reconfig (JAXA) 

Systems:

  • Crew Dragon Docking
  • Crew Dragon Emergency Response Review
  • Emergency Equipment Transfer
  • Dragon/ISS IAS Audio Checkout
  • OBT Dragon Debrief Conference

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • RWS Setup for HTV
  • Robotic Workstation (RWS) High Definition (HD) Monitor Downlink
  • USOS Window Shutter Close
  • Verify closure of shutters on windows 6, 8, 9, 12, 13, 14
  • Portable Computer System (PCS) Command Verification
  • Scheduled monthly maintenance of the Central Post laptop. Downlink Log-files via OCA
  • HTV  Approach Monitoring
  • SSRMS HTV Grapple
  • Centerline Berthing Camera System (CBCS) Powerup
  • Water Separation with the use of [НС-КВ]
  • Dragon Monitoring Tools Partial Teardown
  • Robotic Workstation (RWS) High Definition (HD) Monitor Deactivation
  • Node2 HD Camera Activation
  • Node 2 to HTV Pressurization and Leak Check Part 1
  • Centerline Berthing Camera System (CBCS) Removal
  • Auxiliary Laptop Computer System Anti-Virus Software Update
  • UF-ATMOSFERA. Hardware setup and Payload Activation
  • Node 2 to HTV Pressurization and Leak Check Part 2
  • Node 2 Nadir to HTV Vestibule Outfitting Part 1
  • Preparing for SW Antivirus Scan on Auxiliary Computer System Laptops
  • UF-ATMOSFERA. Hardware Check
  • Node 2 Nadir Common Berthing Mechanism (CBM) Controller Panel Assembly (CPA) Removal
  • Node 2 Nadir to HTV Vestibule Outfitting Part 2
  • H-II Transfer Vehicle (HTV) Ingress
  • Air Sample Collections using [АК-1М] Sampler in HTV