ISS Daily Summary Report – 5/26/2020

Payloads

Advanced Combustion via Microgravity Experiments (ACME): The crew replaced Nitrogen/Oxygen manifold bottles in support of the continuing s-Flames investigation. The ACME experiment series being performed in the Combustion Integrated Rack (CIR) includes five independent studies of gaseous flames. The primary goals of ACME are to improve fuel efficiency and reduce pollutant production in routine fuel combustion activities on Earth.  Its secondary goal is to improve spacecraft fire prevention through innovative research focused on materials flammability.

Hourglass: The crew swapped out the SD data card from PL Control Box S/N 002 to allow ground teams to continue data downlink. Hourglass investigation examines the relationship between gravity and the behavior of granular materials such as regolith that covers the surface of planets and planetary-like bodies. Researchers observe various granular materials inside an hourglass and a measuring cylinder under different gravity conditions. Better understanding of the behavior of these materials supports the design of spacecraft for future missions landing on the surfaces of planets and other celestial bodies.

Multi-use Variable-g Platform (MVP): The crew replaced the hard drive inside the Multi-use Variable-g Platform 1 in preparation of Cell-03 operations. The commercially developed, owned and operated Techshot MVP includes 2 internal carousels that simultaneously can produce up to 2 g of artificial gravity. MVP is used to conduct research in space with a wide variety of sample types, such as fruit flies, flatworms, plants, fish, cells, protein crystals and many others.

Systems 

HII Transfer Vehicle (HTV)9 Cargo Operations: Today, the crew began HTV9 cargo transfer operations by unloading cargo from the HTV corridor.  The vehicle delivered four tons of supplies, parts, and experiment hardware.

HTV Rendezvous Hardware Tool Cleanup: As part of closeout ops from HTV9 capture/berthing, the crew returned the Centerline Berthing Camera System (CBCS) and Vestibule Outfitting Kit (VOK) today to their appropriate stowage locations. The CBCS supports Common Berthing Mechanism (CBM) mating alignment operations necessary to berth a vehicle to Node 2. The VOK is a toolkit the crew uses during berthing operations.

Completed Task List Activities:

  • Vacuum Cleaner Set Up
  • PCS Laptop Relocate (Post HTV)

Today’s Ground Activities:
All activities are complete unless otherwise noted.

  • CIR Ops Ground Support

Look Ahead Plan

Wednesday, 5/27 (GMT 148)
Payloads:

  • ISS Experience Node 2 setup (NASA)

Systems:

  • Emergency Equipment Gather – Dragon
  • PCS Relocate
  • COL1O2 ZSR Prep & Transfer
  • Docking Dragon Monitoring Tools Setup
  • SSC Relocate for Dragon Docking

Thursday, 5/28 (GMT 149)
Payloads:

  • Food Physiology Brief (NASA)
  • ISS Experience Recording Demo-2 Dragon hatch open (NASA)

Systems:

  • Crew Dragon Docking
  • ISS Safety Briefing
  • Dragon/ISS IAS Audio Checkout
  • SODF Deploy

Friday, 5/29 (GMT 150)
Payloads:

  • RADi-N2 Deploy in NOD103 Rack Front (CSA)
  • FSL Soft Matter Dynamics container exchange (ESA)
  • ISS Experience Hardware Stow (NASA)

Systems:

  • OBT Dragon Debrief Conference
  • Dragon Emergency Review
  • Emergency Equipment Transfer
  • PCS Checkout
  • Dragon Cargo Ops
  • Dragon/ISS IAS Audio Checkout

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • Check and Report the Results of Antivirus Scanning on Auxiliary Computer System [BKC]
  • Hourglass SD Card exchange on PL Control Box S/N 002 for data downlink
  • UV-ATMOSPHERE. Payload Hardware Powerdown & Closeout Operations
  • Monitor RSK1 Laptop Battery Charge
  • Node2 HD Camera Activation [ABORTED]
  • Monitoring and Photography of BD-2 Carriage Position
  • Life on ISS Photo and Video
  • Combustion Integrated Rack Manifold #2 & #4 Bottle Replacement
  • Regenerative Environmental Control and Life Support System (RGN) Wastewater Storage Tank Assembly (WSTA) Fill
  • Preparation for 800A Unit R&R in the FGB Power Supply System (СЭС) Battery Module 3. Work Space Setup
  • Health Maintenance System (HMS) ISS Food Intake Tracker (ISS FIT)
  • Centerline Berthing Camera System (CBCS) and Vestibule Outfitting Kit (VOK) Restow
  • Systems Operations Data File (SODF) Print
  • Monthly Inspection of Video Recording Equipment on the ISS RS
  • Vacuum Cleaning of the FGB ГА
  • Transfer Operations – Unpack items from HTV
  • Multi-use Variable-g Platform Hard Drive Replacement
  • URAGAN. SOVA Hardware and Photo Equipment Setup and Activation
  • Countermeasures Systems (CMS) Exercise Equipment Gather
  • On-Board Training (OBT) Conference after CBT reviews