ISS Daily Summary Report – 9/14/2020

Payloads

Burning Rate Emulator (BRE): The crew reconfigured the ACME hardware in preparation for BRE experiment runs. This includes swapping in Igniter Arm #2. The Burning Rate Emulator (BRE) investigation is conducted in the Combustion Integrated Rack (CIR) on the International Space Station (ISS), as part of the Advanced Combustion via Microgravity Experiments (ACME) project. In this fire safety study, the flammability of solid and liquid materials is simulated by burning gaseous fuels under key conditions corresponding to the solid and liquid materials. This technique has been demonstrated for a wide variety of materials in normal-gravity and could provide an efficient way to screen and select fire-resistant materials for use in spacecraft, if the technique is similarly effective in microgravity.

Light Microscopy Module (LMM): The crew removed the ACE-T4 module and configured the LMM for Confocal Target test operations. The Light Microscopy Module (LMM) is a modified commercial, highly flexible, state-of-the-art light imaging microscope facility that provides researchers with powerful diagnostic hardware and software onboard the International Space Station (ISS). The LMM enables novel research of microscopic phenomena in microgravity, with the capability of remotely acquiring and downloading digital images and videos across many levels of magnification. The way that matter is organized and moves on the microscopic level profoundly affects the macroscopic world and an understanding of such processes helps scientists and engineers build more efficient materials and machines both for both the earth and space environments.

Systems

Robotics External Leak Locator (RELL) Checkouts: Today, robotic ground controllers (ROBO) activated the Mobile Servicing System (MSS) Special Purpose Dexterous Manipulator (SPDM) and are currently in the process of performing checkouts of the two RELL units that are stowed in the Robotic Tool Stowage (RiTS). RELL survey operations are planned for the Radiator Beam Valve Modules (RBVM) of the S1 truss Heat Rejection System (HRS). The RELLs are mass spectrometer “sniffers” that will be used to assist in the investigation of possible External Active Thermal Control System (EATCS) anhydrous ammonia (NH3) leaks. The EATCS coolant loops cool external electrical systems as well as transport heat away from internal water cooling systems that are required keep critical ISS avionics from overheating.

Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Water Recovery System (WRS) Sample Analysis & Data Record: Crew performed an analysis of the water processing assembly (WPA) using the TOCA. The TOCA unit oxidizes organic carbon species present in the water to carbon dioxide gas and measures the concentration using nondispersive infrared spectroscopy. Analysis of the potable water using the TOCA occurs on a weekly basis. The crew replaced the TOCA Waste-Water Bag (WWB) just prior to the sample collection to preclude overfill.

Completed Task List Activities:

  • Rodent Habitat Locker Relocate
  • JEM Stowage Consolidation for NG-14
  • EHS Water Kit Consolidation
  • JEM Stowage Consolidation
  • Build and R&R of the WHC ЕДВ-У
  • WHC KTO Replace

Today’s Ground Activities:
All activities are complete unless otherwise noted.

  • Robotic External Leak Locator (RELL) checkouts in preparation for the S1 Radiator Beam Valve Module (RBVM) scans.

Look Ahead Plan

Tuesday, 9/15 (GMT 259)
Payloads:

  • ELF S/W cable connect and update (JAXA)
  • MSG-LLC update (NASA)

Systems:

  • WHC Manual Fill
  • Recycle Tank Drain 

Wednesday, 9/16 (GMT 260)
Payloads:

  • Confocal Microscope checkout (JAXA)
  • MUSES Server vent clean (NASA)

Systems:

  • Crew Quarters 9V Battery R&R
  • EHS Acoustic Monitor Setup
  • CMS T2 SD Card Operations

Thursday, 9/17 (GMT 261)
Payloads:

  • FIR-ACE-Ellipsoid reconfig (NASA)

Systems:

  • Recycle Tank Drain
  • JPM Cabin Smoke Detector Cleaning
  • UTS Offload & EDV Swap
  • Recycle Tank Fill
  • EHS Acoustic Monitor Setup for Static Measurements

Today’s Planned Activities:
All activities are complete unless otherwise noted.

  • Setup for temperature measurements of battery #5 ПТАБ-2 (A305) unit case and connectors.
  • Temperature measurements of case and connectors of battery #5 ПТАБ-2 unit (A305).
  • TBU (Universal Bioengineering Thermostat) (ТБУ). Check for ТБУ-[B] No.07 temperature and un-obstructed area available in front of ТБУ-[B] inlet and outlet ports.
  • EDV-SV or EDV (KOV) fill (separation) for ELEKTRON-VM
  • Temperature measurements of case and connectors of battery #5 of ПТАБ-2 (A305) unit (in case of ДПР3 tripping).
  • Combustion Integrated Rack hardware gather.
  • ACME MWA preparations.
  • “Plazma-03” consumables audit.
  • LMM target configuration.
  • Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Water Recovery System (WRS) Sample Analysis and data record.
  • Combustion Integrated rack chamber open.
  • ACME chamber insert configuration.
  • Inspection and photography of “Tranzit-Korona” АММ antenna in MRM1
  • Changeout of Dust Filters ПФ1, ПФ2 (ФГБ1ПГО_4_424_1, bag 435-20 (00071061R)) or МИМ1_ЛБ_208, bag 442-11 (00076766R). Discard the removed items. Update IMS and cleaning [В1], [В2] fan screens in DC1.
  • UF-ATMOSPHERE. Hardware installation and electrical circuit setup.
  • Combustion Integrated Rack front end cap close.
  • UF-ATMOSPHERE. Scientific hardware activation and monitoring.